d.m.s
1st March 2010, 09:32 PM
$100
2 days
2.4 m long
16mm mdf
some 35mm edge strips
1/2" threaded bar
3/8" threaded bar
the longest part of doing this was looking for my 1/2" speedbit cause the other bit had a shank too big to fit in the cordless
unless you count the drying stage but that was left overnight.
at the back there's another 1/2" bar in the middle too.
http://img697.imageshack.us/img697/4088/s6301730.jpg
What they sell in stores these days as entertainment units is rubbish.
2 days
2.4 m long
16mm mdf
some 35mm edge strips
1/2" threaded bar
3/8" threaded bar
the longest part of doing this was looking for my 1/2" speedbit cause the other bit had a shank too big to fit in the cordless
unless you count the drying stage but that was left overnight.
at the back there's another 1/2" bar in the middle too.
http://img697.imageshack.us/img697/4088/s6301730.jpg
What they sell in stores these days as entertainment units is rubbish.