Thanks: 0
Likes: 0
Needs Pictures: 0
Picture(s) thanks: 0
Results 1 to 3 of 3
Thread: timber milling
-
10th March 2009, 07:46 PM #1Member
- Join Date
- Nov 2003
- Location
- wagga wagga
- Age
- 49
- Posts
- 95
timber milling
just wondering how many cube people get out each day
what sort of mill
in what sort of sizes
what sort of equipment
im talking about trees already barked in log dump or within 50m of mill
mill already set up
logs 40cm to 70cm diameter 3m to 5m long 7 out of 10 with little defect
this is what i get with a 827 lucas and old loader with breaks sometimes
4x1 1.1 to 1.3 cube per 8 hrs 2 blokes 1 driving 1 tailing out
6x1 1.8 to 2.2 cube " "
8x2 2.3 to 3 cube " "
slabing with dedicated 6ft slabber with 20hp motor 5 skip chain 6 chains then sharpen large logs 150cm to 310cm 3m to 6m long loader/tractor to roll and take away slabs logs mill ready to go except when needing to roll several setups
3.5 to 4.8 cube per 8 hrs 2 blokes
these are average figures with .2 to.3 cube of assorted tailing each day
-
10th March 2009 07:46 PM # ADSGoogle Adsense Advertisement
- Join Date
- Always
- Location
- Advertising world
- Age
- 2010
- Posts
- Many
-
10th March 2009, 09:15 PM #2.
- Join Date
- Feb 2006
- Location
- Perth
- Posts
- 27,794
I'm not into sheer production - just accessing timber that is hard to buy or would otherwise be chipped or tuned into firewood.
I'm milling mainly 500 to 1200 mm wide x 2 to 4 m long using my BIL mill (see link below).
I find the hardness of the wood is the dominant factor in determining how much I cut.
If I can slab and stack 1.5 - 2 cube in a day by myself (I nearly always work by myself although I can use a forklift in the yard) in 8 hours I reckon that's enough and it's time for a beer. I'm not interested in wrecking myself in the process since it is of course for me just a hobby.
-
10th March 2009, 09:26 PM #3
i run a lucas 8/25 and production depends on timber and location.
on my own loadign by hand with a cant hook cutting hardwood logs around 500mm i average about 3.5 cube in a day if all the logs are lined up and docked up.
with me and my tailor we have done 10 cube of pine in a day. logs were big 900mm and we had a loader to roll the logs in.
all that is cutting 100 x 50 6m lenghts.
www.carlweiss.com.au
Mobile Sawmilling & Logging Service
8" & 10" Lucas Mills, bobcat, 4wd tractor, 12 ton dozer, stihl saws.
Similar Threads
-
Timber milling in Perth?
By Knight_of_Ni in forum SMALL TIMBER MILLINGReplies: 18Last Post: 23rd March 2016, 02:09 PM -
timber properteys during milling.
By weisyboy in forum SMALL TIMBER MILLINGReplies: 55Last Post: 27th December 2008, 08:07 AM -
milling timber near Epping, Sydney
By mick59wests in forum SMALL TIMBER MILLINGReplies: 3Last Post: 19th June 2007, 06:30 PM -
milling timber
By whiskers in forum TIMBERReplies: 3Last Post: 15th March 2004, 11:15 PM