Thanks Thanks:  0
Likes Likes:  0
Needs Pictures Needs Pictures:  0
Picture(s) thanks Picture(s) thanks:  0
Results 1 to 2 of 2
  1. #1
    Join Date
    May 2008
    Location
    BELL POST HILL, 3215
    Age
    87
    Posts
    2,332

    Default Our New Top Floor.

    Hi to you all,
    Great News Today, as all the Metal Work is to arrive on Fri.3/ 1/ 2017.
    So, it will be all hands on deck the following Wed. Thurs. Fri. as we are putting this new floor up our selves.
    Somebody must know how to do it.
    Will report a bit later.
    Regards,
    issatree.
    Have Lathe, Wood Travel.

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Age
    2010
    Posts
    Many





     
  3. #2
    Join Date
    Oct 2008
    Location
    Leopold, Victoria
    Age
    65
    Posts
    4,677

    Default

    Quote Originally Posted by issatree View Post
    Great News Today, as all the Metal Work is to arrive on Fri.3/ 1/ 2017.
    Must be finished by now, where's the photos?

Similar Threads

  1. Vents in void between ground floor ceiling and first floor floor
    By Reno RSS Feed in forum GENERAL ODDS N SODS
    Replies: 0
    Last Post: 16th July 2013, 02:30 PM
  2. recycled floor secret nail holding & floor movement
    By Reno RSS Feed in forum FLOORING
    Replies: 0
    Last Post: 5th May 2009, 12:00 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •