    I need some advice……. I recently received a quote for upgrading the electrical supply to my garage (for my woodworking machinery requirements). The quote came to nearly $2900! :eek: :eek: :eek: Needless to say, this was well above my expectations. The advice I need is: “is this reasonable?”.

    The quote is as follows:
    - Install sub circuit, board and earth leakage protection in garage
    - Connect 40 amp supply at main fuse board
    - Install 1*20amp circuit and outlet for same
    - Install 1*15amp circuit and outlet for same
    - Install 4 double * 10amp outlets and circuit for same
    - All outlets are positioned along the right side of the garage above bench top
    - Supply and install 4* twin 36 watt diffuser fittings above bench. Install switch for same
    - Exclude digging of trench at depth of 300mm.

    My situation is that the garage is detached from the house. The house is where the main circuit board is. There is approximately 15m between the house and the garage.

    Also, he charged me for his time when he was at my house assessing the situation. He didn’t tell me he was going to do this at the time. Is this “standard”?

    Thanks.

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many





     
  3. #2
    Join Date
    Aug 2003
    Location
    .
    Posts
    10,482

    Default

    Quote Originally Posted by MikeK
    Also, he charged me for his time when he was at my house assessing the situation. He didn’t tell me he was going to do this at the time. Is this “standard”?

    Thanks.
    Of course this is standard.
    I see you need someone to come look at some brickwork you need doing?
    Ill be there tomorrow for $300, and give you a quote.
    Gee at this rate, I wont have to actualy do any work. X400

    Al

  4. #3
    Join Date
    Oct 2003
    Location
    Kentucky NSW near Tamworth, Australia
    Age
    85
    Posts
    3,737

    Default

    Mike

    There must be thousands of sparkeys in Sydney I would get at least four quotes. The only problem is has the building boom died of yet.

    I suppose in this day and age of charging for quotes may become standard but I would tell him if he gets the job you wont pay for the quote, I supose he was covering for his time incase he didn't get the job but by all means get other quotes.

    For the distance of 15metres it sounds a bit high to me. Is it a complete new install or is it an upgrade.

    P.S. I would take with a grain of salt what Al says

  5. #4
    Join Date
    Aug 2003
    Location
    .
    Posts
    10,482

    Default

    Quote Originally Posted by Barry_White
    P.S. I would take with a grain of salt what Al says
    Owhoooooo, Baz

    Al

  6. #5
    Join Date
    Dec 2003
    Location
    Sydney
    Posts
    173

    Default

    Bazza,

    I absolutely will get a number of quotes. Re your question "Is it a complete new install or is it an upgrade." - it's a new install.

    Al,

    Thanks. It's a serious question though. I don't mind paying if someone lets me know that it will cost something up front. I've seen a bundle of "free quotes" in advertising though and I was wondering if the situation was changing.

  7. #6
    Join Date
    Aug 2003
    Location
    .
    Posts
    10,482

    Default

    I wouldnt pay for anyone to come and give a quote.

    He obviously has too much work on hand.
    Get some other quotes, the problem is to actauly get someone to come your place.
    I have been waiting for a sparkie to get to my place for the last 3 months.

    If I have too much work on, I will quote 4 or 5 times the real price, if you get the job good , if you dont, well it doesnt matter.

    Al

  8. #7
    Join Date
    May 1999
    Location
    Tooradin,Victoria,Australia
    Age
    73
    Posts
    11,918

    Default

    Has he given a break down of prices?

    I suspect that the main cost is the installation at the main power board.

    FWIW, our whole workshop runs off a 32A circuit. This includes 3HP machines, compressors and a welder occassionally.

  9. #8
    Join Date
    Dec 2003
    Location
    Sydney
    Posts
    173

    Default

    ,

    No breakdown. What I entered above is basically verbatim.

    Regards,
    Mike.

  10. #9
    Join Date
    Feb 2004
    Location
    Oxley, Brisbane
    Age
    79
    Posts
    3,041

    Default

    When I was tree lopper I used to give 'free' quotes. Having said that, there is no such thing as a free quote. The person who paid for the free quote I gave you is the person who paid for my time on the quotes that I did win.Almost $3k sounds Bloody expensive to me. I would expect about half that.

    A much cheaper way would be to do most of the work yourself (including buying the parts from an electrical wholesale store) and just get the sparky to do the final connections. Don't get a price, just pay by the hour. Even at $80 an hour this shouldn't cost much more than about $800 for the labour.
    Bob Willson
    The term 'grammar nazi' was invented to make people, who don't know their grammar, feel OK about being uneducated.

  11. #10
    Join Date
    May 2004
    Location
    here
    Posts
    811

    Default

    I know that they say that living in sydney is dearer but mate i think this blokes taking you for a ride.
    While not a sparky i did have one for a bus partner :mad:
    this price sounds over the top

    Keep getting quotes
    Ian
    Some People are like slinky's,
    They serve no purpose at all,
    but they put a smile on your face when you throw them down the stairs.

  12. #11
    Join Date
    Aug 2003
    Location
    Emerald Qld
    Posts
    40

    Default

    MikeK
    I had a shed wired from scratch last november.
    I had
    3 phase trenched in 10m
    sub board
    8 double fluros
    10 double 10amp points
    5 double 15amp points
    4 20amp points on seperate circuits
    all of above with breackers etc.
    2 days labour for $2777.98
    So I think your man is just a little over priced. I would tell him were to get off.
    Micheal
    Bart: I am through with working. Working is for chumps.
    Homer: Son, I'm proud of you! I was twice your age when I figured that out.

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •