Thread: Levelling the Shed Floor
-
18th December 2018, 03:54 PM #46
the compactus is for stuff other than timber.
Fully agree that I should sort out storage. For example, if I go yellow tongue on joists, then that will probably not be strong enough to support storage racks, so would probably have in think about piers under the racks. Unsure if the brick wall is strong enough to hang racks, and as its a parapet wall Council probably have a rule....
No, no, no! As Tonzoeyd said "Do it properly". I want the entire floor accessible - not a storage area! - and usable as a work area, and the floor under the storage racks needs to be a reference surface, or those racks won't be level and straight.
I have not yet consulted a concreter, but I was thinking of 25 mm over the peaks - and therefore 85 mm in the troughs. At the side door, the existing floor is about 65 mm below the door sill, so a raise in floor height is not a major issue.
I was unaware of this product. Dr Google says Bunnings have several products ranging from the same price as self levelling concrete to about half that cost. I know nothing about the ease of application or its benefits over concrete.
https://www.bunnings.com.au/compare?...960343,0960344,regards from Alberta, Canada
ian
-
18th December 2018 03:54 PM # ADSGoogle Adsense Advertisement
- Join Date
- Always
- Location
- Advertising world
- Age
- 2010
- Posts
- Many
-
18th December 2018, 04:22 PM #47
Thanks Ian
All comments have been taken onboard. We are getting there:
.....that's what laser levels are for -- to provide a reference surface (and vertical) independent of any irregularities in the floor or walls.....
The area under the racks will amount to less than 15% of total floor area, so not convinced that there will be a significant time or cost saving from not concreting them. If not smooth and level then will need to use spacers under every post.
Never thought of impact of aggregate size and for an order of, say, 2 m3, the likely reaction might be "...its all got 20 mm aggregate and its all about 25 mpa .....". Too small to get any choice.
I don't like what you said but unfortunately its probably correct and good advice.
Thanks
Graeme
-
18th December 2018, 05:52 PM #48GOLD MEMBER
- Join Date
- Apr 2018
- Location
- Nsw
- Age
- 64
- Posts
- 1,363
You will have no trouble ordering a topping mix from your local concrete supplier, they will have 10 mm aggregate in their yard which will cost about $10m3 more than standard 20mm and will also do a 6 mm aggregate if you want but they may not have it in stock and will charge a premium
Rather than over complicating this whole process have a chat to a Concretor and they will soon sort it out for you. Unless you need a laser I wouldn’t buy one just for this job, the Concretor will have one and set a few heights to work off
Unless you have a bit of a spend on a laser, the cheaper ones have a limited range and you cannot see the beam in a bright room so are more suited to a bathroom type scenario or for hanging a door or a picture, setting out light fittings etc
-
18th December 2018, 06:33 PM #49GOLD MEMBER
- Join Date
- Jun 2005
- Location
- Helensburgh
- Posts
- 7,696
A water level works really well for this situation...
CHRIS
-
19th December 2018, 03:15 PM #50
-
19th December 2018, 11:04 PM #51
Hi Guys
Hobart is in the middle of a building boom so most in the building trades have more work than they can handle, plus Christmas is upon us. Need to locate and have a chat with a concreter before I can advance this much more, I think.
Thank you for all the help so far.
Cheers
Graeme
Have a Great Christmas
-
20th December 2018, 04:33 AM #52
If you have the time try, ring and have a conversation with your local concrete batch plant -- after all it will be the batch plant that makes the mix you ultimately use. The concreter is just the blokes (and/or girls) who puts it in the form and levels the surface.
BTW
"pump mix" concrete has additives like super plasticizes that make the wet mix super "runny" -- for want of a better technical term. These cost extra compared to a "standard mix", but the extra cost can be balanced against a reduction in quantity.
e.g. using 20 mm aggregate, you might need to buy 4 cubic metres so you can a 100-120 mm topping slab.
using 10 mm aggregate, you might only need 2 cubic metres.
and if using smaller again aggregate, the quantity you need might be less than 1 cubic metre.
Have a Great Christmasregards from Alberta, Canada
ian