Thanks Thanks:  0
Likes Likes:  0
Needs Pictures Needs Pictures:  0
Picture(s) thanks Picture(s) thanks:  0
Page 2 of 2 FirstFirst 12
Results 16 to 22 of 22
  1. #16
    Join Date
    Apr 2005
    Location
    Sydney
    Posts
    41

    Default

    Thanks again guys,

    Squizzy, I don't think the calculations work out just based on volume of concrete used. A big flat slab will cost more than a small deep slab of same volume wont it?

    I know it does seem a little high.
    I was hoping to get it arounfd the 6ish mark.


    Thanks

    Adrian

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many





     
  3. #17
    Join Date
    Jul 2000
    Location
    Drop Bear Capital of Gippsland (Lang Lang) Vic Australia
    Age
    74
    Posts
    6,518

    Default

    Go for a drive around a new housing estate and ask the concreters how much for a cash in hand for a weekend, offer a BBQ and a slab too.
    Guarantee you will get a result.
    Stupidity kills. Absolute stupidity kills absolutely.

  4. #18
    Join Date
    Mar 2005
    Location
    Too close to Sydney
    Posts
    1,385

    Default

    Adrian,

    My old mans a concretor. If you want give me a call on my mobile which I will PM you. It will be a reasonable amount and done properly by a licenced tradesman.

  5. #19
    Join Date
    Sep 2005
    Location
    campbelltown NSW
    Age
    67
    Posts
    623

    Default

    Quote Originally Posted by vsquizz
    5 x 6 x 0.2 = 6m3

    6 x 12 x 0.1 = 7.2m3

    $8,500.00 cash is very high....(just trying to give a general tip here)
    Maybe I should have mentioned that it was a "cashie" by a tradesman, supplied cold/hot drinks and I didn't mention another slab for my boat, so I appologise for the misleading information in my previous post.
    savage(Eric)
    savage(Eric)

    Never, under any circumstances, take a sleeping pill and a laxative on the same night.

  6. #20
    Join Date
    Mar 2008
    Location
    Victoria
    Posts
    1

    Default

    I have just put in a slab 10m x 8.6m x 100mm (86 sq metres) at a cost of:
    9.44metres 25 mpa concrete delivered 40km return trip x 2 loads $1450 cash, 6 - 6m x 2.4m m-62 reinforcing mesh delivered 40km return trip $240 cash, 6 tonne of grade 3 crushed rock delivered 20km return $130 cash, 3 men over 2 days to box for slab, fill low spots with crushed rock, lay mesh and lay concrete (13 hrs) over 2 days, 80km return travel, $1200 cash. A total of $3020, completed by tradesmen start to finish.
    I would recomend that you get quotes from as many tradesmen as possible.
    Regards
    "benjamin89"
    Last edited by benjamin89; 10th March 2008 at 08:59 PM. Reason: spelling errors

  7. #21
    Join Date
    Aug 2006
    Location
    Melbourne
    Posts
    400

    Default

    Hi could I get the link to the thread "boxing in my slab" as I cant seem to find it.

    Thanks

  8. #22
    Join Date
    Dec 2004
    Location
    Northen Rivers NSW
    Age
    57
    Posts
    2,837

    Default

    Quote Originally Posted by boban View Post
    Adrian,

    My old mans a concretor. If you want give me a call on my mobile which I will PM you. It will be a reasonable amount and done properly by a licenced tradesman.
    And judging by your avitar he would have been born with a trowel in his hand


Page 2 of 2 FirstFirst 12

Similar Threads

  1. Layout Optimization and Cost Estimating Software
    By Roberto Perez F in forum HINTS & TIPS
    Replies: 1
    Last Post: 22nd December 2006, 06:41 AM
  2. Cupped Redgum Slab
    By Suresh in forum WOODWORK - GENERAL
    Replies: 4
    Last Post: 24th January 2004, 11:09 PM
  3. COST OF RAISING KIDS US$
    By ken yates in forum WOODIES JOKES
    Replies: 0
    Last Post: 7th February 2002, 07:36 AM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •