Thanks Thanks:  0
Likes Likes:  0
Needs Pictures Needs Pictures:  0
Picture(s) thanks Picture(s) thanks:  0
Results 1 to 9 of 9
  1. #1
    Join Date
    Oct 2007
    Location
    Saratoga, NSW
    Posts
    116

    Default Replacing A single floor board

    Hi Everyone,

    I pulled the tiles up in the kitchen this weekend and found a couple of things that need attention before the floor can be sanded for polishing... one of which is a board that has split and has had a repair done to it by nailing a thin strip of metal over the top of it...

    I remember seeing on here a thread where someone described in detail how best to get a section of a floor board out and put a new one in, i remember you have to remove the bottom of the groove but thats about it... I've spent an hour searching and can't find the thread again... If someone happens to have a link to it, or if someone can describe the process againt hat would be greatly appreciated...

    Cheers
    Callum

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many





     
  3. #2
    Join Date
    Apr 2006
    Location
    Brookfield, Brisbane
    Posts
    5,800

    Default

    ok its fairly simlple

    to remove the old board

    1. drill a hole at either end of the damaged area.
    2. cut across the board with a jig saw or similar (make sure it is square)
    3. cut along the length of the board (to make it into 2 peices)
    4. simply lif teach pice out or push them threw underneath.
    to install the new board

    1. check the width in older houses the boards were often a diferent size used now so you might have to go to a demolisher or timber recycler to get a new board
    2. cut the board to exactly the right length.
    3. sand or file a slight tapper on either end so it will slip in easily.(they can be cut on a angle to start with
    4. remove the bottom edge of the grove side.(you can also remove the tung if you wish)
    5. place the new board on the floor next to the hole.
    6. lift the grove side slightly and slide it into the hole.
    7. push the tung into the grove in the existing board.(this dosent matter if you removed the tung) tap with a hammer if it wont go easily
    8. once the tung is located push down on the grove side untill it is flush with the floor. (tap with hammer if necisary)

    if you dont understand any of these steps then please let me know n i will explain better.

    www.carlweiss.com.au
    Mobile Sawmilling & Logging Service
    8" & 10" Lucas Mills, bobcat, 4wd tractor, 12 ton dozer, stihl saws.

  4. #3
    Join Date
    Oct 2007
    Location
    Saratoga, NSW
    Posts
    116

    Default

    Cheers, that all sounds pretty straight forward, much appreciated

  5. #4
    Join Date
    Apr 2006
    Location
    Brookfield, Brisbane
    Posts
    5,800

    Default

    no probs.
    it is realy easy

    just make sure you make it the right length and dont split the grove on the other board.

    www.carlweiss.com.au
    Mobile Sawmilling & Logging Service
    8" & 10" Lucas Mills, bobcat, 4wd tractor, 12 ton dozer, stihl saws.

  6. #5
    Join Date
    May 2004
    Location
    Melbourne, Australia
    Posts
    523

    Default

    weisyboy has explained it quite well but don't forget the cleats. It is usual to cut the faulty board off flush with the floor joist at each end and nails cleats to the floor joists to support the ends of the replacement board.

  7. #6
    Join Date
    Dec 2003
    Location
    Frankston-Langwarrin VIC
    Age
    61
    Posts
    477

    Default

    This might help in some way.

  8. #7
    Join Date
    Apr 2006
    Location
    Brookfield, Brisbane
    Posts
    5,800

    Default

    i forgot to mention that.

    it is best to cut of each board flush with the joists and chisel so that a little bit away so the end sits on the joist

    www.carlweiss.com.au
    Mobile Sawmilling & Logging Service
    8" & 10" Lucas Mills, bobcat, 4wd tractor, 12 ton dozer, stihl saws.

  9. #8
    Join Date
    Oct 2007
    Location
    Saratoga, NSW
    Posts
    116

    Default

    Thanks for the pics Dusty and the other tips, I'll give it a go at lunch time today... will post a pic of my disaster once im done... hehe

  10. #9
    Join Date
    Oct 2007
    Location
    Saratoga, NSW
    Posts
    116

    Default

    Jobs done... spot the replaced board... thanks for all your help, those pics were particulary good thanks Dusty...

    Its a bit creaky so i might beef up the supports by the 2 end joists, the board is only just on them because of where the nails were... Also the top of the groove on the black board on the bottom side of the replace ment cracked and came away, annoying but not the end of the world the floor is old-ish cypress and as I am preparing the floor i can already see its going to need a bit of filler....

    Man that black tar stuff stunk when using the circular saw, had to put a mask on...

    Thanks again

Similar Threads

  1. Single Handed Sandwich Maker Board & cutlery
    By crocky in forum WOODWORKERS WITH DISABILITIES
    Replies: 28
    Last Post: 30th July 2008, 07:34 PM
  2. replacing three phase motor with single phase
    By rev in forum HAND TOOLS - POWERED
    Replies: 18
    Last Post: 16th December 2007, 04:32 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •