    6mm looks ok but not any wider
    Regards, Bob Thomas

    www.wombatsawmill.com

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many





     
  3. #17
    Join Date
    Jan 2008
    Location
    Canberra
    Posts
    18

    Default

    i ended up doing all my calculations based on a 3mm gap, after i too decided 6mm was a bit much,
    what sized bearers and joists should i run, leaning towards running only bearers @ 450mm appart straight out from the house 4m, then putting noggins in between them all here and there, and decking parallel to the house straight across it all,

    is that a good or bad idea? is it better to run bearers parallel to the house and have joists that way etc ??

    what size wood would i use for either method?

  4. #18
    Join Date
    Nov 2007
    Location
    Melbourne
    Posts
    51

    Default

    I did a 3.5mm gap for two reasons, a) It measured out right with me only having to plane 3-4mm of the last boards and b) It looked right, I tried 5mm but spacing looked too big.

    As for which way to run your bearers, it all depends which way you want to run your boards.

  5. #19
    Join Date
    Aug 2003
    Location
    Pambula
    Age
    58
    Posts
    12,779

    Default

    5mm gap is mandatory in bush fire areas in NSW - ironically because of the Canberra fires...
    "I don't practice what I preach because I'm not the kind of person I'm preaching to."

  6. #20
    Join Date
    Jan 2008
    Location
    Canberra
    Posts
    18

    Default

    progress pics from the weekend, also put in the sliding door this weekend gone as well

    friday- demolished the old slab out back of back door
    sat- worked on installing sliding door and got it finished
    sunday- got as far as only needing to finish hanging 1 more bearer, will get most of the stirrups installed this arvo.

    the deck is extending in front of the sliding door, we'll work on that as soon as the concreting is done, as they will all dynabolt to the cement path, so quick and easy.







  7. #21
    Join Date
    Mar 2005
    Location
    In the shed, Melbourne
    Age
    52
    Posts
    6,883

    Default

    Dan6,

    What spacing do you have there in for the bearers, you also don't seem to have much on the way of stirrups holding the outermost ledger?

    Fast work but on sinking the dynabolts, took a full day to get into my bricks for the d/bolts - the stinkers must've been baked tough back in '69.
    I make things, I just take a long time.

    www.brandhouse.net.au

  8. #22
    Join Date
    Jan 2008
    Location
    Canberra
    Posts
    18

    Default

    Quote Originally Posted by Waldo View Post
    Dan6,

    What spacing do you have there in for the bearers, you also don't seem to have much on the way of stirrups holding the outermost ledger?

    Fast work but on sinking the dynabolts, took a full day to get into my bricks for the d/bolts - the stinkers must've been baked tough back in '69.
    Bearers are at 1m spacing (they werent all in yet when pics were taken) and joists are at .5m

    Also there are only a few stirrups holding it up to level so we could get it into square properly before making anything final, mate i gave a call that has built a few said this was the easiest way to make sure things are square.

    good hammer drill gets through the bricks pretty fast.

  9. #23
    Join Date
    Mar 2005
    Location
    In the shed, Melbourne
    Age
    52
    Posts
    6,883

    Default

    I make things, I just take a long time.

    www.brandhouse.net.au

  10. #24
    Join Date
    Jan 2008
    Location
    Canberra
    Posts
    18

    Default

    Some more progress pics. It should all be finished by the end of this long weekend.






  11. #25
    Join Date
    Jan 2008
    Location
    Canberra
    Posts
    18

    Default

    got 2/3 of the decking laid today, will post a few more progress pics tomorrow

  12. #26
    Join Date
    Jan 2008
    Location
    Canberra
    Posts
    18

    Default

    here are a few pics i took with the mobile phone, will do a few better ones with the digi cam later

    just need to do the final cuts on the ends with a guide for a nice straight edge, and sort out a few bits and pieces, and do the whole oiling thing.










  13. #27
    Join Date
    Mar 2005
    Location
    In the shed, Melbourne
    Age
    52
    Posts
    6,883

    Default

    Dan_6,

    With merbau -hold off on the oiling for 3 months first. You need to let the tannins leach out of the timber first, oil it now and you'll stuff things up. When the merbau gets wet it'll leach black stuff, hose down and it'll wash off, you'll have to repeat this for a while.
    I make things, I just take a long time.

    www.brandhouse.net.au

  14. #28
    Join Date
    Jan 2008
    Location
    Canberra
    Posts
    18

    Default

    No worries, yeah from what i'd read so far i knew it was going to be a while before it could be oiled,
    Cheers
    Dan

  15. #29
    Join Date
    Sep 2007
    Location
    Brisbane
    Posts
    6

    Default

    Is there any weepholes covered up by the deck?

  16. #30
    Join Date
    Mar 2007
    Location
    Melbourne
    Age
    45
    Posts
    47

    Default

    Dan your deck's looking good, just wondering however I notice u didn't use a waterproof membrane over your subfloor, or antcaps (are they required around your area?) Just curious also, the decking hasn't covered up the end of the bearer/ledger out from the house in your second last picture, did you rip a final board for this?

    Cheers.

Page 2 of 3 FirstFirst 123 LastLast

Similar Threads

  1. So you want to build a deck?
    By Groggy in forum A Woodies Yarn
    Replies: 8
    Last Post: 27th December 2007, 06:01 PM
  2. Tools required to Build Deck?? Help required.
    By swazee in forum HAND TOOLS - POWERED
    Replies: 11
    Last Post: 2nd February 2007, 07:30 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •