    I've been pondering over the gantry sides I need to fabricate. What I was thinking was making each side out of 16mm Al plate in three pieces. I could either machine a rabbet in each piece where it joins and bolt them together or bolt a seperate plate to cover the two joins to hold them together.

    The dotted lines on the attached pic shows where I would have the rabbet, or if I went with a cover plate, the outside lines would be where the join is.

    Any thoughts on the strength of this?

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Age
    2010
    Posts
    Many





     
  3. #107
    Join Date
    May 2003
    Location
    Perth WA
    Posts
    3,784

    Default

    Hi John,
    There are three areas of important in the design. The 6 holes for the Y axis connection, the three holes and rebate for the X axis connection and the relationship between both of those design elements. The rest of the part provides strength for the connection and allows an area for coneection of the ballscrew.

    I think any join in that plate will weaken the part and depending on the area to be joined could introduce a variable between the three elements I detailed above.

    Given you have a limitation on the size you can machine I would do one of two things.

    Make a jig with position pins so that you can index the job on your mill and cut it as a whole unit. This can be done my making two jigs and clamping the ally to one and using the two jigs to index the job or just use the ally and one jig and use the bolt patterns to index the job. I know this will be a pain as you will have to make a dulpicate set as the gantry sides are mirror images and you will have to get your mdf machine up and running to make the jigs. You could test your indexing by making a MDF mock up of the gantry side.

    The second option is to position the job so that you can drill the 6 bolt pattern and the 3 bolt pattern and the rebate in one setting then cut the outside on a bandsaw. Print out your drawing and temporarly glue the paper to the ally as a guide.

    I am assuming you are going to cut the plate on your mill.
    Cheers,
    Rod

  4. #108
    Join Date
    Jul 2006
    Location
    Bundaberg, QLD
    Age
    56
    Posts
    502

    Default

    Thanks Rod,

    Back to the drawing board. I think I was thinking too hard about this.

    My MDF router is still going as the Ozito routers are fairly cheap to swap over. So I may as well do you and Alan suggested. I can get the holes drilled and hopefully the rebate for X Axis plate done on that. Then bandsaw the outside profile. I'll need to double check the 16mm plate to make sure it's reasonably flat when I get home. If not I'll go with the 21mm plate as I know that is flat.

    I better get a move on as my MDF Router is going to a new home in Bendigo the weekend after next.

  5. #109
    Join Date
    May 2003
    Location
    Perth WA
    Posts
    3,784

    Default

    Hi John,
    I can see where you were coming from - it is nice to be independent and do it all yourself.
    The rebate will be the hardest on your MDF machine so reduce your pass depth to match the Ozito and rigidity of the machine. Test fit the rebate before you de-mount the job as I have found variation in cutters that cause problems. Easy enough to enarge the slot while it is still mounted on the machine.
    Cheers,
    Rod

  6. #110
    Join Date
    Jul 2006
    Location
    Bundaberg, QLD
    Age
    56
    Posts
    502

    Default

    After much gnashing of teeth, I finally have two gantry sides done.

    The outside profile is a bit rough with my dodgey bandsaw skills, but doesn't look too bad after a bit of touch up on the spindle sander.

  7. #111
    Join Date
    Jan 2006
    Location
    Moss Vale NSW
    Age
    80
    Posts
    317

    Default

    John,
    That will clean up nicely, but the important thing is that you have the rebate and the holes accurate so that everything will run true on your rails. If there is a minor discrepancy in the outside shape, no one will pick that from one side of the gantry to the other.

    Keep up the good work.

    Cheers,

    Alan
    4 out of 3 people have trouble with fractions.

  8. #112
    Join Date
    Jul 2006
    Location
    Bundaberg, QLD
    Age
    56
    Posts
    502

    Default

    I had a model boat meet on this morning so I only got a few hours in the shed this arvo.

    I had to prep the stock for the gantry connector plates, which took at bit of time. I did manage to get one cut and test fitted. Hopefully I'll get the other one done tomorrow after work.

  9. #113
    Join Date
    Jul 2006
    Location
    Bundaberg, QLD
    Age
    56
    Posts
    502

    Default

    I did a bit of a clean up so I thought I might take a couple of pics while things are semi clean (please ignore the collection of "stuff" under the CNC)

    The gantry is now mounted and moves along the X Axis The next step is to machine up the mounts for the Y Axis ballscrew and stepper.

  10. #114
    Join Date
    Nov 2009
    Location
    Perth, Western Australia
    Posts
    1

    Default

    Excellent work there John.

    She is definately coming together very well. I finally bit the bullet and decided to register on here.

    Just trying to determine what I want to build now I have "command approval" for a CNC project.

    Hmmmmmm too many ideas, where to begin

    Keep up the great work

    Johno

  11. #115
    Join Date
    Jul 2006
    Location
    Bundaberg, QLD
    Age
    56
    Posts
    502

    Default

    Hi Johno,

    Welcome aboard! Good to see a fellow model boater here.

    There are plenty of people here to bounce ideas off so feel free to start a new thread to refine your plan. There is also a group of CNC'ers over in Perth who should be able provide a demo of their stuff so you can get some good ideas too.

    Cheers
    John

  12. #116
    Join Date
    Jul 2006
    Location
    Bundaberg, QLD
    Age
    56
    Posts
    502

    Default

    Busy weekend but not on my build unfortunately.

    I spent a few hours on Saturday showing the new owner of my MDF CNC how it all works. He's a member in this forum so we might see him around this CNC section now.

    I bored out the pulleys centres on the lathe to fit the shafts on the steppers and ballscrews. Did a test fit with the belts to see how they looked.

    I also started on the Y Axis motor mount but have stopped the job as it's getting a bit late. I still need to do the motor pocket and outside profile cuts on the part.

  13. #117
    Join Date
    May 2003
    Location
    Perth WA
    Posts
    3,784

    Default

    Hi John,
    That is starting to look like it will work now.
    Interested to see your clamping arrangment on the mill - I know what you are using just can't see from the photo how it is holding down that plate.
    Cheers,
    Rod

  14. #118
    Join Date
    Jul 2006
    Location
    Bundaberg, QLD
    Age
    56
    Posts
    502

    Default

    Hi Rod. Nothing special on the clamping as it is just my mill vise with a couple of parallel bars to raise the part up.

    EDIT: Here is a better photo that shows it is actually in the vise and not floating on top

    Oh and got the motor pocket cut this arvo too

  15. #119
    Join Date
    Jul 2006
    Location
    Bundaberg, QLD
    Age
    56
    Posts
    502

    Default

    Got some shed time in today and the Y axis ballscrew is now mounted. I'll need to shift the bottom rail along so I can centre the ballscrew on the axis.

    Plus I need to get a longer belt as I didn't realise this one was longer than the X Axis ones when I got the part files of Rod. That will learn me for not checking, but no big dramas as it will be a little while before I'll need it.

    I met up with a guy at work who is an Electrical Engineer and he came and had a look at my machines as he is looking at getting one. He is going to give my electrickery set up a once over after I have wired it all up. This will be great as I wasn't keen on flicking the switch without someone giving it a double check.

  16. #120
    Join Date
    May 2003
    Location
    Perth WA
    Posts
    3,784

    Default

    Hi John,
    Looking good there.
    Cheers,
    Rod

Page 8 of 10 FirstFirst ... 345678910 LastLast

Similar Threads

  1. Some ones got to build it!
    By scottyk in forum BOAT BUILDING / REPAIRING
    Replies: 69
    Last Post: 25th June 2009, 02:12 AM
  2. Another first build
    By Misterwippy in forum MUSICAL INSTRUMENTS
    Replies: 24
    Last Post: 6th January 2009, 12:01 PM
  3. New Build
    By xray in forum MUSICAL INSTRUMENTS
    Replies: 2
    Last Post: 27th August 2008, 09:52 PM
  4. Build an Arc?
    By bennylaird in forum NOTHING AT ALL TO DO WITH WOODWORK
    Replies: 10
    Last Post: 16th November 2006, 08:26 AM
  5. Buy or Build
    By oges in forum WOODWORK - GENERAL
    Replies: 17
    Last Post: 27th September 2005, 10:38 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •