Newbie here. done lots of reading but need advice from those in the know.
Building a new house as first time ob and just told by truss supplier my exposed truss tails will be supplied as stick timber not spliced to top chord so I have to sister them in on site - all 192 of them!
Was going exposed hardwood tails but wife now wants painted tails - hamptons look. My only option in DPR profile is to use a pre-primed h3 pine in a 90x42 and fix 1.8m lengths alongside the 90x35 mgp10 top chord with batten screws to give me a 600 tail.
The layout was also wrong as I need symmetrical trusses given the tails will be exposed and the truss supplier had different centres. Ideally the centres should be the same - 600 or thereabouts.
My question is does anyone have experience doing this? Is the labour going to kill the budget?
I was thinking I could pre order the 90x42 cut to 1.8 and do plumb cut ready for facia then pre-paint. I'd get the carpenters to set one each end- run a string line then fix each tail flush to that. My truss supplier would need to move first truss 42mm to accomodate sistered tail but not sure if the corners (creepers?) would give me tails over corners.
Am I heading for a budget and logistical nightmare?
Thanks
Stephen
Sent from my iPad using Tapatalk
Building a new house as first time ob and just told by truss supplier my exposed truss tails will be supplied as stick timber not spliced to top chord so I have to sister them in on site - all 192 of them!
Was going exposed hardwood tails but wife now wants painted tails - hamptons look. My only option in DPR profile is to use a pre-primed h3 pine in a 90x42 and fix 1.8m lengths alongside the 90x35 mgp10 top chord with batten screws to give me a 600 tail.
The layout was also wrong as I need symmetrical trusses given the tails will be exposed and the truss supplier had different centres. Ideally the centres should be the same - 600 or thereabouts.
My question is does anyone have experience doing this? Is the labour going to kill the budget?
I was thinking I could pre order the 90x42 cut to 1.8 and do plumb cut ready for facia then pre-paint. I'd get the carpenters to set one each end- run a string line then fix each tail flush to that. My truss supplier would need to move first truss 42mm to accomodate sistered tail but not sure if the corners (creepers?) would give me tails over corners.
Am I heading for a budget and logistical nightmare?
Thanks
Stephen
Sent from my iPad using Tapatalk