Mowy
10th August 2004, 06:31 PM
Hi All,
I usually do my tenons using workcentre and bevel ripping guide set at 90deg.
This was all good and well as most of my tenon pieces have been less than 1.5m in length. Now I need a 50mm tenon on a 2m piece and I dont think this method will be very stable. What do you recommend? Should I use the router table and make several passes?
thanks!
I usually do my tenons using workcentre and bevel ripping guide set at 90deg.
This was all good and well as most of my tenon pieces have been less than 1.5m in length. Now I need a 50mm tenon on a 2m piece and I dont think this method will be very stable. What do you recommend? Should I use the router table and make several passes?
thanks!