Folks, I'm attempting to reline a bathroom with villaboard and sort out the waterproofing. I've read related posts in this forum and Hardie's "Wet Area Construction" manual, but I'd like to confirm a few things... 1) 75mm or 150mm flashing is attached with silicon or building adhesive to the edges of floor and vertical corner of shower before the wall linings are installed. 2) A 10mm bond-breaker bead is installed under the floor edge of the villaboard 3) The floor, lower walls and...

More...