    Give up shelley while your still ahead. I have seen many projects like yours start but never finish.

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many





     
  3. #47
    Join Date
    Jan 2008
    Location
    wycheproof victoria
    Posts
    95

    Default

    Quote Originally Posted by ausdesign View Post
    The pad depth is as per the soil report.
    The pad min. thickness & width is as per as1684 to suit the pier spacings etc
    The width of the pad is increased to suit the pier size ( only so the bricks have full bearing )
    This is not an uncommon construction method in Tas.
    The tie down is possibly the weak point so take the rod down into the concrete pad - you can't rely on the mortar mix for uplift strength.
    The termite shielding needs to overhang the pier by 25mm.
    thx ausdesign i have been told we have to go 1mtr deep and 150 more then the bricks for the pad footing.good point about the tie down rod ill make sure we do that.thx for your help

  4. #48
    Join Date
    Jan 2008
    Location
    wycheproof victoria
    Posts
    95

    Default

    Quote Originally Posted by thebuildingsurv View Post
    Give up shelley while your still ahead. I have seen many projects like yours start but never finish.
    im sure most builders would love owner builders to crash n burn as they would have more work but giving up isnt an option for us but thx for your concern

  5. #49
    Join Date
    Jun 2006
    Location
    melbourne
    Posts
    77

    Default

    hello,

    and one can look to seek.com.au to continually see the advertisements from the likes of metricon, porter davis, burbank, ravida and engelhart for handyman/maintenance positions

    I wonder what these maintenance crews do?

    go for it bingo, building is not difficult

    thankyou

    myla

  6. #50
    Join Date
    Feb 2003
    Location
    back in Alberta for a while
    Age
    68
    Posts
    12,006

    Default

    Shelly

    these are my sums

    someone has suggested that they would buy the new house PLUS the land for $195k

    what did the land cost you?
    what are your holding costs? i.e. the interest you have paid, and are yet to pay, on what you paid for the land — even if the land was free or bought with cash you should still factor in the interest you have forgone by not sellinmg the land and depositing the sale price in the bank (current bank interest rates are >6%)

    cost of the land = $50k (it's a guess)
    your estimate of 80k x 1.5 for contingencies = $120k (I like being conservative early on, that way you mainly only get pleasant surprises)

    Total $170k
    plus say $10k for holding costs

    say you sell for $195k, then your profit is $15k (after tax)

    between you, you and your partner will probably invest 2,000+ hours in the project (the reno across the road is currently being painted, building work started last June)

    your earnings equate to less than $7.50/hr
    appart from the experience will it be worth it?


    if you're answering yes, good luck



    ian

  7. #51
    Join Date
    Jan 2008
    Location
    wycheproof victoria
    Posts
    95

    Default

    Quote Originally Posted by myla View Post
    hello,

    and one can look to seek.com.au to continually see the advertisements from the likes of metricon, porter davis, burbank, ravida and engelhart for handyman/maintenance positions

    I wonder what these maintenance crews do?

    go for it bingo, building is not difficult

    thankyou

    myla
    thank you myla i also dont think its difficult just technical cheers shelley

  8. #52
    Join Date
    Jan 2008
    Location
    wycheproof victoria
    Posts
    95

    Default

    Quote Originally Posted by ian View Post
    Shelly

    these are my sums

    someone has suggested that they would buy the new house PLUS the land for $195k

    what did the land cost you?
    what are your holding costs? i.e. the interest you have paid, and are yet to pay, on what you paid for the land — even if the land was free or bought with cash you should still factor in the interest you have forgone by not sellinmg the land and depositing the sale price in the bank (current bank interest rates are >6%)

    cost of the land = $50k (it's a guess)
    your estimate of 80k x 1.5 for contingencies = $120k (I like being conservative early on, that way you mainly only get pleasant surprises)

    Total $170k
    plus say $10k for holding costs

    say you sell for $195k, then your profit is $15k (after tax)

    between you, you and your partner will probably invest 2,000+ hours in the project (the reno across the road is currently being painted, building work started last June)

    your earnings equate to less than $7.50/hr
    appart from the experience will it be worth it?


    if you're answering yes, good luck



    ian
    ok land cost 7.5k and all up with the land ive estimated 80k we dont have to borrow anything we will be paying cash for the lot.so even if it took 2yrs to build bottom dollar is we walk away with 200k so from renting in melb 3 yrs ago with not a cent to our name and going nowhere to 5yrs later with 200k and owing nothing to anyone i think thats a pretty good job personally.there is no way on this earth that we could of saved 200k by still renting in melb we couldnt save 10k as for our time well it beats sitting on our butts watching tv.absolutely no work up here unless your a local.in 3 1/2 years hubbys had 3mths solid work and heaps of other jobs collecting turkey eggs rounding up chooks working in the aboitoir shovelling wheat ect..we even opened a $2 shop trying to get an income but no support from the town people so we closed the doors after 8mths.so we have been trying very hard to be self efficient but very hard in a town of 750 people.building the house is our last option to be self sufficent,moving back to melb isnt an option as rents are ridiculous there now.so unless we wanted to be a burden on the system for the rest of our lives (which we dont)then building is the option for us to set us up cheers shelley

  9. #53
    Join Date
    May 2003
    Location
    Kuranda, paradise, North Qld
    Age
    62
    Posts
    5,639

    Default

    Quote Originally Posted by myla View Post
    ...............go for it bingo, building is not difficult.................
    While building is not rocket science and a good tradesman makes any job look easy it is in fact difficult if you don't have any training or experience. Watching home reno shows on telly does not count as experience. Asking questions here may help, but it won't prepare you for the reality of actually building a house. If it's so easy then why do I see so many unfinished or badly finished/built/designed/executed owner built projects around?

    Mick
    "If you need a machine today and don't buy it,

    tomorrow you will have paid for it and not have it."

    - Henry Ford 1938

  10. #54
    Join Date
    Feb 2008
    Location
    Aust
    Posts
    248

    Default

    Best thing to do is ask other people their experience in spec building. If their truthful enough they'll tell you that the only money they made was the land value increasing.

    They would have been better off just selling the land.

    Banks cant sell half finished houses.

    Right now theres a bunch of people watching their negative capital build.
    Do some research into the owner builder liability and you may find you cant sell for a year depending on where you are. You will have to get indemnity insurance if you sell.

    Building may not be rocket science but the law and legislation that goes with it is.

    You'll find many trades just get builders to build their house.

    It may sound negative but do the research. Ask around.

    You may well pull it off. Do an owners builders course "at least"
    c2=a2+b2;
    When buildings made with lime are subjected to small movements thay are more likely to develop many fine cracks than the individual large cracks which occur in stiffer cement-bound buildings. Water penetration can dissolve the 'free' lime and transport it. As the water evaporates, this lime is deposited and begins to heal the cracks. This process is called autogenous healing.

  11. #55
    Join Date
    Jan 2008
    Location
    wycheproof victoria
    Posts
    95

    Default

    ok guys thx for all the advise ive got the answer to my questions and much appreciate them cheers shelley

  12. #56
    Join Date
    Feb 2006
    Location
    vic
    Posts
    175

    Default

    I would suggest if you are trying to say money use concrete stumps. The concrete alone for the method above will cost a couple of grand.

  13. #57
    Join Date
    Jun 2006
    Location
    melbourne
    Posts
    77

    Default

    hello,

    the issue is many people have unrealistic time frame and cost of building a home, which affects people if renting or holding costs

    many owner-builders chose "difficult" building products, the most important thing is to get the shell up quick smart,

    many project homes now adays take alot of time to build as well, even with builders running the show,

    even during the 7yr warranty period for an owner-buiulder or builder built home the building-sureveyor is now becoming an integral part of the claim/compensation process if it arises,

    some reading:

    http://www.feg.com.au/papers/Update%20604.html

    thankyou

    myla

  14. #58
    Join Date
    Feb 2008
    Location
    Aust
    Posts
    248

    Default

    Personally I think there should be a obligated attendance federal based inspector visit at 3 stages of construction during renovation and new homes.

    1. Footings/concrete pour
    2. Roof stage prior to plastering
    3. Lock up

    In the UK inspectors check each stage of the process advising trades and builders what they require. A built in form of quality control.

    A check box form/report on a standard range of requirements.

    This would prevent a lot of the current issues that go to court ending in tears.

    This would prevent a lot of the dodgyness that goes on now.

    If a Trade or Builder feels the need for an inspection they call out the inspector.

    Its too late when a builder shuts down a company and opens up another or a builder uses another builders ticket of a bloke whos on his death bed with offshore accounts
    c2=a2+b2;
    When buildings made with lime are subjected to small movements thay are more likely to develop many fine cracks than the individual large cracks which occur in stiffer cement-bound buildings. Water penetration can dissolve the 'free' lime and transport it. As the water evaporates, this lime is deposited and begins to heal the cracks. This process is called autogenous healing.

  15. #59
    Join Date
    Jan 2008
    Location
    wycheproof victoria
    Posts
    95

    Default

    Quote Originally Posted by journeyman Mick View Post
    While building is not rocket science and a good tradesman makes any job look easy it is in fact difficult if you don't have any training or experience. Watching home reno shows on telly does not count as experience. Asking questions here may help, but it won't prepare you for the reality of actually building a house. If it's so easy then why do I see so many unfinished or badly finished/built/designed/executed owner built projects around?

    Mick
    hi mick i dont expect it to be dead easy just alot of hard work its the technical side thats hard to understand at times.as for owner builders stuffing up if you watch aca youll know that their are heaps of builders out there shafting people by cutting safety corners and not finishing the jobs and alot more then owner builders.if it takes 2-3yrs to finish then its better then renting in the end i have no intention of risking the lives of others to save a few bucks but if i can save a few bucks without compromising safety then we will do it ourselves.

  16. #60
    Join Date
    Jan 2008
    Location
    wycheproof victoria
    Posts
    95

    Default

    Quote Originally Posted by autogenous View Post
    Personally I think there should be a obligated attendance federal based inspector visit at 3 stages of construction during renovation and new homes.

    1. Footings/concrete pour
    2. Roof stage prior to plastering
    3. Lock up

    In the UK inspectors check each stage of the process advising trades and builders what they require. A built in form of quality control.

    A check box form/report on a standard range of requirements.

    This would prevent a lot of the current issues that go to court ending in tears.

    This would prevent a lot of the dodgyness that goes on now.

    If a Trade or Builder feels the need for an inspection they call out the inspector.

    Its too late when a builder shuts down a company and opens up another or a builder uses another builders ticket of a bloke whos on his death bed with offshore accounts
    we have that here to inspecters have to come check holes check the frame and then final check for occupancy certificate.if any problems are found at any stage then they have to be fixed before any more building work is underway

Page 4 of 6 FirstFirst 123456 LastLast

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •