Thanks Thanks:  0
Likes Likes:  0
Needs Pictures Needs Pictures:  0
Picture(s) thanks Picture(s) thanks:  0
Results 1 to 12 of 12
  1. #1
    Join Date
    Jul 2004
    Location
    Chemside, Brisbane
    Posts
    68

    Default How to calculate the number of bags of premix concrete

    Please help! I am frustrated in not being able to calculate a simple task!

    I am erecting a new deck and am using "High wind post anchors" (Pryda).

    The 9 post holes are to be 300 round and 650 deep - simple enough. But for the life of me I cannot work out the number of bags of General Purpose concrete for the job. Bunnings sell 20kg bags (heavy enough for an old codger like me) and my head is spinning trying to calculate cubic meters and volumes and decimal points and pi and watching cricket etc. My school boy arithmatic keeps giving me different results!:eek:

    Is there a good samaritan out there who can simplify things for me. One web site suggests 320 x 320 x 50 per bag but this only confuses me more.:confused:

    Hopefully there is someone (or web site) who knows how many 20 kg bags per hole - or am I the only one who get confused?

    Compliments of the season to you all
    Aussieglen

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many





     
  3. #2
    Join Date
    Nov 2003
    Location
    Australia and France
    Posts
    8,175

    Default

    I think the fine print on the bag reads "10 kg of this product spreads to 320 x 320 (0.10 square metres) to a depth of 50mm."

    I'd be guessing therefore that you could get a 20kg bag to stretch to 320 x 320 x 100mm deep, which means .10 sq metres x .1m = .01 cubic metres.
    Your holes are 300 diameter, or .07 square metres by .65 m deep which is near as anything to .045 of a cubic metre, or nearly FIVE bags per hole.

    You have nine of them, so I reckon it'd be a LOT cheaper and easier to get a minimix truck in with .42 metres (42 bags), and you'll know that the brew is going to be of consistent strength at the end of the day.

    Don't load your barrow too much,and it'll be Lot less work than mixing anyway!

    Cheers,
    \
    P (who failed maths at school so be careful!)


  4. #3
    Join Date
    Oct 2003
    Location
    Gold Coast
    Posts
    302

    Default

    I'm not to sure about the figure you got from the Web either

    if a 20kg bag has a volume of 320x320x50 when mixed, then each bag produces a volume of 0.00512m3

    If you have 9 holes of 300 diameter and 650 depth, then the volume of concrete required is:

    9 x height x pi x radius squared = 9 x 0.65m x 3.14 x 0.15m x 0.15m

    = 0.41 m3 of concrete

    Now, to calculate the number of bags

    0.41m3 / 0.00512m3 per bag = 81 bags or 9 bags per hole

    In my mind's eye, I can't see 9 x 20 kg bags plus water fitting in the size holes you describe. 5 bags per hole sounds much closer to the mark
    "If something is really worth doing, it is worth doing badly." - GK Chesterton

  5. #4
    Join Date
    Jul 2000
    Location
    Drop Bear Capital of Gippsland (Lang Lang) Vic Australia
    Age
    74
    Posts
    6,518

    Default

    Like the Midge said, get a truck in, better quality and a fraction of the price, get a few mates with barrows to help, only take about half an hour and buy a slab with the savings.
    Your mates will love you for it.
    Send me the funds for a return airfare and I will come too
    Stupidity kills. Absolute stupidity kills absolutely.

  6. #5
    Join Date
    Nov 2003
    Location
    Australia and France
    Posts
    8,175

    Default

    Quote Originally Posted by Dion N
    if a 20kg bag has a volume of 320x320x50 when mixed, then each bag produces a volume of 0.00512m3
    snip....s or 9 bags per hole
    Dion,
    I may be wrong, but I my memory says that for some confusing reason, TEN (10) kg has a volume of .005.

    There's a strange anomoly in that the stuff comes in 20kg's but the description is for half that.

    But I'd be happy to be corrected!

    I've just confirmed the following fromhttp://www.riversands.com.au/easymix_concrete.htm
    1 x 20 kg bag = 0.01m3 100 bags = 1.0m3
    So I'm happy that my sums are correct!

    cheers,

    P

  7. #6
    Join Date
    Nov 2005
    Location
    Brisbane
    Posts
    26

    Default

    Red Alert.

    Dont buy premix in bags. It will cost a fortune, and its &&&&&....really boney mix!

    You need about half a cube for your job. If you have a trailer, then go to your local landscaping supplies and get half a cube of premix (sand/gravel) and a couple of bags of cement.

    ......Otherwise order in a truck. But they usually have a minimum order and you only need half a cube for your job, which is stuff all.

  8. #7
    Join Date
    Jul 2004
    Location
    Chemside, Brisbane
    Posts
    68

    Default

    Thanks to all you good guys - you have been a life saver. I now have the comments and calculations to mull over and make the big decision - whether to use 41 bags = $245 and do the job bag by bag or get a load of sand gravel delivered and hire a mixer or to check out the Minimix ready mixed to specification. My access to the site is a drawback and would require barrowing in a fair way (50 meters) as would the sand/ gravel mix from where dumped, plus mixing.

    One comment regarding the quality of the premix in bags is of concern - can you confirm this or is this your own assessment?. The posts are load bearing (albeit only a deck) but I dont want the thing to disappear down the hole one Sunday afternoon in a rainstorm for want of a few bob extra for a quality product. Perhaps you may care to expound on the quality aspect of these bagged products.

    Meantime I am encouraged to start setting out the profiles and make a start on the holes before the weather gets hot!

    Aussieglen

  9. #8
    Join Date
    Jun 2005
    Location
    Melbourne
    Age
    51
    Posts
    135

    Default

    For my personal choice, I only mix my own concrete when strength is not of concern (ie filling blocks or where there is so much reo in it doesn't matter), and where the time taken to mix will be negligible. Even barrowing in 50m sounds preferable than mixing to me.
    Cheers
    Justine

  10. #9
    Join Date
    Nov 2003
    Location
    Australia and France
    Posts
    8,175

    Default

    Quote Originally Posted by aussieglen
    One comment regarding the quality of the premix in bags is of concern - can you confirm this or is this your own assessment?. The posts are load bearing (albeit only a deck) but I dont want the thing to disappear down the hole one Sunday afternoon in a rainstorm for want of a few bob extra for a quality product. Perhaps you may care to expound on the quality aspect of these bagged products.
    The stuff is of consistent when it's in the bag, it's lack of proper mixing, inconsistent water quantity, and inconsistency of placing (ie one bag at a time, hot weather, concrete being put into footings in four lots of different strengths, that cause quality concerns.

    Despite all of the above, in reality, footing materials only need to be stronger than the soil they are in!

    I don't think it'll be extra to get a mini mix truck in though!

    Cheers,

    P

  11. #10
    Join Date
    Aug 2004
    Location
    Brisbane
    Posts
    89

    Default

    You should be able to get .5m3 delived . Try Concrete Taxi (www.concretetaxi.com) - they specialise in small loads and are in Brisbane. Alternatively, you could buy a GMC mixer from Bunnings for $289, plus cement, gravel and sand (say $60), and while it will cost you a bit more you will have a cement mixer at the end of it (even if it is only a GMC one).
    Last edited by RETIRED; 15th June 2013 at 11:57 PM.

  12. #11
    Join Date
    Mar 2002
    Location
    Sydney, NSW
    Posts
    302

    Default

    I agree with the previous post about the strength of the concrete is not really a major issue for posts in the ground, within reason.

    Hopefully its not a really clayey soil.

    If you go with the concrete bags, you still have to transport those to the site 50m.

    Do you intend to mix the concrete or just place it dry? If mixing a mixer is a must in my mind.

    In my mind I would lean on a few mates and go with the mini-mixer delivered.

    Far quicker and easier, my next choice would be to go with mixing my own batch.

    I would not have an issue with the quality in using the concrete bags, just do not over water.

    And the 0.01 cubic metres per bag sounds right to me.

    And the amount of concrete needed to fill the hole is correct; however how big are the posts for they will take up space in the hole, therefore less concrete would be required.

    But always order more concrete if going with mini-mixer delivered option, have some other areas boxed up to take any extra concrete. 0.5m cubic metre is more than enough given the measurements are right.


    Good Luck


    Pulpo

  13. #12
    Join Date
    Jul 2000
    Location
    Drop Bear Capital of Gippsland (Lang Lang) Vic Australia
    Age
    74
    Posts
    6,518

    Default

    Another point I discovered recently, don't use quickset in a mixer, it just goes lumpy and won't mix properly, and it costs more for the honour.
    Stupidity kills. Absolute stupidity kills absolutely.

Similar Threads

  1. Why men oversleep
    By Mal in forum WOODIES JOKES
    Replies: 9
    Last Post: 9th March 2007, 11:55 AM
  2. Concrete over concrete
    By Sir Stinkalot in forum CONCRETING
    Replies: 4
    Last Post: 18th July 2003, 10:59 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •