    Hi guys.. hoping someone could help me out with the installation of a second hand cubby house I purchased.
    It all seems pretty straight forward to put together but the dilemma I'm facing is getting the base level. The base is going on top of 600mm 90x90 treated pine stilts, and it is going to be sitting on a concrete slab (Which isn't level). Hence the problem.. what's the easiest way to get the base level without flipping it over a hundred times to play with the length of the stilts? I've probably got maybe an inch fall in the concrete from front legs to rear.

    Any help will be greatly appreciated.

    Wacker

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many





     
  3. #2
    Scribbly Gum's Avatar
    Scribbly Gum is online now When the student is ready, the Teacher will appear
    Join Date
    Jan 2006
    Location
    Telegraph Point
    Posts
    3,036

    Default

    Use a clamp and an offcut length of wood on each of the legs that need raising and keep adjusting them until the floor of the cubby is level.
    When finished, your legs will have a small gap under them that will need a suitable thickness of packing. I wouldn't try cutting the legs to level as you may be doing this ad infinitum.
    Also if you ever want to move the cubby you will still have the original leg lengths.
    .... some old things are lovely
    Warm still with the life of forgotten men who made them ........................D.H. Lawrence
    https://thevillagewoodworker.blogspot.com/

  4. #3
    Join Date
    Sep 2011
    Location
    Perth
    Posts
    3

    Default

    thanks Scribbly.. I should probably have spelled out that I'm a real amateur at this also, so I'm not quite sure what you mean.. could you please dumb it down a bit for me?

    thanks

  5. #4
    Scribbly Gum's Avatar
    Scribbly Gum is online now When the student is ready, the Teacher will appear
    Join Date
    Jan 2006
    Location
    Telegraph Point
    Posts
    3,036

    Default

    OK - build the cubby and place it directly where you want it to stand on the sloping concrete slab.
    Note which legs seem too low and need something under them to bring the floor up to level. You can use a spirit level for this.
    Grab an offcut of wood - maybe a piece of fence paling or something similar and place it flat against the leg that needs raising.
    Lift the cubby by that leg and let the paling stay in contact with the concrete. The cubby leg will slide against the paling as it rises and the paling stays put.
    When you get the cubby leg to the right height so that the floor is level, clamp the paling to the leg.
    Repeat this process for all legs that need adjusting using a fresh paling each time.
    When the floor of the cubby is completely level, you will have gaps under the cubby legs that will need some permanent and more substantial packing.
    You may find that two legs only need lifting but often it will be three. You shouldn't need to adjust four. The gaps will often be different as well.
    Once you have packed under the legs and made them firm, you can remove the temporary clamped timber.
    Hope this helps
    SG
    .... some old things are lovely
    Warm still with the life of forgotten men who made them ........................D.H. Lawrence
    https://thevillagewoodworker.blogspot.com/

  6. #5
    Join Date
    Apr 2011
    Location
    se Melbourne
    Age
    62
    Posts
    2,567

    Default

    Depending on the amount of adjustment, you can buy wedges that interlock. As they are moved their height will increase (or decrease).

    How many stilts are there? If there is one in the middle you may find that you cannot physically get there to pack it up.

  7. #6
    Join Date
    Sep 2011
    Location
    Perth
    Posts
    3

    Default Great

    Got it guys.. thanks very much for that.. seems like a much better idea than trying to take from each leg to get it all right!

    Much appreciated

    Wacker

  8. #7
    Join Date
    Mar 2007
    Location
    Munruben, Qld
    Age
    83
    Posts
    10,027

    Default

    Quote Originally Posted by wacker View Post
    seems like a much better idea than trying to take from each leg to get it all right!

    Much appreciated
    Wacker
    Don't go down that track
    Reality is no background music.
    Cheers John

Similar Threads

  1. Cubby House
    By wheelinround in forum HAVE YOUR SAY
    Replies: 5
    Last Post: 21st May 2010, 05:26 PM
  2. Cubby house - WIP
    By Gooz in forum FURNITURE, JOINERY, CABINETMAKING - formerly BIG STUFF
    Replies: 7
    Last Post: 7th August 2009, 05:15 PM
  3. Cubby House
    By newtowood in forum WOODWORK - GENERAL
    Replies: 3
    Last Post: 21st July 2009, 09:22 AM
  4. Cubby house - WIP
    By Vernonv in forum WOODWORK PICS
    Replies: 22
    Last Post: 29th April 2008, 10:53 PM
  5. Cubby House WIP
    By echnidna in forum WOODWORK - GENERAL
    Replies: 10
    Last Post: 31st October 2007, 01:45 AM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •