Thanks Thanks:  0
Needs Pictures Needs Pictures:  0
Picture(s) thanks Picture(s) thanks:  0
Results 1 to 10 of 10
  1. #1
    Join Date
    Aug 2016
    Location
    Brisbane
    Age
    57
    Posts
    1,315

    Default How to get wood rack brackets aligned?

    I am custom making a wood rack 300mm below the ceiling to store one row of timber horizontally.
    5 brackets which I will screw into the studs in my garage. How do I get these to all be inline with each other? I'm afraid they will end up slightly out of line but I do tend to over think everything. Is it really not that important to that the rack brackets mm perfect?
    The plan is to have each bracket screwed to the wall with 2 x 100mm screws. 100mm because there's 50mm of bracket plus gyprock before reaching the timber stud.
    So I thought about making the holes over sized so I had wiggle room to adjust the brackets but that won't work because once they are loaded up they will slip in the oversize holes.

    Note that bracket is 90 degrees rotated in photo. Blue part will be horizontal.

    I bought a rack kit and cut it into 5 parts. So each bracket will only be about 200mm tall. Then it needs a spacer which will be MDF. See photo. I am also adding a extra spacer of melamine to spread the pressure against the plaster wall. The photo shows a dry assembly. The horizontal blue part is longer than the vertical black part but I am hoping the 2 x 100mm 12G screws can handle it. If it fails I'll swap them for 3 x 125mm 14G screws. I made the vertical part 200mm because I want to use that 300mm just under the ceiling and about 100mm is cornice.

    I cut the black part with an angle grinder. Rough as guts. So I can't use either end of the black part as a reference.
    I look forward to your suggestions as to how I make these slightly adjustable so that I can get the horizontal blue arms all aligned when I screw them to the wall. Equally let me know if I am worrying about nothing and I should just try to get them as close as I can with a level and it will be good enough.

    Sent from my SM-S906E using Tapatalk
    My YouTube channel: https://youtu.be/2_KPRN6I9SE

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Age
    2010
    Posts
    Many





     
  3. #2
    Boringgeoff is offline Try not to be late, but never be early.
    Join Date
    Apr 2011
    Location
    Bakers Hill WA
    Age
    75
    Posts
    1,077

    Default

    I'd measure down from the ceiling or you could fix both ends and then pull a string line through nice and tight to align the other three.

    Cheers,
    Geoff.

  4. #3
    Join Date
    Aug 2016
    Location
    Brisbane
    Age
    57
    Posts
    1,315

    Default

    P.S. silly me. I just remembered that I have a laser level. So now I'm wondering how I am going to get my laser precisely 2400mm into the air. This is what I should be thinking about.

    Sent from my SM-S906E using Tapatalk
    My YouTube channel: https://youtu.be/2_KPRN6I9SE

  5. #4
    Join Date
    Aug 2016
    Location
    Brisbane
    Age
    57
    Posts
    1,315

    Default

    Quote Originally Posted by Boringgeoff View Post
    I'd measure down from the ceiling or you could fix both ends and then pull a string line through nice and tight to align the other three.

    Cheers,
    Geoff.
    Yes. Thanks. Love it! Simples. I do have a string line level buried somewhere. Plus I just remembered I have a laser level if I can figure out how to get the laser that high onto the air. Plain forgot I have the perfect tool. [emoji23]

    Sent from my SM-S906E using Tapatalk
    My YouTube channel: https://youtu.be/2_KPRN6I9SE

  6. #5
    Join Date
    Aug 2004
    Location
    Brisbane
    Posts
    4,986

    Default

    If the uprights are all slightly different lengths choose the longest one and install it against the cornice at one end. Measure to the bottom of the installed bracket and transfer the mark to the other end. Take the next longest one and install it aligned to the mark. It will at most be within mm of the other so not noticeable over the distance. Clamp a straight edge between the two or a really straight piece of timber to the arms of the two and bring the others up to it and install. Alternatively use a very tight string line. Space the string line off the two end arms with a spacer like a 20c piece or it could be pieces of ply. Bring the intermediate spacers into position with another 20c piece on top until it is just kissing the string and install. Repeat for each bracket. The spacer prevents each installed bracket from interfering with the line of the string.

  7. #6
    Join Date
    Jun 2013
    Location
    Geelong
    Posts
    428

    Default

    You have a laser level, so you have the perfect tool. If you have a piece of timber make a story stick. If the laser is set at 1mtr and you need a line at 2 mtr then mark a point 1mtr on the story stick hold this mark on the laser line and voila, transference has occurred.
    cheers

  8. #7
    Join Date
    Oct 2018
    Location
    Dandenong Ranges
    Posts
    1,902

    Default

    The string line will be better than a laser because you can line up the front edge/tip of the brackets (these may not all be at 90°/ made the same). Laser is great to find level (and mark locations on the wall) but I would think that a straight line is more important (any height discrepancies at the rear of the bracket, where it meets the wall, can be packed out)

  9. #8
    Join Date
    Jul 2005
    Location
    Oberon, NSW
    Age
    63
    Posts
    13,360

    Default

    This is a job where a simple water level would be sufficient. Just a long length of clear tube filled with water.

    The best thing about a water level is that it works around corners or situations where line of sight is interrupted; the hose doesn't care where it's being run, it's only the water-level at each end that's important. Does take a bit of getting used to, but the price is certainly right.
    I may be weird, but I'm saving up to become eccentric.

    - Andy Mc

  10. #9
    Join Date
    Apr 2019
    Location
    NSW
    Age
    38
    Posts
    1,136

    Default

    don't over think it.

    even if they're slight out of height with each other... just pack out the top till they're all level??

  11. #10
    Join Date
    Jul 2013
    Location
    Dubbo, NSW
    Posts
    34

    Default

    Quote Originally Posted by Skew ChiDAMN!! View Post
    This is a job where a simple water level would be sufficient. Just a long length of clear tube filled with water.
    To make the water easier to see, add some red food colouring. Works a treat.

Similar Threads

  1. N.S.W. Triton Wood Rack
    By Steven hay in forum WOODWORK - Tools & Machinery
    Replies: 2
    Last Post: 6th February 2020, 10:12 PM
  2. N.S.W. Tritan Wood Rack
    By Steven hay in forum WOODWORK - Tools & Machinery
    Replies: 1
    Last Post: 6th February 2020, 08:28 PM
  3. My version of a wood rack
    By John G in forum WOODWORK - GENERAL
    Replies: 4
    Last Post: 1st February 2010, 11:43 AM
  4. WIP Wood rack
    By scooter in forum WOODWORK PICS
    Replies: 44
    Last Post: 10th August 2006, 02:15 AM
  5. Triton Wood Rack
    By craigb in forum TRITON / GMC
    Replies: 1
    Last Post: 29th October 2002, 11:14 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •