Thanks Thanks:  0
Likes Likes:  0
Needs Pictures Needs Pictures:  0
Picture(s) thanks Picture(s) thanks:  0
Results 1 to 4 of 4
  1. #1
    Join Date
    Jan 2007
    Location
    Sydney
    Posts
    76

    Default Complete Bathroom in a Day

    Hi Guys!
    I just found this place, looks like there is some great info and advice here.
    I thought I would add my bit.
    i guess I should preface my remarks by saying, "I have nothing to do with this company, just a happy customer".

    How many of you, as we did 15 years ago, have bought a rundown place and the good lady has prioritised that a new, (or in our case a working) bathroom is top of the list.

    This product fitted the bill so well.
    The entire bathroom arrives on the back of truck- and I do mean entire.
    All the plumbing is done, so you have just 1 cold, 1 hot and 1 waste pipe to connect.
    The pan & cistern, shower recess and basin are in situ, as are all the taps and shower head, toilet roll holder, toothbrush holder, towel rails, GPO etc etc.
    All the wiring is done, light, exhaust fan and GPO.

    The plumber the day before, set the waste pipe in the floor and ran a H & C line to where they would be needed to attach to new bathroom.

    Because in our situation the bathroom was being located at the back of the house and a new exterior wall being constructed the bathroom did not need to be broken down into its 3 sections. (Broken down, it will fit through standard door openiings.)
    We just manually lifted the entire unit off the truck, carried it to its new position and lowered it in place lining up the waste.
    Plumber screwed waste to sewer line that he had run the day before,then hooked up H & C lines and he was on his way.
    Sparkie connected one set of cables and he was finished too.

    We have been using this for 15 years and apart from the usual replacing of washes etc not one problem.
    The 'Significant Other Half' reckons it is the easiest bathroom ever to clean being all fibreglass gelcoat (yes including the walls, floor & ceiling.
    No crevices, grout or hidden hard corners to try and clean.
    Only the silicon that fills the three section joins has disoloured (gee after 15 years why does that not surprise me).

    The outside of the unit is timber battened so I just nailed the vertical v-groove timber straight on to it.

    It's a long time ago but from what i remember costing was cheaper than building a 'normal' bathroom but the HUGE advantage was 1 day all done

    Wow this a long first post, I guess you can tell i am impressed with this product. As we are about to do a new reno on this place and change layout around, we are going to go with the product again.

    Anyway this is their website (that hasnt been updated since we found it 15 yrs ago ) if you want to see the product.
    If anyone is genuinely interested, I still have 'somewhere' photos of our install.
    www.pubaustralia.com.au

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many





     
  3. #2
    Join Date
    Jul 2006
    Location
    Canberra
    Age
    54
    Posts
    914

    Default

    The plumber the day before,

    Plumber screwed waste to sewer line that he had run the day before,then hooked up H & C lines and he was on his way.
    www.pubaustralia.com.au[/quote]


    So i guess it really is not done in one day?! But it is still a quick make over.

    Pete
    If you are never in over your head how do you know how tall you are?

  4. #3
    Join Date
    Aug 2006
    Location
    Sydney
    Age
    64
    Posts
    2,378

    Default

    It looks a bit like a larger version of a bathroom on a plane. Does the toilet go make that horrible Sswooosh sound when you flush it?

  5. #4
    Join Date
    Dec 2004
    Location
    Toowoomba Q 4350
    Posts
    9,217

    Default

    This looks familiar .... Oh yes Rocker's GTG, it looks similar to the bathroom Rocker was installing in his Shed.

Similar Threads

  1. Lee Valley Superfast Service
    By Buzzer in forum Links to: TOOLS & MACHINERY
    Replies: 8
    Last Post: 9th July 2006, 06:15 AM
  2. No Petrol Day
    By Gazza in forum NOTHING AT ALL TO DO WITH WOODWORK
    Replies: 4
    Last Post: 14th September 2005, 07:26 PM
  3. Shopping Kimberley Style
    By Jenny Brandis in forum WOODTURNING - GENERAL
    Replies: 10
    Last Post: 13th July 2005, 03:52 PM
  4. OK I'll go second...
    By Zed in forum Hatches, Matches & Dispatches. Birthday greetings and other Touchie-feelie stuff.
    Replies: 31
    Last Post: 1st May 2005, 07:20 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •