Needs Pictures: 0
Results 16 to 30 of 39
Thread: Shed Feedback Appreciated!
-
9th March 2020, 10:07 AM #16.
- Join Date
- Feb 2006
- Location
- Perth
- Posts
- 27,792
-
9th March 2020 10:07 AM # ADSGoogle Adsense Advertisement
- Join Date
- Always
- Location
- Advertising world
- Posts
- Many
-
9th March 2020, 06:04 PM #17Intermediate Member
- Join Date
- Mar 2020
- Location
- NSW
- Posts
- 35
Thanks BobL, lots of info to help me start planning my extraction!
Cheers
-
9th March 2020, 08:03 PM #18GOLD MEMBER
- Join Date
- Jun 2005
- Location
- Helensburgh
- Posts
- 7,696
The big plus I see in using PVC is it is easy to work with the saws woodworkers use, it is readily available and easily modified when Plan A does not work out and very few Plan A's do work. I'm up to plan E at the moment in my shed.
CHRIS
-
9th March 2020, 09:11 PM #19
Hi Dan, I have sent a PM
a rock is an obsolete tool ......... until you don’t have a hammer!
-
10th March 2020, 02:08 AM #20GOLD MEMBER
- Join Date
- Aug 2007
- Location
- Saskatoon, SK, Canada.
- Posts
- 1,439
Albert I'm curious about the collection ports supplied on your sander. How many does it have and how big are they? It seems from the very little I know of them, most can't support the manufacturers recommended flow rates even though that's the way they make them. Yours would have to come with at least three 150mm/6" or bigger ports to draw from.
Pete
-
10th March 2020, 08:20 AM #21SENIOR MEMBER
- Join Date
- May 2013
- Location
- Auckland, New Zealand
- Posts
- 997
There are 2 x 160mm and 2 x 140mm on the top of the sander. here is a pic.
the 2 blast gates are servicing the 160mm port, the clear flexi are servicing the 140mm.
IMG_2685.jpgIMG_2684.jpgSCM L'Invincibile si X, SCM L'Invincibile S7, SCM TI 145EP, SCM Sandya Win 630, Masterwood OMB1V, Meber 600, Delta RJ42, Nederman S750, Chicago Pneumatics CPRS10500, Ceccato CDX12
-
10th March 2020, 07:28 PM #22Intermediate Member
- Join Date
- Mar 2020
- Location
- NSW
- Posts
- 35
-
11th March 2020, 01:40 AM #23GOLD MEMBER
- Join Date
- Aug 2007
- Location
- Saskatoon, SK, Canada.
- Posts
- 1,439
Dan before you decide on a duct material, check with an insurance company. Because it is a business they may require a metal system due to fire codes etc., and the decision is made for you. Your rules may be different than ours.
Pete
-
12th March 2020, 05:49 PM #24Senior Member
- Join Date
- Sep 2019
- Location
- Somerville
- Age
- 50
- Posts
- 295
Watching this thread with interest! Hope to be starting a similar-sized shed project late in the year, but I don't have neighbours to worry about!
-
12th March 2020, 09:35 PM #25Intermediate Member
- Join Date
- Mar 2020
- Location
- NSW
- Posts
- 35
-
12th March 2020, 09:37 PM #26Intermediate Member
- Join Date
- Mar 2020
- Location
- NSW
- Posts
- 35
-
13th March 2020, 06:46 AM #27SENIOR MEMBER
- Join Date
- May 2013
- Location
- Auckland, New Zealand
- Posts
- 997
If you are going to do it full time, you might want to consider the possibility of you hiring workers in the future and legislation around this.
100m2 is just enough for 1 person if that’s purely machinery space. You also need to have storage for stock, storage for completed goods, dedicated clamping table/zone, finishing/assembly room, spray room, display room, storage for dangerous goods... etc in my experience, the ratio of machinery space to the none machinery space is 1:2 So if your 100m2 is purely machinery space, your other area should be 200m2 or there about for a comfortable work space - if you make large furniture.
You may also want to leave room for future machinery say the likes of CNC.SCM L'Invincibile si X, SCM L'Invincibile S7, SCM TI 145EP, SCM Sandya Win 630, Masterwood OMB1V, Meber 600, Delta RJ42, Nederman S750, Chicago Pneumatics CPRS10500, Ceccato CDX12
-
14th March 2020, 04:08 PM #28Intermediate Member
- Join Date
- Mar 2020
- Location
- NSW
- Posts
- 35
I am pretty set on the size, bit I understand I am limiting myself.
I have been working in a 100m2 workshop for the past three years and although it could be tight we had up to three people working in there at a time. I plan for the space to be for myself plus one person in the future.
I am happy to outsource cnc work as I don't enjoy it and I think the noise would be an issue (loud and constant) for myself and the neighbours.
I will have 33m2 for timber, storage and dust extraction with the option of a shipping container for timber if I need to expand storage. That will leave me with 88m3 floor space for workshop. Not huge but with careful planning I am confident I can make it work.
Thanks for the advice, it all helps
-
16th March 2020, 06:50 PM #29
-
22nd March 2020, 07:48 PM #30GOLD MEMBER
- Join Date
- May 2005
- Location
- Brisbane North
- Age
- 51
- Posts
- 1,299
Hi,
You're on the right path with insultaion and sound, good job. You have described the ultimate workshop, with everyone being jealous who reads this.
I like what the machines you have listed, but ask if a 3 Phase 20" Powermatic thicknesser would be something you'd consider? Carbatec store in Brisbane has one in a create ready for freight. Going at a good price.
Similar Threads
-
My first workbench - sketchup design. Feedback / criticisms appreciated.
By Sam50 in forum THE WORK BENCHReplies: 24Last Post: 10th July 2015, 04:18 PM -
Newbie- Any help appreciated
By MitchB in forum MUSICAL INSTRUMENTSReplies: 6Last Post: 14th April 2012, 08:32 PM -
Major repair job - feedback appreciated!
By serapax in forum TRAILERS & OTHER FABRICATED STUFFReplies: 10Last Post: 5th May 2010, 01:17 AM -
The Appreciated Gift
By Jack Plane in forum WOODIES JOKESReplies: 0Last Post: 17th August 2006, 11:35 AM