197 Sail Management Cleat Install Cont…
Finally varnish work on the Coach Roof Trim was completed! (did the Transom at the same time).
Just a heads up – I decided to use the CAGroup Oneonone, heavy duty double sided sealing tape in lieu of other sealants to attach the fittings. See the blurb below.
"Oneonone is a high water-resistant butyl rubber sealant with a siliconised kraft paper release liner. The adhesive conforms to rough, textured surfaces and has a wide range of applications for joining, sealing, waterproofing and vibration absorption."
I’d have to say it was fairly easy to use once you get used to it. Clean-up was easier than the Sika 209 stuff I’m used to! Its makeup as a double side product negated the use of washers or similar under the fitting. Anyway, we’ll see how it goes.
P1010832-1.JPG P1010833-1.JPG
P1010834-1.JPG P1010835-1.JPGLaurie - away from the sea
-
21st May 2019 07:39 PM # ADSGoogle Adsense Advertisement
- Join Date
- Always
- Location
- Advertising world
- Age
- 2010
- Posts
- Many
-
21st May 2019, 09:40 PM #437
Be careful posting those photos Laurie - some of us could get a tad overexcited .
It's looking stunning - keep up the good work.Cheers, Bob the labrat
Measure once and.... the phone rings!
-
21st May 2019, 09:53 PM #438Senior Member
- Join Date
- Dec 2007
- Location
- Toowoomba
- Age
- 73
- Posts
- 373
Thanks mate!!
Laurie - away from the sea
-
22nd May 2019, 03:17 PM #439Senior Member
- Join Date
- Dec 2013
- Location
- Wollongong
- Posts
- 116
I would like to go one better labr and say it's probably now too good to go into the water-it is a Museum piece!
Thanks for the 'tip on the Oneonone-I'm just about to fit up the toerails and portholes in my Folkboat and this might just be what I'm looking for Laurie.
Splendid-C.R.
-
22nd May 2019, 06:28 PM #440SENIOR MEMBER
- Join Date
- Apr 2007
- Location
- Arundel Qld 4214
- Age
- 86
- Posts
- 701
I agree with Running Water. It is too good to be even christened on the water. You should just take it to all the boat shows and receive the praise and kudos you deserve for the boat you have built/constructed.
When you purchased the paulownia timber from me in 2007 and said you intended to make progressive posts of the construction I had no idea you would be so dedicated to the concept and its construction. You deserve a lot of credit in respect of the build and helping others.
John
-
16th June 2019, 04:32 PM #441Senior Member
- Join Date
- Dec 2007
- Location
- Toowoomba
- Age
- 73
- Posts
- 373
198 Mast Cont J…
Finally got the job done…completed the 8 coats of clear on the Mast. With the further 4 coats of Weatherfast Poly Clear giving a total of 6 plus the original 2 coats of epoxy. My skill at application is still not forthcoming but it is what it is and if I’m still unhappy a year after launch I’ll do something about it!
P6110856-1.JPG P6090854-1.JPG
P6090852-1.JPG P6090853-1.JPG
Also completed the brass Mast Step after getting the bow of the boat out of the shed to fit the Mast. The Step now requires some paintwork to complete it.
P6160857-1.jpg P6160859-1.JPG
So with the Mast and Spars now clear finished I will get back to the rigging and leather work required.Laurie - away from the sea
-
19th June 2019, 08:22 PM #442Senior Member
- Join Date
- Dec 2007
- Location
- Toowoomba
- Age
- 73
- Posts
- 373
199 Fwd Deck Fittings
Thought I would install the fwd Deck Fittings and put them to bed so the following have been installed…
1. Bollard Cleat for fwd mooring and towing activities
2. Pt and Stbd Bow Fairleads
3. Pt and Stbd Double Tufnol Blocks w/- Fixed Bow, spring heightened to manage the following…
- Throat halyard (run > inner Stbd)
- Peak halyard (run > inner Pt)
- Pt and Stbd Lazyjacks (both outer sheaves)
The spring heightening of the Double Blocks allows a straight run of the Halyards aft without any further fittings on the Cabin Top (hopefully)
IMG_0639-1.JPG IMG_0641-1.JPG IMG_0640-1.JPG
Laurie - away from the sea
-
20th June 2019, 11:57 AM #443New Member
- Join Date
- Nov 2015
- Location
- California
- Posts
- 8
looks great. I decided not to put the Lazyjacks but I do need a a solution for a boom crutch. Did you started to think about it?
-
20th June 2019, 01:46 PM #444Senior Member
- Join Date
- Dec 2007
- Location
- Toowoomba
- Age
- 73
- Posts
- 373
I did a number of posts regarding a Boom Crutch although it came under the Mast Support Trailering posts commencing at post #159. Subsequently I have both the Crutch and the Lazy Jacks but no intention at this point to add a Topping Lift - we’ll see how it goes! Finishes at post #163 although still needs some padding in the arcs.
Laurie - away from the sea
-
26th June 2019, 11:40 AM #445Senior Member
- Join Date
- Dec 2007
- Location
- Toowoomba
- Age
- 73
- Posts
- 373
200 Boom and Gaff Finishing Cont 1…
Final stages of the Spars…leathering the Jaws. Not much to add other than it is a bit of a slow process to get it right. I commenced with the Gaff as it is the more problematic one. After much dithering with the fitting and cutting of the leather I finally got it glued on.
I have used 3mm unfinished cow hide and have also sanded the area where the leather was attached utilising Gorilla Wood Glue – no tacks, brads or staples at this stage, we’ll see how it goes. I will condition the leather after the glue has thoroughly dried with some old Coacholine Leather Dressing left over from my leather working days.
P6260883-1.JPG P6260881-1.JPG
P6260888-1.JPG P6260886-1.JPG P6260887-1.JPG
P6260891-1.JPG P6260890-1.JPG P6260892-1.JPGLaurie - away from the sea
-
29th June 2019, 07:20 PM #446Senior Member
- Join Date
- Dec 2007
- Location
- Toowoomba
- Age
- 73
- Posts
- 373
201 Boom and Gaff Finishing 2…
All done – Boom has now been fit, cut and glued also.
P6270893-1.JPG P6290900-1.JPG
P6290902-1.JPG P6290903-1.JPG
I have now dressed both these Spars with the dressing mentioned in previous post. All looks OK!
P6290907-1.JPG P6290906-1.JPGLaurie - away from the sea
-
30th June 2019, 12:01 PM #447New Member
- Join Date
- Nov 2015
- Location
- California
- Posts
- 8
-
30th June 2019, 10:36 PM #448Senior Member
- Join Date
- Dec 2007
- Location
- Toowoomba
- Age
- 73
- Posts
- 373
Yes, as an old leather man I was happy using the Glorilla Glue but will need to see how it survives in an aqua environment. It should be OK - it’s not as if it is in the water all the time. It passes the ANSI/HPVA Type II water resistance requirement. The dressing used should assist also. I also just happened to have it sitting on the shelf!
Laurie - away from the sea
-
1st July 2019, 11:33 AM #449Senior Member
- Join Date
- Dec 2007
- Location
- Toowoomba
- Age
- 73
- Posts
- 373
202 Main Sheet Cleat Cont…
Follow on from Post #429 - "189 Main Sheet Cleat" all done and dusted at the aft end of the CB Case.
P7010909-1.JPG P7010913-1.JPG P7010910-1.JPGLaurie - away from the sea
-
4th July 2019, 04:33 PM #450Senior Member
- Join Date
- Dec 2007
- Location
- Toowoomba
- Age
- 73
- Posts
- 373
203 Oil Floor Boards Cont 1…
So…harking back to Post #320 - “148 Oil Floor Boards Cont…” – just to complete the interior I have gone ahead and finally screwed down the permanent Floor Boards Pt and Stbd and Fwd Ctr after giving them another coat of oil. Also attached the timber Turn Buttons (not brass at this stage as originally intended) where required for the removable Floor Boards. There are 4 sets of these – P&S fwd and 2 per Board Set P&S aft (refer Post 74 for layout and 148 for the fwd ones) There are also brass Finger Latches attached where you see holes in the Floor Boards and one fwd and aft for the Grate. Refer Post #158 - “74 Floor Boards Continued….” for more info.
P7040917-1.JPG P7040920-1.JPG P7040921-1.JPG
P7040922-1.JPG P7040924-1.JPG P7040918-1.JPG
This gives us completion on the basic build requirements internally so anything further will be classified as add-ons - thinking here of ballast requirements, anchor stowage, paddles etc etc. Oh, nearly forgot – still need to attach the CB Case top after I add a couple more screws aft to reinforce it to support the Mainsheet system I’ve done.Laurie - away from the sea