Originally Posted by
Ross
Concrete above ground level with a concrete spoon drain accross the back and sides below the height of the slab. A retaining wall 500mm from the slab with ag pipe drainage and ventilation.
Oh and make sure they use at least one layer of builders plastic under the concrete.