Page 5 of 7 FirstFirst 1234567 LastLast
Results 61 to 75 of 96
  1. #61
    Join Date
    Aug 2020
    Location
    Melton, Victoria
    Posts
    147

    Default


  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many





     
  3. #62
    Join Date
    Aug 2020
    Location
    Melton, Victoria
    Posts
    147

    Default

    And... its flipped...


    Sorry no action shots as it was all hands on deck plus a couple of ring ins to help.
    i'm loving the shape of this hull

    I finally got to sit in my boat!!!!

    yes i'm a tad excited!!


    20191116_164816 e.jpg 20191116_164811 e.jpg 20191116_154640 e.jpg
    20191116_164836 e.jpg 20191116_152126 e.jpg

  4. #63
    Join Date
    Aug 2020
    Location
    Melton, Victoria
    Posts
    147

    Default

    the fun has only just begun...


    couple of photos of the inside!!



    20191116_165045 e.jpg 20191116_165038 e.jpg

  5. #64
    Join Date
    Aug 2020
    Location
    Melton, Victoria
    Posts
    147

    Default

    Built extra supports under the boat... halfway along the keel and up under the bow... solid as now.


    Also started cleaning up excess glue from the boxes and prepping for fillets & glassing... wish i was a bit more cautious gluing inside the hull at the start... oh well, lesson learned for the next boat


    20191130_114729 e.jpg 20191130_151359 e.jpg 20191201_223055 e.jpg

  6. #65
    Join Date
    Aug 2020
    Location
    Melton, Victoria
    Posts
    147

    Default

    Have been prepping the hull for fillets and glassing... what a painful job that is. I wish i was much neater and meticulous when applying the glue initially. i have a lot of little sharp bits to clean up and lumps and bumps everywhere... the grinder & power file makes short work of most but its still a slow process.


    anyways, other than grinding and being covered head to toe in glue powder (yes i am wearing appropriate PPE) i decided to cut out bulkheads 3 & 4 for the fuel tank followed by a dry fit. Just need to work out its final position.



    20200119_173403 e.jpg 20200119_173421 e.jpg 20200119_171848 e.jpg 20200119_171845 e.jpg 20200119_171832 e.jpg

  7. #66
    Join Date
    Aug 2020
    Location
    Melton, Victoria
    Posts
    147

    Default

    more grinding...


    I did cut out the transom... its amazing how such a simple thing makes it look that much more complete...lol



    20200125_170826 e.jpg 20200125_170850 e.jpg 20200125_170840 e.jpg

  8. #67
    Join Date
    Aug 2020
    Location
    Melton, Victoria
    Posts
    147

    Default

    i noticed that the sides weren't dead flat, not something i noticed when it was upside down and 2 foot off the floor.


    This has now been fixed, however the nose is low by 9mm but its all good as that will be rectified easily enough.


    Also trimmed up the bulkheads to remove the lip that is used on the strongback.


    20200201_123204 e.jpg 20200201_131425 e.jpg 20200201_131245 e.jpg 20200201_131627 e.jpg 20200201_131152 e.jpg

  9. #68
    Join Date
    Aug 2020
    Location
    Melton, Victoria
    Posts
    147

    Default

    a fair bit has been done, but no where near where i'd like the boat to be at.


    The forward section has been glassed.


    Then i ran out of fibreglass whilst preparing the rest of the subfloor boxes


    20200409_163718 e.jpg20200409_175506 e.jpg20200410_143436 e.jpg20200410_162324 e.jpg

  10. #69
    Join Date
    Aug 2020
    Location
    Melton, Victoria
    Posts
    147

    Default

    so i finished glassing with what i had left.


    20200413_110747 e.jpg 20200413_181554 e.jpg

  11. #70
    Join Date
    Aug 2020
    Location
    Melton, Victoria
    Posts
    147

    Default

    whilst waiting for more fibreglass to arrive i got to work on the sole (floor) and my deck/console layout


    20200418_155821 e.jpg 20200418_174845 e.jpg 20200418_175017 e.jpg 20200418_175039 e.jpg 20200418_175029 e.jpg

  12. #71
    Join Date
    Aug 2020
    Location
    Melton, Victoria
    Posts
    147

  13. #72
    Join Date
    Aug 2020
    Location
    Melton, Victoria
    Posts
    147

    Default

    rear deck extension which will house the livewell.


    I am also making the seats fully removable so they can be removed for easy cleaning


    20200419_170800 e.jpg 20200419_170822 e.jpg 20200422_144921 e.jpg 20200422_150150 e.jpg 20200422_150154 e.jpg

    - - - Updated - - -

    at this point the console & deck mods have been removed, the sole has been removed and we are glassing the boxes and working out all the cable and pipe/conduit requirements and get them installed.

    once all that is done then we will install the fuel tank and then foam all the under floor boxes.

  14. #73
    Join Date
    Aug 2020
    Location
    Melton, Victoria
    Posts
    147

    Default

    Due to my back (old work place injury flarred up) and other little projects i hadn't worked on the boat much at all...


    I did manage to get some more done...

    The underfloor boxes have been glassed and are now all finished!!

    And one of the other projects finished... the hummingbird box
    The Celtic Hummingbird Box



    20200718_162454 e.jpg 20200801_170816 e.jpg

  15. #74
    Join Date
    Aug 2020
    Location
    Melton, Victoria
    Posts
    147

    Default

    had to build the transom doubler... so the outboard has some meat to mount to.

    lots of ply, all glued up and is now glued and glassed in place.

    Next task is to install the chase tubes/conduits for the electrical systems and plumbing... fun!!


    20201004_192229 e.jpg 20201008_160213 e.jpg 20201009_195134 e.jpg 20201010_130927 e.jpg 20201010_130937 e.jpg

  16. #75
    Join Date
    Aug 2020
    Location
    Melton, Victoria
    Posts
    147

    Default

    19th October 2020

    managed to start on the pipework... i need to sort out the fuel tank so i can finalise the pipework


    i still have to seal all the holes and glue up all the joins but will do so once all the pipework is done

    20201017_174951 e.jpg 20201017_174953 e.jpg 20201017_175003 e.jpg 20201017_175040 e.jpg

Page 5 of 7 FirstFirst 1234567 LastLast

Similar Threads

  1. Chat rooms
    By plantagenon in forum FORUMS INFO, HELP, DISCUSSION & FEEDBACK
    Replies: 2
    Last Post: 13th January 2014, 07:55 PM
  2. Online chat
    By spencer411 in forum FORUMS INFO, HELP, DISCUSSION & FEEDBACK
    Replies: 0
    Last Post: 6th June 2010, 01:34 AM
  3. Tom Lie-Nielsen Chat
    By Mirboo in forum HAND TOOLS - UNPOWERED
    Replies: 1
    Last Post: 1st February 2006, 02:00 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •