    Hi there everyone,
    I'm in the middle of going through the processes to buy a rosewood log milled into slabs from the US and am now dealing with the fun of customs and fumigation research.
    I've been told that the only approved process for the timber (as it still has traces of bark on it) would be ethylene oxide fumigation at 1200g/m3 for 5 hours at 50 deg C.
    I'm a tad concerned that this temperature may cause cracks and checking, and was wondering what other people on here thought?

    Damien

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many





     
  3. #2
    Join Date
    Nov 2006
    Location
    Rockhampton
    Age
    63
    Posts
    2,236

    Default

    Is the log still green? If it is and being a log it will most likely have a high MC, I think it's a fair question to ask, I don't know specifically whether it will be harmful or not, I had some dry stuff fumigated from NZ with no issues thus far, perhaps you can ask the fumigators more about the process.
    Outline your concerns, they probably won't be able to be specific re potential timber damage but they should know whether the process has a low or high moisture content, the gas might be hygroscopic (likes water) which at a guess would be better than if it repelled water.



    Pete

  4. #3
    Join Date
    Jan 2013
    Location
    the sawdust factory, FNQ
    Posts
    1,051

    Default

    ETHYLENE OXIDES ARE APPLIED UNDER VACUUM NOT HEAT. Whoever told you otherwise doesn't know what they're talking about.

    Methyl Bromides are used to fumigate in container and AQIS sets a mimimum loading of fumigant per container volume. It's the easiest most commonly used method for green timber treatment.

    Sulphuryl flouride loadings are set based on ambient heat... the hotter it gets the less loading you need. I suspect this is what whoever spoke to you was thinking about.


    Get them to arrange for kiln drying prior to shipment. It will need certification about MC reached, but that's not real hard for most kiln operators to supply. Once it's KD it doesn't need to be fumigated.

    (Never imported timber, but we do export it)

  5. #4
    Join Date
    Jan 2013
    Location
    the sawdust factory, FNQ
    Posts
    1,051

  6. #5
    Join Date
    Nov 2012
    Location
    Belgrave, Victoria, Australia
    Posts
    234

    Default

    Unfortunately kiln drying doesn't seem to be an approved treatment for timber that still has bark on it, and likewise methyl bromide also isn't allowed
    Its either ethylene oxide, gamma irradiation or destruction of the whole thing (at my expense).

    Thus far i'm still weighing up whether the final cost is really worth it for a burly log that needs to be slabbed up which could have internal voids or issues compared to just buying slabbed straight grained rosewood (where i can already see most major issues).

    Decisions Decisions...i've still got another 3 months or so of saving left to go before i can really make a move either way, so there's a reasonable amount of time left to make up my mind, assuming the pieces i want aren't sold in the meantime and that CITES doesnt place them on the endangered species list haha

  7. #6
    Join Date
    Apr 2005
    Location
    Nerang Queensland
    Age
    67
    Posts
    10,766

    Default

    Unfortunately it will also depend on who looks at the load in Customs. I get small bundles sent through that are kiln dried with certificates but was still forced to have one gamma treated on one occasion - $40 for $80 worth of timber .
    Neil
    ____________________________________________
    Every day presents an opportunity to learn something new

  8. #7
    Join Date
    Nov 2012
    Location
    Belgrave, Victoria, Australia
    Posts
    234

    Default

    I've decided to buy a few already slabbed up pieces, though apparently they're only partially air dried, so that could cause issues.

    I'll let you know as i go along how all of this develops.

  9. #8
    Join Date
    Dec 2007
    Location
    Melbourne
    Posts
    3,277

    Default

    Funny how it works, if you could bring it back in a suitcase, they would just look for visible crawlies, tap it on a piece of white paper and see if any fall out, then send you on your way
    …..Live a Quiet Life & Work with your Hands

Similar Threads

  1. Temperature Rising
    By wheelinround in forum NOTHING AT ALL TO DO WITH WOODWORK
    Replies: 31
    Last Post: 22nd January 2013, 07:59 AM
  2. Rising temperature
    By Allan at Wallan in forum WOODIES JOKES
    Replies: 1
    Last Post: 15th January 2013, 06:35 PM
  3. Problems with temperature
    By Allan at Wallan in forum WOODIES JOKES
    Replies: 2
    Last Post: 5th November 2008, 10:36 PM
  4. Interesting Temperature
    By rrich in forum NOTHING AT ALL TO DO WITH WOODWORK
    Replies: 32
    Last Post: 10th September 2006, 01:16 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •