    Scally, thanks very much for a great thread and pics, and thanks for all responses.

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Age
    2010
    Posts
    Many





     
  3. #17
    Join Date
    Aug 2004
    Location
    Coffs Harbour
    Posts
    2,014

    Default Formwork

    I decided to get a concreter and builder in to help with the slabs.
    My experience is limited to much smaller jobs and I thought these foundations were too important in the hands of an amateur.

    I arranged materials, machinery and did most of the earthworks.

    They did the layout, put in the formwork, moisture barrier, reo, chairs and managed the pour.

    Trench mesh is in the bottom of the perimeter trench and the 4 pier holes for the corner posts.
    The trenches ended up much bigger than designed because of all the rain. I drained them several times as 200mm rain swamped the site. Even so the sides slumped in and the bottoms turned to slop. The slop had to be removed which meant everything was deeper.
    The concrete order is growing!!

    Setting the stirrups in place was made difficult because they had to be done before the pour. Reo bars for the base would have made the job easier than with the flat base.

    All in place. Now arrange for the council inspection.
    Scally
    __________________________________________
    The ark was built by an amateur
    the titanic was built by professionals

  4. #18
    Join Date
    Aug 2004
    Location
    Coffs Harbour
    Posts
    2,014

    Default Council Inspection surprise

    Council came out the next day.
    Everything was fine.
    There was some water in the bottom of the trenches which would need to be removed before the pour.

    However..........
    I need a surveyor's certificate to make sure the formwork is on my property and the correct distance from the boundaries.

    This was a surprise, a disappointment and a pain.

    Many frantic phone calls to get a surveyor on short notice. Eventually I found one who could do it the next day.
    $500 plus GST. Bugger.

    They arrived first thing in the morning.
    "If you want the pergola done as well, it will be another $150.00."
    What?
    I think.......if the shed slab is in the right place than the piers for the pergola will also be in the right place.
    So I go without the survey for the pergola.

    Thirty minutes later they are finished.
    Everything is fine!
    6cm to spare. Excellent.

    I really hate spending hard earned money for nothing!!

    At least I can get on with ordering the concrete, line pump and vibrator.
    Scally
    __________________________________________
    The ark was built by an amateur
    the titanic was built by professionals

  5. #19
    Join Date
    Aug 2004
    Location
    Coffs Harbour
    Posts
    2,014

    Default Camphor and Neighbours

    I had several plans for the Camphor.

    Leave it for shade and screening the back of the neighbour's house.

    Remove the top and carve the trunk into a Totem Pole.

    Cut it up and work with a mate to make African Sabar drums.

    I don't like camphour trees, dead or alive, and it was only attracting crows so I decided to remove it. A tree removal specialist wanted $1000 to cut it down and take it away and grind the stumps.

    Unfortunately we decided to do it ourselves. Our tree removal technique split most of the trunk so I couldn't use it for drum making.

    My side neighbour had very generously allowed me to use his driveway to get machinery and materials to the shed site.
    In return we cut all the timber into billets for his firewood stockpile. He was happy.

    The green waste went to a recycle place. $350 for about 2.5 tonne of camphor.
    Bugger.


    We also managed to smash the back fence when a stray camphor root, running under the fence, tore through it.
    My back neighbour was a bit disappointed!
    He tried to reassemble the mangled fence but it was a waste of time.
    I took the mangled section to a fence place down the road. That matched the "bent" section.
    $7.00. Wow. I was expecting another big hit to the wallet.
    Anyway, after a bit of messing around the hole in the back fence was replaced.

    Now both neighbours are happy.

    The truck access down the neighbour's driveway has made life much easier.
    The packing sand in the pic was dumped right beside the shed site.
    I did over order on the packing sand and seem to have been shovelling it for weeks.
    At least I didn't have to barrow it from the road and down the side of the house.
    Scally
    __________________________________________
    The ark was built by an amateur
    the titanic was built by professionals

  6. #20
    Join Date
    Nov 2007
    Location
    Albury Well Just Outside
    Posts
    13,315

    Default

    Great project and great build to watch.

  7. #21
    Join Date
    Nov 2007
    Location
    Albury Well Just Outside
    Posts
    13,315

    Default

    Quote Originally Posted by Scally View Post
    ...The Wood show is still on the list. I will probably volunteer to man the Forum spot for a while on Friday afternoon.
    That would be good as spots still available.

    Quote Originally Posted by Claw Hama View Post
    Good, we wouldn't want to miss out on your jolly company, and we wouldn't want to just get stuck with Christos's jokes
    Come on I am not that bad with the jokes.
    Your Faithfully
    Overlord


  8. #22
    Join Date
    Jun 2007
    Location
    North Of The Boarder
    Age
    68
    Posts
    16,794

    Default

    Quote Originally Posted by Christos View Post
    That would be good as spots still available.



    Come on I am not that bad with the jokes.
    Your Faithfully
    Overlord


    Say's who??

    Oh Master Overload whom worked me to the bone.

  9. #23
    Join Date
    Aug 2004
    Location
    Coffs Harbour
    Posts
    2,014

    Default Shed Pour

    Up early to make sure all is in order for pouring the shed slab.

    Pump out the free water in the pier holes and trench.

    Concreter and builder arrive at 7.30am. We confirm everything is organised and Concrete first load will be dry to go into piers and trenches.

    Pump guys arrive at 8.30am and get organised for concrete to arrive at 9.00am.

    Waiting........waiting
    9.00am comes and goes
    9.30am, still waiting............Ring concrete company......."the truck has just left".
    10.00am.......still waiting ( I am about 10 minutes from the concrete depot. lying buggers!)
    Finally they turn up a few minutes later.
    Pump fires up and slurry goes in the hopper.

    Nothing happens............
    Bugger. The hose is blocked.
    Much running and hammering the hoses...............
    Finally after 30minutes the concrete finally flows, freely............very freely.
    The mix is wet........no big drama.

    All systems go.
    concrete flows......
    Vibrator vibrates......
    Concreter screeds.......

    Looking good.
    We confirm the quantity for the second truck.

    It should arrive a few minutes after we finish the first truck.

    Pour finishes and all the piers and trenches are full.......Perfect.

    Have a stretch and get ready for the next 6 cubic metres.
    Scally
    __________________________________________
    The ark was built by an amateur
    the titanic was built by professionals

  10. #24
    Join Date
    Aug 2004
    Location
    Coffs Harbour
    Posts
    2,014

    Default Shed Pour 2

    Still waiting for the second load to arrive......

    30 minutes.........waiting



    1 hour......waiting.......

    I am beginning to lose my trust in the concrete company.....
    Scally
    __________________________________________
    The ark was built by an amateur
    the titanic was built by professionals

  11. #25
    Join Date
    Feb 2003
    Location
    back in Alberta for a while
    Age
    68
    Posts
    12,006

    Default

    Hi Scally

    how long did you have to wait?

    did you vibrate the first and second place concrete together?
    regards from Alberta, Canada

    ian

  12. #26
    Join Date
    Aug 2004
    Location
    Coffs Harbour
    Posts
    2,014

    Default Shed Pour 2 finally

    A bit over an hour wait for the second concrete truck.

    We got it on quickly as it was all flat going.

    Vibrating as we went.


    I didn't want to risk more wet weather on the pier holes that were dug for the pergola so we ordered enough concrete to fill them too.

    My concreter spent a lot of time getting the steel float finish and shaping the edges.
    It looked pretty nice to me.

    It was a long day and thanks to the delays by the concrete company and problems with the line pump, it cost me an extra $500.00.

    I am still relieved that the slab is finally down and I know it is good enough to hold up what ever I put in the shed.
    Scally
    __________________________________________
    The ark was built by an amateur
    the titanic was built by professionals

  13. #27
    Join Date
    Aug 2004
    Location
    Coffs Harbour
    Posts
    2,014

    Default Curing

    I kept the slab wet and covered it with plastic sheeting.

    The next day I removed the formwork.

    The vibrator did a good job as there were no voids to be seen.
    Scally
    __________________________________________
    The ark was built by an amateur
    the titanic was built by professionals

  14. #28
    Join Date
    Jan 2007
    Location
    Katoomba NSW
    Posts
    4,770

    Default

    Looking good Scally.
    Those stirrups are very business like
    Those were the droids I was looking for.
    https://autoblastgates.com.au

  15. #29
    Join Date
    Aug 2010
    Location
    Glenbrook NSW Australia
    Posts
    705

    Default

    Scally
    Looking good ... nice finish
    It hard to tell from the photos but how are the heights with the surrounding ground, It look a bit high in one corner? Just thinking of run off in a heavy downpour.

    Russell
    vapourforge.com

  16. #30
    Join Date
    Aug 2004
    Location
    Coffs Harbour
    Posts
    2,014

    Default Expansion cuts

    I hired a concrete saw and cut expansion slots across the slab.

    Then I filled them with sikaflex.

    Yes rusel I had to cut the site down on the top left of the photo. The slab is about 30cm below the original ground level in the top corner.

    I will dig out an area above the shed and put in a low retaining wall. My plan is to house the dust extractor between the retaining wall and the shed.

    I have run Ag pipe around the top and side of the slab and will extend it behind the retaining wall.

    I have been waiting for some fine weather and the ground to dry out so I can finish the earthworks and remove the clay and concrete waste.

    Even with all the rain, I didn't have water running onto the slab but I will still go ahead with the retaining wall.
    Cheers
    Attached Images Attached Images
    Scally
    __________________________________________
    The ark was built by an amateur
    the titanic was built by professionals

Page 2 of 40 FirstFirst 123456712 ... LastLast

Similar Threads

  1. Workshop hire/open access workshop in Victoria?
    By ariffaazmi in forum WOODWORK - GENERAL
    Replies: 10
    Last Post: 5th February 2013, 03:27 PM
  2. C**pers Real Ale real quick
    By Buzza in forum HOME BREWING, WINE MAKING and WINE
    Replies: 1
    Last Post: 8th July 2008, 08:30 PM
  3. post about real actual WW projects from a real actual woman
    By s_m in forum WOOD WHISPERING WOMEN
    Replies: 3
    Last Post: 22nd October 2007, 02:25 PM
  4. Get real
    By MikeK in forum KITCHENS, BATHROOMS, THEATRES, etc
    Replies: 7
    Last Post: 7th March 2006, 10:14 AM
  5. Workshop or "real" projects
    By simon c in forum WOODWORK - GENERAL
    Replies: 10
    Last Post: 27th April 2004, 01:03 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •