AndrewOC
14th November 2012, 06:32 PM
Hi all,
apologies for putting this on The Smithy forum rather than welding and Fab, but I don't know a metal fabber that would have need for a ~300 litre quench tank. ;)
240841
At first I had only mounted the 6" leg vice on the I beam (that is now between vice and the tank). This was alarmingly unstable- leg vices are very front heavy.
Now the tank holds it up, it all can be moved with the pallet jack and one may take a bath in hot weather.
enjoy,
AndrewOC
apologies for putting this on The Smithy forum rather than welding and Fab, but I don't know a metal fabber that would have need for a ~300 litre quench tank. ;)
240841
At first I had only mounted the 6" leg vice on the I beam (that is now between vice and the tank). This was alarmingly unstable- leg vices are very front heavy.
Now the tank holds it up, it all can be moved with the pallet jack and one may take a bath in hot weather.
enjoy,
AndrewOC