Needs Pictures: 0
Picture(s) thanks: 0
Results 1 to 15 of 18
Thread: Aluminium Sleeve Needed
-
12th February 2015, 02:45 PM #1Senior Member
- Join Date
- Jul 2009
- Location
- Melbourne
- Posts
- 114
Aluminium Sleeve Needed
Hi Everyone,.
Looking for someone that can turn an adapter for me in aluminum. Based in Melbourne and a reasonable price please. Job should take less than two hours all up as it is just a threaded sleeve needed. Please message me if possible.
Thanks
Alan
-
12th February 2015 02:45 PM # ADSGoogle Adsense Advertisement
- Join Date
- Always
- Location
- Advertising world
- Posts
- Many
-
12th February 2015, 03:28 PM #2GOLD MEMBER
- Join Date
- May 2011
- Location
- Murray Bridge SA
- Posts
- 3,339
-
12th February 2015, 03:44 PM #3Senior Member
- Join Date
- Jul 2009
- Location
- Melbourne
- Posts
- 114
Hi Kryn
OOps that was a bit silly of me, my apologies, it's a sleeve with an inner thread female of 3/4" - 16 and an outer of 3/4" NPT I have been told . ID of the thread socket is 0.908". Length of 0.6". All material to be supplied by machinist. If it is easier a shoulder of 0.25m" can be left on the one side. Hope that's clear, I'm not that good at describing unfortunately.
Thanks
Alan
-
12th February 2015, 04:04 PM #4
Alan, I find it interesting that you say "you are not very good at describing the job" but you state quite confidently that "Job should take less than two hours all up as it is just a threaded sleeve needed".
In my experience most trades people, be they machinists, plumbers or electricians do not respond very well to a request for a quote under those conditions.
-
12th February 2015, 04:15 PM #5Senior Member
- Join Date
- Jul 2009
- Location
- Melbourne
- Posts
- 114
I am hoping an hour per thread cut, perhaps I'm over hopeful....
-
12th February 2015, 05:00 PM #6Pink 10EE owner
- Join Date
- Aug 2008
- Location
- near Rockhampton
- Posts
- 4,304
Not too many people will have a 3/4 NPT die to cut the thread... it is a very simple job otherwise.... cut material to length, drill and tap end... Put a 3/4 bolt in the chuck and screw workpiece onto that and turn to size, then thread... job done.. Supply concrete warranty with job... warranty only applies while it is on your concrete...
Light red, the colour of choice for the discerning man.
-
12th February 2015, 05:04 PM #7Senior Member
- Join Date
- Oct 2008
- Location
- blackburn vic
- Posts
- 221
More Info
Hi Alan
I am having difficulty grasping what you are asking for. 3/4" ID thread and 3/4"OD thread and .6" long doesnt make sense to me!
Roger
-
12th February 2015, 05:06 PM #8Senior Member
- Join Date
- Jul 2009
- Location
- Melbourne
- Posts
- 114
Hi Roger,
I suspected it may have to be cut on the lathe rather than a die.
Thanks for the reply
Alan
-
12th February 2015, 05:10 PM #9Pink 10EE owner
- Join Date
- Aug 2008
- Location
- near Rockhampton
- Posts
- 4,304
-
12th February 2015, 05:57 PM #10Philomath in training
- Join Date
- Oct 2011
- Location
- Adelaide
- Age
- 59
- Posts
- 3,149
A couple of questions -
Firstly, why Al? Brass is easier to thread and I think I've seen more pipe threads in brass than Al.
Secondly, (if I understand the part) it is a hollow ring with threads on the inside and outside. How will it be installed? There is not much to hang onto.
Michael
-
12th February 2015, 06:06 PM #11Senior Member
- Join Date
- Jul 2009
- Location
- Melbourne
- Posts
- 114
Hi Michael,
I was thinking Al because I was told it is easier to work with, I never considered brass. If the sleeve has a shoulder or flange, it could butt up against that and I would use some loctite. If that was not an option, I could drill and tap a couple of grub screws into the fitting it screws into and use that. do you think that 15mm too short for the threaded section to hold ?
Thanks
Alan
-
12th February 2015, 06:17 PM #12Philomath in training
- Join Date
- Oct 2011
- Location
- Adelaide
- Age
- 59
- Posts
- 3,149
Without knowing the application 15mm should not be a problem. I was more wondering how you would install the sleeve in the socket it would go into.
Michael
-
12th February 2015, 06:38 PM #13GOLD MEMBER
- Join Date
- Aug 2011
- Location
- Melbourne
- Posts
- 2,951
I assume that if the job was to be done on the lathe (including both threads) then a TTA would be needed since NPT is a tapered thread. Simon
Girl, I don't wanna know about your mild-mannered alter ego or anything like that." I mean, you tell me you're, uh, super-mega-ultra-lightning babe? That's all right with me. I'm good. I'm good.
-
12th February 2015, 07:55 PM #14GOLD MEMBER
- Join Date
- Jun 2007
- Location
- sydney
- Age
- 64
- Posts
- 3,566
If it's not critical and it doesn't seem to be a taper could be cut first and then a parallel thread turned.
-
12th February 2015, 08:00 PM #15Senior Member
- Join Date
- Sep 2008
- Location
- Riddells Creek
- Posts
- 300
Similar Threads
-
Advice on sleeve needed
By morrisman in forum THE HERCUS AREAReplies: 13Last Post: 9th July 2011, 01:30 PM -
aluminium machining advice needed
By horse in forum METALWORK FORUMReplies: 1Last Post: 12th January 2010, 02:10 PM -
Aluminium weld needed
By Arron in forum WOODWORK - GENERALReplies: 0Last Post: 5th July 2009, 08:19 PM