I am reminded that, before I knew about the ‘VFD option’, I went to an auction at the local Technical College who were closing down their cabinet making courses :((
A brand new, still on its pallet, 3 PHASE Sawstop table saw was sold for $500!
If I had known then about the option of VFD, I would have bought it because I would have rationalised that I had about $4000 to spend and still been ahead?
Where I envisage the single page document would be used is, when the Committee sit down and say “its going to cost $30,000 to connect 3 PH to the shed, what do we do, the listed options would include getting quotes for the installation of X number of VFDs?
I guess it’s the ‘pink Volkswagen syndrome’ where you never see a pink Volkswagen until you own one and then you see them everywhere, but I now notice lots of very cheap, excellent brand, 3 phase machinery available.