Thanks Thanks:  0
Likes Likes:  0
Needs Pictures Needs Pictures:  0
Picture(s) thanks Picture(s) thanks:  0
Results 1 to 4 of 4
  1. #1
    Join Date
    Mar 2008
    Location
    Byron Bay
    Posts
    56

    Default Patching villaboard after window removed

    I have had a 600h x 1200 w window removed from my bathroom.

    I am planning to patch the stud wall inside, by putting in a section of villaboard, then trying to make the joins invisible.

    All I know is to attach the new stud material as accurately as possible to the existing, so the new board buts up neatly against the old.

    Any tips greatly appreciated.

    Cheers

    Mark

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many





     
  3. #2
    Join Date
    Apr 2008
    Location
    Adelaide
    Posts
    6

    Default

    Tapering the edges of the board will help when you start flushing the joins
    some guys use a grinder but very dusty and not really recommended
    a good file or rasp should do the the job for the size you want.
    tape your join and fill
    2nd coat flushing compund is available at hardware shops and a trowel will complete the job

  4. #3
    Join Date
    Jul 2006
    Location
    Melbourne
    Posts
    709

    Default

    To hide the join you will have to fully trowel the area in the same manner as I trowel the patch in this video except your area is bigger. [ame="http://www.youtube.com/watch?v=pedAiIzFZhM"]YouTube - Repair a hole in plasterboard or drywall ceiling part one[/ame] (see all 3 parts)
    [ame="http://www.youtube.com/watch?v=3w2ac118Fho"]YouTube - Repair a hole in plasterboard or drywall ceiling part two[/ame]
    Last part
    [ame="http://www.youtube.com/watch?v=ZZW64rfhNQM"]YouTube - Repair a hole in a drywall or plasterboard ceiling part 3[/ame]
    The main problem with finishing off this type of patch is a hollow between the 2 joins that stands out when painted. This is inevitable regardless how you prep the join to be filled it is just the nature of taping the join and filling over the tape.

    The best way to fill this up correctly is to fill the center between the 2 joins and use a 4ft spririt level (or other straight edge) to screed the plaster off level. When it has set scrape back and coat using a cross trowel method as shown in the video.

    Cheers Rod
    Great plastering tips at
    www.how2plaster.com

  5. #4
    Join Date
    Mar 2008
    Location
    Byron Bay
    Posts
    56

    Default

    Thanks everybody,

    I will follow all advice

    Cheers

    P.S. Is it my imagination, or is the currently available Villaboard thinner than what is in my 15 y.o. house?

Similar Threads

  1. Cost of having a tree removed.
    By BobR in forum NOTHING AT ALL TO DO WITH WOODWORK
    Replies: 8
    Last Post: 12th May 2007, 11:04 AM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •