Page 3 of 3 FirstFirst 123
Results 31 to 43 of 43

Thread: A build thread

  1. #31
    Join Date
    Aug 2010
    Location
    Horsham Victoria
    Posts
    5,713

    Default

    I need you at my place

    Dave TTC
    Turning Wood Into Art

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many





     
  3. #32
    Join Date
    Feb 2003
    Location
    back in Alberta for a while
    Age
    68
    Posts
    12,006

    Default

    Quote Originally Posted by Michael G View Post
    Beautiful setting and nice work, but every time I see those beams I do keep asking myself "How big is the granny?"
    If the rest of the structure is in keeping with what has been done so far it's going to be waaaay solid.

    Michael
    I'm a little worried by the span of those 200 UBs and the potential deflection once the glass goes in.

    I think resolving how the glass will be installed and mounted should be done now before a completed frame restricts access.
    regards from Alberta, Canada

    ian

  4. #33
    Join Date
    Jul 2013
    Location
    nsw
    Posts
    118

    Default glass etc

    gday Ian,

    Yes, bit of a concern.

    Perhaps not packing the head of the window casing will allow for any upward deflection. Downward deflection in the form of sag may have to be taken up by a sliding fit to the glass using flexible sealing products as the final weatherproofing?

    how much (mm) could the beam potentially deflect would you say? what sort of weights would cause significant deflection?

    Hopefully most weight will be over the piers, so outside actions and live loads ( jargon I've picked up ) could be a concern? im going to try and bring the inside legs of the columns as close to the pier tops as poss ( see below)

    twist, is the other action I guess?

    we'll double up on the large joists (150x80mm) at the centre line and hopefully use a strong flooring product @ 450 mm centres on the rest of the 150x80 lvl joists which span 2800mm roughly.....ie 2800mm between ub200s.

    im pretty sure it's safety glass, so shattering in a reasonably safe way is the worst case

    would welcome more discussion on the performance of the building.

    Meanwhile I painted the beams today....



    Quote Originally Posted by ian View Post
    I'm a little worried by the span of those 200 UBs and the potential deflection once the glass goes in.

    I think resolving how the glass will be installed and mounted should be done now before a completed frame restricts access.
    Attached Images Attached Images

  5. #34
    Join Date
    Feb 2003
    Location
    back in Alberta for a while
    Age
    68
    Posts
    12,006

    Default

    The risk I see is the window openings don't remain square.
    I'm not particularly worried about the glass breaking, more that you'll find it impossible to get a seal around the glass without destroying the look those large panes are designed to give.
    I'm guessing the glass will be triple glazed and each of those large windows will weight more than 100 kg.

    also now would seem a good time to trench for plumbing and other services.
    regards from Alberta, Canada

    ian

  6. #35
    Join Date
    Jul 2013
    Location
    nsw
    Posts
    118

    Default

    gotcha Mate. good thinking..........food for thought definitely

    i reckon oversize openings will be a must, with trimming taking up any out of square.

    thanks for the heads up!

    reminds me of some of the Reno/ design shows where the glass doesn't fit, they are sick of the onsite caravan and the missus is about to give birth while the weather sets in for winter .........hahaha

    Quote Originally Posted by ian View Post
    The risk I see is the window openings don't remain square.
    I'm not particularly worried about the glass breaking, more that you'll find it impossible to get a seal around the glass without destroying the look those large panes are designed to give.
    I'm guessing the glass will be triple glazed and rather heavy.

    also now would seem a good time to trench for plumbing and other services.

  7. #36
    Join Date
    Jul 2013
    Location
    nsw
    Posts
    118

    Default no better feeling

    no better feeling than running out of material and walking over the the scrap pile, having a rummage and coming up w it's exactly what you need!

    needed to cap the tops of some rhs to deny water ingress and under a heap of other junk was exactly the 40x ? flat bar I required : )

    now to outside corner welding practice
    Attached Images Attached Images

  8. #37
    Join Date
    Sep 2008
    Location
    Perth
    Posts
    363

    Default

    Those will be some thick caps.

  9. #38
    Join Date
    Jul 2013
    Location
    nsw
    Posts
    118

    Default thick caps

    Quote Originally Posted by Legion View Post
    Those will be some thick caps.
    yes the 40 mm part was perfect : )

    you know, with e71t gs flux core you only get one chance really.

    rated as a single pass wire since multi pass can mess with the weldment chemistry apparently.

    fabshield23 Hobart - got it at 1/3 price, so gave it a run.

    i do prefer having the security of a multi pass wire like nr211 mp from Lincoln.

    anyhow, seems to run well with good slag coverage tonight which I s a good indicator for me that I'm doing ok
    Attached Images Attached Images

  10. #39
    Join Date
    Apr 2013
    Location
    Bunbury WA
    Posts
    20

    Default

    My concern would be the stumps are pipe set in concrete. Eventually it will rust through at concrete level. For that reason you are better to put in a heavy plate and weld the pipe to it. When it does eventually go it is fairly easy to cut the bottom 6 inches out and insert a new bit. It will only be the bottom part that goes, the steel plate will out last the rest. Use a bitumen paint on it. I just replaced some SHS which was about 12 years old. It was in Port Hedland which is hot all the time and normally not a lot of rain but the last couple of years have been wet, but I would have hoped for 15 years.
    If they are dry under the house the life will be far better but on the outside where the rain blows in make sure you coat it well.

  11. #40
    Join Date
    Jul 2013
    Location
    nsw
    Posts
    118

    Default preliminary drawing

    customer has sent me this.

    not engineered yet.
    Attached Images Attached Images

  12. #41
    Join Date
    Sep 2008
    Location
    Perth
    Posts
    363

    Default

    I've always wondered - how are you going to bend the top beams? I've got a killer pipe/tube bender but it's not going to cut it for big beams like that and I wouldn't mind some curved pergola beams. I presume you get a workshop to do it for you, and they can do (within reason) any big radius curves?

  13. #42
    Join Date
    Jul 2013
    Location
    nsw
    Posts
    118

    Default curving, rolling steel

    yes, this will be farmed out to an engineering firm who has rollers to bend/curve the steel.

    from what a gather, the members are put through roller wheels and pressure is applied to one edge.

    the radius is 6523 mm. I wonder how accurate the machines are

  14. #43
    Join Date
    May 2011
    Location
    Murray Bridge SA
    Posts
    3,339

    Default

    Quote Originally Posted by meadow street View Post
    yes, this will be farmed out to an engineering firm who has rollers to bend/curve the steel.

    from what a gather, the members are put through roller wheels and pressure is applied to one edge.

    the radius is 6523 mm. I wonder how accurate the machines are
    Hi Chris, you are correct, that the members are put through a rolling machine, similar to this one below.



    Depending on the operator, he should be able to get within 1 mm of required diameter/radii.
    I used to get a lot of rolling done, a company called Treggonings in Underdale, all within 1 mm diameter.
    Kryn

Page 3 of 3 FirstFirst 123

Similar Threads

  1. Build Thread: A Goat in New York
    By BrianMCarney in forum Michael Storer Wooden Boat Plans
    Replies: 69
    Last Post: 8th April 2015, 02:29 AM
  2. Build Thread: GIS in upstate New York
    By newchatham in forum Michael Storer Wooden Boat Plans
    Replies: 20
    Last Post: 31st March 2015, 01:23 PM
  3. Ultimate DIY Cyclone Build Thread
    By HeadScratcher in forum DUST EXTRACTION
    Replies: 66
    Last Post: 11th January 2013, 09:02 PM
  4. Neckthru Build thread
    By demonx in forum MUSICAL INSTRUMENTS
    Replies: 8
    Last Post: 10th June 2012, 08:42 AM
  5. Build Thread
    By Sheets in forum JAPANESE HAND TOOLS
    Replies: 80
    Last Post: 30th July 2010, 08:05 AM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •