Thanks Thanks:  0
Likes Likes:  0
Needs Pictures Needs Pictures:  0
Picture(s) thanks Picture(s) thanks:  0
Page 2 of 2 FirstFirst 12
Results 16 to 18 of 18
  1. #16
    Join Date
    Apr 2008
    Location
    QLD
    Posts
    16

    Default

    Quote Originally Posted by brickman View Post
    u drop the full length y-12 bar down after the core fill
    I wish, the drawing shows the lower half with N16 & then N12 at the top half with a 800mm over lap.

    Basically the same cost to just use one length of N16 (2.5m) & will save the mucking around of tying the two together.

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many





     
  3. #17
    Join Date
    Apr 2008
    Location
    QLD
    Posts
    16

    Default

    ...

  4. #18
    Join Date
    Apr 2008
    Location
    QLD
    Posts
    16

    Default

    Quote Originally Posted by Brickie View Post
    Then they are blocks and not bricks.
    Can't argue with that, does it show i don't know what im talking about ?

Page 2 of 2 FirstFirst 12

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •