Thanks Thanks:  0
Likes Likes:  0
Needs Pictures Needs Pictures:  0
Picture(s) thanks Picture(s) thanks:  0
Page 5 of 5 FirstFirst 12345
Results 61 to 63 of 63
  1. #61
    Join Date
    Dec 2005
    Location
    Canberra
    Posts
    3,260

    Default

    I could do with a few replacement edge strips (not that I actually need them yet, just to have some handy against the day that I do).

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many





     
  3. #62
    Join Date
    Nov 2007
    Location
    Victoria
    Posts
    733

    Default

    Hi Lou,

    Might be interested, I've been looking at the bridge system (B300 in Eureka-speak). Contacted Dino and he thought it would probably be around $100 to post a single bridge kit to Melbourne.

    Do you use your guide rails for ripping timber or just sheet goods ? Does anyone have experience with the bridge system ? Is the loss in depth of cut because of the smartbase and rail about 30mm ?

    Just checked the new website and the bridge appears to have disappeared....

    Sam

  4. #63
    Join Date
    Aug 2004
    Location
    Lost in Space
    Age
    53
    Posts
    2,406

    Default

    Thx for the replies fellas will see if we get a few more nibbles before we start organizing!

    Regards Lou
    Just Do The Best You Can With What You HAve At The Time

Page 5 of 5 FirstFirst 12345

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •