    I have stopped production, stacked my machinery and stored my stock timber(about 12-13 cubic metres worth) in my workshop since December 2014, during this time I went to South America on a solo bicycle tour for 4 months (from Ushuaia to San Pedro de Atacama, bordering Bolivia)

    Just before I stopped production I bought a huge sander (25hp twin belt 1100mm). which I have never turned on in my workshop because 1. Ducting layout and 2. power supply issue

    I always knew I need to spend some $$$ on the electrical and the ducting to make the sander work, I also need to re design the layout of the workshop, get a proper storage for the stock timber, moving machine around with different layout meaning longer lead for machines and more changes to the ducting layout. I have moved them around twice in the last 3 months.

    and just this weekend, I have finally (well, close to) completed reorganising the workshop, the only item left to do is to connect the Ceccato refrigerated dryer and the pre/post filter to the compressor (bought the dryer/filter setup in 2014 but never connected)

    here are some photos of the revised workshop:

    IMG_2681.jpg

    one of the achievement during this move is that I have finally managed to install that air cleaner....


    IMG_2689.jpg

    The dust extract on that mortiser is only 63mm. hugely inefficient. something to think about in the future.

    The hood on the SCM S400P is 100mm, but the manufacturer has made allowance so you can simply unscrew the hood and replace with something larger if you wish.


    IMG_2683.jpg
    The holytek bag house dust extractor will be replaced with an Alko or a Felder unit later this year, or early next year, or when I have enough money.


    IMG_2685.jpg
    IMG_2684.jpg

    Its ugly and there isnt much I can do. I dont have much ceiling space to play with. only 2.7m. the black flex is 150mm. the clear is 125mm.


    IMG_2686.jpg

    not quite finished.... the refrigerated dryer, the pre and post filter needs to be connected to the compressor.

    IMG_2688.jpg
    IMG_2687.jpg

    SCM 1100mm twin belt sander. The main motor of this beast is 25hp. It has star delta starter but I doubt it would work with my current power supply of 63amp, considering in rush amp would be 3-4 times FLC with Star delta, therefore I bought a Danfoss VT2800 VSD, the purpose of this is to limit the inrush current to the FLC of 34amp.

    The industrial electrical company I have hired advised to wire the main motor to the VSD and everything else on the sander runs on a different lead/source and they have done so, they gave me a good tutorial on the VSD operation, the manual for the VSD is as thick as a dictionary, A4 size.

    After the wiring was completed and main motor happily spinning I hired Jacks Machinery to do a calibration/service on the machine, we couldnt get the blower to work and after viewing the electrical diagram it was found the blower is connected to the Star-delta starter (which we disabled to connect to VSD), we reconnected the power supply of the blower to the belt motor. I took time off my daytime job so I can work with the technician on my machine so I know whats going on. It was time well spent.
    SCM L'Invincibile si X, SCM L'Invincibile S7, SCM TI 145EP, SCM Sandya Win 630, Masterwood OMB1V, Meber 600, Delta RJ42, Nederman S750, Chicago Pneumatics CPRS10500, Ceccato CDX12



  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many





     
  3. #2
    Join Date
    Nov 2007
    Location
    Albury Well Just Outside
    Posts
    13,315

    Default

    All I have to say is wow.

    Hopefully this is not going to change too much for a while.

  4. #3
    Join Date
    Feb 2003
    Location
    back in Alberta for a while
    Age
    68
    Posts
    12,006

    Default

    Now that's a serious bit of "octopusy"

    Workshop back in action after 14 months of inactivity.-img_2685-jpg
    regards from Alberta, Canada

    ian

  5. #4
    Join Date
    Feb 2003
    Location
    back in Alberta for a while
    Age
    68
    Posts
    12,006

    Default

    Quote Originally Posted by Albert View Post
    SCM 1100mm twin belt sander. The main motor of this beast is 25hp. It has star delta starter but I doubt it would work with my current power supply of 63amp, considering in rush amp would be 3-4 times FLC with Star delta,
    are you sure about that ?

    Dredging the memory from 42 years ago, the purpose of a star-delta connection is to limit the starting current to around 2x the full load current.
    Still a sizable wack on a 64 Amp circuit, but not enough to brown out the neighbours.
    regards from Alberta, Canada

    ian

  6. #5
    Join Date
    May 2013
    Location
    Auckland, New Zealand
    Posts
    997

    Default

    TBH I am getting mixed info from 2-3 to 3-4 times the FLC. taking the worst assumption here of 3-4 x FLC.

    I need spare capacity on the amp supply at startup because the extractor and compressor will be running... the compressor is 7.5kw, dusty is 4kw.
    SCM L'Invincibile si X, SCM L'Invincibile S7, SCM TI 145EP, SCM Sandya Win 630, Masterwood OMB1V, Meber 600, Delta RJ42, Nederman S750, Chicago Pneumatics CPRS10500, Ceccato CDX12



  7. #6
    Join Date
    May 2013
    Location
    Auckland, New Zealand
    Posts
    997

    Default

    the "octopus" is only a temporary until I upgrade the extractor.... however with my record, any setup that suppose to be temporary turns out anything but temporary lol
    SCM L'Invincibile si X, SCM L'Invincibile S7, SCM TI 145EP, SCM Sandya Win 630, Masterwood OMB1V, Meber 600, Delta RJ42, Nederman S750, Chicago Pneumatics CPRS10500, Ceccato CDX12



  8. #7
    Join Date
    May 2013
    Location
    Auckland, New Zealand
    Posts
    997

    Default

    Quote Originally Posted by Christos View Post
    All I have to say is wow.

    Hopefully this is not going to change too much for a while.
    Thanks! I too hope this wont change again for at least another 24 months!
    SCM L'Invincibile si X, SCM L'Invincibile S7, SCM TI 145EP, SCM Sandya Win 630, Masterwood OMB1V, Meber 600, Delta RJ42, Nederman S750, Chicago Pneumatics CPRS10500, Ceccato CDX12



  9. #8
    Join Date
    Feb 2006
    Location
    Perth
    Posts
    27,795

    Default

    Quote Originally Posted by ian View Post
    are you sure about that ?

    Dredging the memory from 42 years ago, the purpose of a star-delta connection is to limit the starting current to around 2x the full load current.
    The other thing to consider on something like that is a soft start circuit as it will help avoid broadcasting the startup to the neighbours.

    I also notice your ducting uses W junctions - three ducts joining at one point.
    For big DCs like yours it makes little difference but on small DCs this adds considerable turbulence and reduces flow compared to using 2 Ys one after the other - the further apart they are the better.
    I also realise that space sometimes precludes doing much else.

  10. #9
    Join Date
    May 2013
    Location
    Auckland, New Zealand
    Posts
    997

    Default

    Quote Originally Posted by BobL View Post
    The other thing to consider on something like that is a soft start circuit as it will help avoid broadcasting the startup to the neighbours.

    I also notice your ducting uses W junctions - three ducts joining at one point.
    For big DCs like yours it makes little difference but on small DCs this adds considerable turbulence and reduces flow compared to using 2 Ys one after the other - the further apart they are the better.
    I also realise that space sometimes precludes doing much else.
    Hi Bob. yes I understand the W junction adds turbulence... but there is no other way I can make it to work, the space and money is very limited.. if I had 5 m of ceiling height and at least $5,000 of ducting budget....
    SCM L'Invincibile si X, SCM L'Invincibile S7, SCM TI 145EP, SCM Sandya Win 630, Masterwood OMB1V, Meber 600, Delta RJ42, Nederman S750, Chicago Pneumatics CPRS10500, Ceccato CDX12



  11. #10
    Join Date
    Feb 2006
    Location
    Perth
    Posts
    27,795

    Default

    Quote Originally Posted by Albert View Post
    .. if I had 5 m of ceiling height and at least $5,000 of ducting budget....
    Don't we all.

  12. #11
    Join Date
    Jan 2010
    Location
    southern Fleurieu Peninsula, S.A.
    Posts
    234

    Default

    amazing set up, I can only dream of something like this. I live on a farm without three phase, it's very limiting...

  13. #12
    Join Date
    May 2013
    Location
    Auckland, New Zealand
    Posts
    997

    Default

    Quote Originally Posted by asheddie View Post
    amazing set up, I can only dream of something like this. I live on a farm without three phase, it's very limiting...
    Thanks, I only wish I had more time to play in my workshop! it took sometime to build of course.... a workshop without 3 phase is very limiting... but I choose to bite the bullet and have the 3 phase power installed, the total cost of the 3 phase is in excess of $10,000 but thats all good.
    SCM L'Invincibile si X, SCM L'Invincibile S7, SCM TI 145EP, SCM Sandya Win 630, Masterwood OMB1V, Meber 600, Delta RJ42, Nederman S750, Chicago Pneumatics CPRS10500, Ceccato CDX12



Similar Threads

  1. Back in the workshop!
    By mn pete in forum WOODWORK - GENERAL
    Replies: 6
    Last Post: 15th May 2011, 06:17 AM
  2. Back In The Workshop
    By Stubchain in forum WOODWORK - GENERAL
    Replies: 9
    Last Post: 19th August 2010, 08:21 PM
  3. Back in action (pun intended)!
    By Driver in forum HAVE YOUR SAY
    Replies: 11
    Last Post: 25th September 2005, 10:01 PM
  4. Back in the workshop
    By jow104 in forum WOODWORK - GENERAL
    Replies: 6
    Last Post: 15th March 2005, 10:40 PM
  5. Back in the workshop after 5 weeks.
    By Robert WA in forum HAND TOOLS - POWERED
    Replies: 3
    Last Post: 20th March 2003, 10:32 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •