Results 1 to 14 of 14
  1. #1
    Join Date
    Apr 2019
    Location
    NSW
    Age
    38
    Posts
    1,135

    Default havabeers front/backyard reno's

    hey everyone,

    Thought I'd just do a large pic dump of my Front yard and back yard reno's.

    I don't have photo's of "everything" so using a few from the real estate and what ever else I can drag up.

    kicked off the reno's in june 2022. the main idea was to open up the front yard for more parking as I have pinched the double garage as a workshopy kind of space. the back yard had a large slop on it with only a small flat area that was usable and with 3 boys under the age of 5 we we're going to need more space for activities.

    our rough plan of attack.

    thumbnail_DJI_0008.jpg

    and this is how the back orginally looked even after some clearing of bushes

    image17.jpg

    image4.jpg

    image18.jpg

    20230608_132354.jpg


    20230120_120527.jpg


    20220830_160700.jpg

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Age
    2010
    Posts
    Many





     
  3. #2
    Join Date
    Apr 2019
    Location
    NSW
    Age
    38
    Posts
    1,135

    Default

    as you can see from the plam of attack photo rear access is actually pretty tricky as there is no decent way to get a machine in, as the backyard is already on an existing rock retaining wall. in the end we took the fence down and the operator just kind of dug him self a ramp and drove in.

    this rear access problems also gave us issues trying to get stuff in and out as we had to use the neighbours drive way.

    20230626_093706.jpg

    20230626_094738.jpg

    20230626_112306.jpg

    20230626_133019.jpg

    20230626_165933.jpg

    354943802_6869965219681259_3389229701280839260_n.jpg

  4. #3
    Join Date
    Apr 2019
    Location
    NSW
    Age
    38
    Posts
    1,135

    Default

    so making a mess of the backyard seemed to be the easy part. we did have rain on and off that didn't help anything.

    we also decided to drop the exisiting height of the yard by 400-ish mm to help level out the rear part of the yard. at the rear and side we put a 3 sleeper high wall just to raise the new fence up and try and ease out the battered slop a bit.

    If we could do it all again (and money wasn't an issue) i'd go back and replace the existing rock wall we a new one up the height to flatten the whole yard.

    the other cost was having to get EVERYTHING brought in via bulka bags, lucky old mate got the slightly bigger machine to be able to grab them straight off the truck. we actually did the local landscape place out of bulkabags but they where an extra $20 or $30 a bag added up quick


    20230628_124429.jpg

    20230628_162132.jpg

    20230703_123300.jpg

    20230704_094927.jpg

    20230704_164227.jpg

    20230709_153903.jpg

    20230712_144317.jpg

  5. #4
    Join Date
    May 2012
    Location
    Woodstock (Cowra)
    Age
    74
    Posts
    3,381

    Default

    That is no cheap project, looking good
    The person who never made a mistake never made anything

    Cheers
    Ray

  6. #5
    Join Date
    Apr 2019
    Location
    NSW
    Age
    38
    Posts
    1,135

    Default

    eventually got the concrete sealed with the nu tech pave coat. This stuff was great at out last house but having issues with it lifting at the this one. Another problem is we didn't put an oxide colour in the concrete this would have helped hide and chips or flakes.

    also did the sleepers as we ended up not really being a fan of the charcoal colour they come as. also paiting the Gal H posts monument as well

    20231008_222322.jpg

    20231008_222344.jpg

    20231008_222411.jpg

    20231008_222438.jpg

    20231015_193753.jpg

  7. #6
    Join Date
    Nov 2004
    Location
    Millmerran,QLD
    Age
    73
    Posts
    11,136

    Default

    I agree with Ray. A lot of work too.

    Regards
    Paul
    Bushmiller;

    "Power tends to corrupt. Absolute power corrupts, absolutely!"

  8. #7
    Join Date
    Apr 2019
    Location
    NSW
    Age
    38
    Posts
    1,135

    Default

    and this where some problems started

    so we obvisouly intended on turfing the back yard. where the main issue came up was the getting a decent amount of underlay into the backyard. the land scaper had already gotten the machine out by this point and a few large rain events had washed a whole bunch of the 20mm (if i was lucky) of underlay out.

    so the only solution was a manual one I went out and bought a 2nd hand barrow and I moved about 16 ton of dirt into the back yard using a wheel barrow and some 70x45 timbers as floats. This took about a month. In the end I could move about 2T of dirt in a day, but I couldn't just do a solid 8 days of it due to work, life, kids etc. The yard never really got perfectly level either but the turf also plays around with it.

    I'd basically put 4x 3m timbers down to make a big rectangle about 2m wide. I'd come and barrow down the dirt and roughly spread it
    screed a 2.4m across the top to level it
    walk/heel it in
    spready more dirt to fill in all the divots
    use the screed again
    walk on it once more
    sprinkle bit more dirt on top and spread/level using a level lute

    in short
    a nightmare


    I really should have gotten ALOT more dirt delivered before the landscaper finished up


    My original intention was to just throw the turf down on top of the exisiting stuff and hope for the best, a few mates convinced me with "once that turf is down, you can't just pull it back up to fix it so might as well do it right the first time". which is true, it was $3500 worth of turf so did it properly and gave it the better chance of actually surviving.

    the wife also wanted a couple of small garden beds and we put a sand pit up the back as well.

    but as the old saying goes, grass then beer you're in the clear

    20231013_202850.jpg

    20231020_122200.jpg

    20231021_093059.jpg


    20231021_182048.jpg




    Eventually it all greened up and we put a smaller garden shed in the back corner. The turf still needs to be top dressed and levelled. REALLY considering a robot mower, this once a week business is crap.

    20231116_072741.jpg

    20231112_154919.jpg

    20231218_145525.jpg

  9. #8
    Join Date
    May 2012
    Location
    Woodstock (Cowra)
    Age
    74
    Posts
    3,381

    Default

    You have certainly proved if a job is worth doing....do it well.....an awesome project you will never regret
    The person who never made a mistake never made anything

    Cheers
    Ray

  10. #9
    Join Date
    Apr 2019
    Location
    NSW
    Age
    38
    Posts
    1,135

    Default

    I kind of forgot to update this with some of the front yard stuff


    I don't really have AS many photo's of the front as I do of the back.


    so the main idea for the front yard was to try and open it up so we could get a few more car's parked in there. Made a deal with the wife that I get the double garage as a work space. the small garden shed was going, the exisiting sandstone rock walls needed to go, and we where going to install new sandstone BLOCK walls as far back as we could.

    we where also long past the "couple of weeks" mark the guy told us he could get it done in, and basically once the digger was out of the backyard it wasn't going back in. So things where dragging on.

    20230120_120026.jpg

    Screenshot 2024-01-15 204656.jpg

    20230120_124122.jpg






    so began ripping everything out

    20230623_170828.jpg

  11. #10
    Join Date
    Apr 2019
    Location
    NSW
    Age
    38
    Posts
    1,135

    Default

    digger came in and worked its magic again.

    20230713_154322.jpg



    so we where kind of hoping the power supply to the house was buried a bit deeper then where it was. But of course it wasn't. so right at the finished height of our 2nd tier of wall was the mains incomer. the line runs down the power pole out the front and basically straight line of sight to the meter box. was buried enough under the existing retaining wall and concrete slab it didn't help our plans.


    Ended up having to get a lvl 2 eleco out to sort it. In the end we dug around it as much as we could, to the point the eleco could come in, disconnect, run his new pillar box, cable and conduit behind the new wall in a day. had similar issues with water and phone but they where sorted a lot easier as they pretty much stayed in the same location. We did have to jutt out the wall a bit to give enough room for the new pillar box to go in which didn't gel too well with the wife but it is what it is.

    20230713_154343.jpg

    20230713_182704.jpg

    20230714_143949.jpg


    20230714_144113.jpg

  12. #11
    Join Date
    Apr 2019
    Location
    NSW
    Age
    38
    Posts
    1,135

    Default

    blocks went in fairly easily

    20230715_152806.jpg


    20230718_171150.jpg

    20230718_171255.jpg



    20230718_171311.jpg


    concrete was formed up and poured not too long after. I can't believe I haven't got a picture laying around of how it currently looks with the concrete actually done. Will get some up in the next few days. Which isn't too exciting as its still no where near done.

    20230805_100840.jpg


    20230805_100931.jpg

  13. #12
    Join Date
    Apr 2019
    Location
    NSW
    Age
    38
    Posts
    1,135

    Default

    reserved for updated front yard pic

  14. #13
    Join Date
    Apr 2019
    Location
    NSW
    Age
    38
    Posts
    1,135

    Default

    So between the last lot of back yard photo's and now I actually replaced the chainmesh fence. It was just cheaper and easier to replace it with chain link, but went the black coated stuff, also painted all the post's black as well. at the same time got sick of looking at the unfinished part of the yard between our wall and the fence line. Colourbond would have been our first choice, but it was $3500 just in materials (with out any digging or concrete) vs $800 of chain link and $150 worth of paint.


    so went and got a few bags of soil, mulch and some small grasses to put in there

    20240108_151907.jpg


    20240110_153714.jpg

    20240110_153653.jpg

  15. #14
    Join Date
    Mar 2008
    Location
    Cairns
    Posts
    192

    Default

    Quote Originally Posted by havabeer69 View Post


    Ended up having to get a lvl 2 eleco out to sort it. In the end we dug around it as much as we could
    just get some string and turn it into an over head power run, she'll be right, thats what they would do in thailand.

Similar Threads

  1. Silky Oak from a backyard
    By Bushmiller in forum SMALL TIMBER MILLING
    Replies: 11
    Last Post: 16th October 2022, 06:44 PM
  2. N.S.W. 3 x shoulder vice, regular front vice, large front vice & handles
    By nickwithaz in forum WOODWORK - Tools & Machinery
    Replies: 21
    Last Post: 18th July 2020, 01:46 PM
  3. Drawers: Why use a false front? I want a real front!
    By mugget in forum WOODWORK - GENERAL
    Replies: 19
    Last Post: 14th August 2015, 10:58 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •