Page 1 of 2 12 LastLast
Results 1 to 15 of 18
  1. #1
    Join Date
    Jul 2009
    Location
    Western Australia
    Posts
    13

    Default Thought i should say Hi

    Hi to everyone out there, my name is Craig, i have been a member of this forum for a while.
    Thought i should introduce myself. I live in Manjimup in the Southwest of W.A and have only just started milling my own wood. I have been mucking around for a while in woodwork and have always enjoyed it from when i was in Highschool.
    I use a Wesford Rail Mill with a Husky 3120 and a 6 foot bar for my milling, and have recently aquired a Yas Engineering Slabmaster, the bed is 4 mt length x 1.4 mt width
    i have done Jarrah, Marri, Blackbutt and burls on it so far. What do you guys use and think of what you have i know i love mine

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many





     
  3. #2
    Join Date
    Jul 2013
    Location
    Perth
    Posts
    665

    Default Gday Craig

    G'day Craig,

    Please put up some picks of your Wesford rail mill in action if you can?
    I was looking at one at the wood show last week and they seem to be great little unit.
    I lived nearbye you in Nannup for ~ 19odd years & had Timeless Timber Treasures in the LIA for that period in partnership with my father from ~ 1987 - 2006. Used to mill a lot of jarrah with a Lewis mill etc. These days my eldest lad lives in Collie and is keen to get a Jarrah Flitch or 2 with his chainsaw for bar top and outdoor table etc hence the interest in the Wesford rail mill.
    Gods own country the southwest & its forest...fond memories of Nannup & Manjimup.
    Caught a lot of trout back in the day round Nannup and Manji, and some nice Redfin in dams round Manji and in the Warren R down at Pembi.
    Miss the place some days.

    Cheers

  4. #3
    Join Date
    Jul 2009
    Location
    Western Australia
    Posts
    13

    Default

    As soon as i work out how to do this on my ipad i will put a couple of pictures up

  5. #4
    Join Date
    Jan 2009
    Location
    Perth
    Posts
    1,257

    Default

    Come on Gents
    We need some milling pictures

    Willy
    jarrahland

  6. #5
    Join Date
    Jul 2009
    Location
    Western Australia
    Posts
    13

    Default Wesford Rail Mill

    image.jpgimage.jpg

    here are 2 photos of my Wesford Rail Mill in action

  7. #6
    Join Date
    Jul 2013
    Location
    Perth
    Posts
    665

    Default Way to go

    Way to go Craig,
    That looks like a Marri log with all that keno...(sap lines).
    When they dry they will come up pretty schmick I reckon.
    Looks like that Husky is eating it up too.
    Must send a link of this to my young bloke.

    Cheers for that!

  8. #7
    Join Date
    Jul 2009
    Location
    Western Australia
    Posts
    13

    Default

    Takes 3 minutes to cut a slab this long, 3.4 meters, this one was classed as A grade Marri.
    if you want any more pictures just let me know,

  9. #8
    Join Date
    Nov 2006
    Location
    Cedarton
    Posts
    4,905

    Default

    Quote Originally Posted by Skip64 View Post
    image.jpgimage.jpg

    here are 2 photos of my Wesford Rail Mill in action
    Wish i had one...they will sneak into places that the lucas or tractor can't go ..have seen many a good slab peel off the ol' Westord mill,a great innovation in milling...MM
    Mapleman

  10. #9
    Join Date
    Jul 2009
    Location
    Western Australia
    Posts
    13

    Default

    So between the Wesford rail mill and the Yas Slabmaster now i have it made

  11. #10
    Join Date
    Jan 2011
    Location
    Ormeau, Gold Coast, Australia
    Posts
    2,491

    Default

    Gidday Craig, welcome aboard, may your journey be a pleasant one.
    Regards Rumnut.

    SimplyWoodwork
    Qld. Australia.

  12. #11
    Join Date
    Jun 2003
    Location
    Gatton, Qld
    Age
    48
    Posts
    3,064

    Default

    g'day Craig, welcome mate, hope you have a heap of fun here and even more makin sawdust
    I love my Lucas!! ...just ask me!
    Allan.

  13. #12
    Join Date
    Jul 2009
    Location
    Western Australia
    Posts
    13

    Default

    Just ordered some add ons for the Yas Slabmaster. Keith the owner of Yas engineering was great to talk to all the way over there in Queensland and is a wealth of knowledge. We have ordered the router, drill and power saw attatchments. I have been having numerous queries from people wanting slabs dressed but i dont know what a reasonable price is, what would people here think is a reasonable price? And be preparred to pay without going overboard?
    looks like extensions to our shed might be in the works lol

  14. #13
    Join Date
    Jul 2009
    Location
    queensland
    Posts
    129

    Default

    LOL, funny how a simple thing like a new slabber turns into an new shed, new saw, new ute, new trailer and new anything else ya might need, as ya get more into it and the more fun ya start having and the more orders you are gonna get.
    Enjoy

    Skippy

  15. #14
    Join Date
    Jul 2009
    Location
    Western Australia
    Posts
    13

    Default

    Pleased with the Yas slabmaster, it has dressed everything i have thrown at it so far, including Burls

  16. #15
    Join Date
    Jul 2013
    Location
    Perth
    Posts
    665

    Default Maybe

    Maybe as a suggestion - work out how long it takes you to surface a slab time wise, and calculate it's square surface area...to get a square meter rate per hour of production.

    Then allow what you think is a reasonable wage to earn per hour ($80 an hour?) if your supplying the machine know how and power etc

    Just work out a square meter rate that returns you the hourly rate you need to earn to pay your bills, feed your tin lids and keep a roof over your head etc.

    Allow in that rate - a percentage for wear and tear, consumables, and a depreciation rate on the equipment if its likely to wear out and need replacement... so lets say 15% a year for 6 or 7 years before you need to replace the Yas slabmaster?. So you need to allow that proportion of the total capital acquisition cost of the machine as well on an annualized basis (how many M^2/year the machine will be producing) - that way when the machines worn out and you need to replace it, you'll have earned enough to be able to do so - and you won't be subsidizing others wood projects with depreciation and wear of your gear...and be left high and dry when its no longer working and needs to be replaced.

    Some guys work on a rough formula of 1/3 for your labor, 1/3 for materials & 1/3 for overheads (power, water, lights, your vehicle, sharpening & maintenance etc).

    So if your after say $80 an hour for your labor - you'd need ~$240 an hour for labor, materials & overheads... divided by how many square meters an hour you can do....gives you a starting point for working out a square meter rate.

    That way everyone pays the same M^2 rate and any time it's working it's making you $80 an hour...as well as covering its own depreciation and maintenance / replacement costs.

    Maybe others have a different idea....on how to set an acceptable rate. Can some one else do the same job much faster and cheaper, with for e.g. a wide thicknesser in a couple passes? I.e. can someone else out compete your technology with a different machine?

    So once you work out your preferred rate you have to see if your competitive with the marketplace... and maybe adjust upwards if the market will bear it or downwards if it won't and you need to be competitive to get the work.

    My wise old accountant once said "you'll never go broke making a profit" so your calculation SHOULD include a modest profit margin percentage - there's not much point running a business to just make wages - you have to do all the paperwork for BAS (GST) etc so a business should make a profit if it is to grow and expand over time.

    Somewhere within all that calculation is hopefully a price that will work for both you and your customer/s.

    Others mileage may vary.

    edit - just remembered, if your an electrician or doctor / lawyer etc you should just imagine a very large number, double it, then double it again!

Page 1 of 2 12 LastLast

Similar Threads

  1. Thought for the Day
    By Ozkaban in forum WOODIES JOKES
    Replies: 1
    Last Post: 9th August 2011, 05:24 PM
  2. And i thought I had a bad day!
    By munruben in forum WOODIES JOKES
    Replies: 0
    Last Post: 5th December 2010, 10:58 AM
  3. Thought for the day
    By Barry Hicks in forum WOODIES JOKES
    Replies: 2
    Last Post: 22nd September 2007, 10:40 AM
  4. Thought for the day
    By Barry Hicks in forum WOODIES JOKES
    Replies: 1
    Last Post: 13th September 2007, 05:53 PM
  5. Thought of the day!
    By Shane Watson in forum WOODIES JOKES
    Replies: 10
    Last Post: 25th April 2002, 05:27 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •