    Just looking for advice. What timber should I use to rebuild and external door frame. To clarify, it's currently a 2170 door height and all I believe I have to do is lower the header, though I'm not sure if this treated pine 2×4 would be sufficient?

    Second question; the kitchen is tiny, I drew up plans for a larger kitchen by means of bricking up part of a large window (which only looks out onto someones (messy) house) which is pretty useless, especially as a western facing window. 🤒
    My question is, would it be more logical to brick up first, purchase new window to suit then fix up inside, or I could go ahead and do the inside, build the kitchen and then brick up the outside?

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Age
    2010
    Posts
    Many





     
  3. #2
    Join Date
    May 2012
    Location
    Woodstock (Cowra)
    Age
    74
    Posts
    3,372

    Default

    A couple of photos please and a sketch plan before and after
    The person who never made a mistake never made anything

    Cheers
    Ray

  4. #3
    Join Date
    Jul 2005
    Location
    Oberon, NSW
    Age
    63
    Posts
    13,354

    Default

    Quote Originally Posted by Carl91 View Post
    Just looking for advice. What timber should I use to rebuild and external door frame. To clarify, it's currently a 2170 door height and all I believe I have to do is lower the header, though I'm not sure if this treated pine 2×4 would be sufficient?
    You're sure it's a header and not a lintel? I ask 'cos you mention bricks in the 2nd question.

    My question is, would it be more logical to brick up first, purchase new window to suit then fix up inside, or I could go ahead and do the inside, build the kitchen and then brick up the outside?
    I'd do the external work first. It'd be a shame to refit your kitchen then discover something needs to be removed for access to the frame or whatever.
    I may be weird, but I'm saving up to become eccentric.

    - Andy Mc

  5. #4
    Join Date
    Dec 2016
    Location
    Penrith
    Age
    32
    Posts
    5

    Default

    https://s11.postimg.org/fp4hdyflv/20161205_160054.jpg

    https://s16.postimg.org/i2czroy3p/20161205_160125.jpg

    Thanks guys for the reply.
    I haven't done a sketch for the brickwork, only for the kitchen layout, handed it direct to a kitchen mob who done a much better drawing on the pc.

    My limited experience tells me it's a header. 🤐
    I don't know if it's a good idea or not, but to bring the door frame down to standard height after pulling off the old door jambs, I'd thought about mortising between the existing vertical studs, adding my horizontal header piece making nice and level and some cripple studs between. Even though the gap may be only 100 mm or so. 😅
    Last edited by Carl91; 5th December 2016 at 04:21 PM. Reason: Text wasn't showing on my phone when I was typing

  6. #5
    Join Date
    Jul 2005
    Location
    Oberon, NSW
    Age
    63
    Posts
    13,354

    Default

    Quote Originally Posted by Carl91 View Post
    I don't know if it's a good idea or not, but to bring the door frame down to standard height after pulling off the old door jambs, I'd thought about mortising between the existing vertical studs, adding my horizontal header piece making nice and level and some cripple studs between. Even though the gap may be only 100 mm or so. 😅
    That should work just fine.

    You don't need to mortise in deeply, just enough to position the header; many modern builders wouldn't bother and would just sister in a short length at the top of each stud instead. (Personally, I'm not a fan of that idea but I over-engineer 'most everything. )
    I may be weird, but I'm saving up to become eccentric.

    - Andy Mc

  7. #6
    Join Date
    Dec 2016
    Location
    Penrith
    Age
    32
    Posts
    5

    Default

    Thankyou! I may be just a mechanic but sometimes correct. My mortice plan would directly relate to the vertical stud thickness, i.e probably 1/4 of the thickness. I pulled back the architrave to have a look this morning, looks like the jamb is just nailed on with no packing timber. Hmmm.
    It's a damn shame rough opening in 1600, with that figure and the jamb thickness I need to cut my (free) beautiful doors back a bit.
    Anythings better than what's there but. 😄
    Thanks again for the help and advice. I reckon my questions are covered and I hope to post some decents results.

Similar Threads

  1. DC Tig questions
    By steamjunkprops in forum WELDING
    Replies: 5
    Last Post: 14th November 2013, 05:49 PM
  2. 2 questions
    By Rum Pig in forum WOODTURNING - PEN TURNING
    Replies: 9
    Last Post: 27th January 2009, 01:57 PM
  3. Questions
    By achille in forum WOODWORK - GENERAL
    Replies: 2
    Last Post: 1st November 2007, 10:18 PM
  4. questions
    By Clinton1 in forum BOAT DESIGNS / PLANS
    Replies: 60
    Last Post: 3rd June 2007, 11:50 AM
  5. Questions
    By KangaMan in forum WOODTURNING - PEN TURNING
    Replies: 10
    Last Post: 13th September 2006, 11:33 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •