Hi All
Building a low deck 46 sqm between house and pool. Using a steel sub floor as ground clearence is only 250mm,.
Can fasten bearers along side of pool thats ok - my dilemma I need to leave a 50 mm gap visual inspection for termites.
was thinking of laying steel directly on footings 500mm x 400mm 150 mm thick with reo bars tying back into the slab is this sensible or does anyone have a better solution or should the footings be thicker