    Default Building in Under

    Hi All,
    There are so many experienced people here. I'm a novice but I like the idea of doing it Myself.

    I'm thinking to raise my Queenslander on Steel RHS, then build a timber floor, External + Internal walls and a staircase. I guess that a timber floor is easier then a concrete slab. I'm also thinking of using recycled materials from demolished houses.
    Does anyone have stories from their experience of doing this.

    Thanks..

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many





     
  3. #2
    Join Date
    Jan 2004
    Location
    South of Adelaide
    Posts
    303

    Default

    G'day Kenchiku. I saw a home reno program on TV a fair while back where a guy raises this style of house on his own. Living in SA it is all foreign to me, but it looks like one hell of a job.

    As the show went on the owners, who were trying to most of it themselves (once the house was up in the air) struck one problem after another and the costs escalated by thousands $$. Problems with sewer lines, house being unliveable for weeks, the bobcat moved in to excavate they struck rock and so on. From memory they built the lower floor on a slab floor and brick walls. I think if they had their time over they would have second thoughts.

    Others here might point you in the right direction.
    Good Luck
    Jack

  4. #3
    Join Date
    Mar 2005
    Location
    QLD
    Posts
    4

    Smile

    Yes, I remember that one....It did look a bit out of control. Even though I won't need to excavate I do see what you mean about unforseen things. I will be lifting so I will need to move out while water is disconnected. I know there are many more....

    Thanks
    Ken...

  5. #4
    Join Date
    Oct 2004
    Location
    Brisbane
    Posts
    117

    Default

    I am very interested in this thread I want to do the same,

    I am trying to find out what sized RSJ I will need and how I work out the spans.
    I assume I will have to employ the services of a structural engineer.

    I have worked through a plan on the actual lifting and I have access to earthmoving equipment that I can use myself I am very interested in peoples
    thoughts.

    Tom

  6. #5
    Join Date
    Jul 2004
    Location
    Canberra
    Age
    65
    Posts
    417

    Default

    Quote Originally Posted by tcns
    I am trying to find out what sized RSJ I will need and how I work out the spans.
    I assume I will have to employ the services of a structural engineer.

    Tom
    You can be absolutely certain that the council or whoever is in charge of building will want to see an engineer to specify the the size of the RSJ, and the structure that holds it in place as well as the footing that supports the structure.

    If you are planning something like this you will need:

    1. planning approval for what you are proposing - will need drawings to show what is proposed (in general terms) - may need to consult neighbours etc. This is a detailed concept approval.

    2. once you have the above - you will need the engineers certificate and design showing the detail design

    3. generally an independent certifier to certify the work is done as per 2 above

    Cheers
    The Numbat is a small striped marsupial whose whole diet consists of termites.

  7. #6
    Join Date
    Oct 2004
    Location
    Brisbane
    Posts
    117

    Default

    Thanks numbat,

    My thought process is not nearly as disorganised as that last post of mine is.

    I am having and architect draw what we are after as a concept and then either he or I will put it to a structural engineer to get the details of the supports and a diagram/report on what is required for foundation and supports.

    From there I will most likely order steel, and get it in place under the house on the current stumps, lift and secure and then put in the new stumps and set them as per the engineer's advice. I guess then excuvate the earth under the house, form up underneath (another visit from the engineer) pour the slab and they we are half way there

    Things I can think of from here.

    1. electricity - does it have to be switched off - is it just the possibility of pulling the earth out ?

    2. Sewer - to be honest my sewer main needs replacing due to tree roots and age so that can be dug in before hand.

    3. storm water - don't have one at the moment may as well dig one in to the gutter

    4. Water main, have to get it switched off I suppose and re-done.

    5 .I have seen posts made with threaded ends for self leveling - I would specify those so I can even the house back up

    6. Cracked plasterboard, I guess patch and repair.

    Head hight, I need to maintain an 10" ceiling downstairs plus room to accommodate the rsj, and ceiling frame, water/serwer services from upstairs.

    Any other thoughts?

    Tom

  8. #7
    Join Date
    Aug 2004
    Location
    Brisbane
    Posts
    89

    Default

    We have recently done this little exercise. Here's some things to think about:

    - What value will lifting and building under add to the property? What rooms can you add, and will you get better views? Is the value added more than the cost of doing it? As a rough guide, allow $100k unless you can do a lot yourself.

    - Make sure your builder has insurance or you are covered by the BSA!!! House lifting can go wrong and, if it does, chances are you won't have a house any more.

    - Consider whether the house should be moved to a different place on the block. If there is a better position for it, now is the time to move it.

    - How high you are lifting won't affect the cost much. So if it is a Queenslander, think about going a bit over the legal minimum to keep the feeling of high-ceilings throughout the house.

    - Electricty mains should be disconnected from the electricity pole. Although if it is only a small lift they might not worry.

    - EVERYTHING will be cut when they lift the house... downpipes, sewerage, electrical, phone, Foxtel, gas, water. Do some of this yourself in advance, if you can, otherwise the house-lifters will disconnect everything using a 9" angle grinder. Don't forget to allow for re-connection costs. Also, check whether your electricity meter box has to be relocated.

    - Lifting is pretty quick - maybe takes a day or two. Then the new posts and steel beams go in. Obviously you need to have the plans for downstairs done at this stage so you know where the posts will go. We used PFC230 beams which I think are good for a span of 5m, and 75x4 RHS posts. A structural engineer will be required. If you have brickwork/blockword around the perimeter, it will need to be extended up. Then the house gets lowered back down onto the new posts, and things can be reconnected. All up, it took us about 6 weeks until we could move back in. The slab downstairs was done after that.

    - All doors/windows will need to be open for lifting. So, if you have any windows that have kind of stuck over time, free them up. Also all pictures, paintings, mirrors etc have to be taken down. If you have any delicate furniture, high shelving etc either remove it or make sure it can't fall over. We only had one shelf fall down... unfortunately it fell on my stereo :mad:

    - How will you get into your house once it is lifted? We used an extension ladder for 4 weeks while we waited for the carpenter to build new front steps. Not easy getting the groceries up an extension ladder. Don't forget the cost of the steps, too!

    - If you have VJ walls, these will move around a bit so invest in a stockpile of No-More-Gaps. I presume plaster would need some patching too. Most likely some doors/windows will need planing to close properly again.

    I'm sure there's more, but there's a few things off the top of my head. Let me know if you have any specific queries.

    Just to whet your appetite, I have attached a pic of our place up in the air.

  9. #8
    Join Date
    Oct 2004
    Location
    Brisbane
    Posts
    117

    Default

    Hi Theremin,

    Thanks a lot for your post that is great insight,

    Do you have any more photos of underneath during the lifting process
    and who did you use ? Can you give me round figures of how much the lift
    alone was ?

    I would be doing this job in a similar way to yours.

    Lift, slab, build under.

    Like I said, I am just keen to see the process and support structure, I have consulted engineers with this, I want to excuate under my house first myself and still have it stilling up there and then look at a lift from there.


    Thanks for your help
    Tom

  10. #9
    Join Date
    Nov 2003
    Location
    Australia and France
    Posts
    8,175

    Default

    All those thinking of lifting themselves.... don't !!

    The risks are too great, and getting the re-stumpers in is relatively cheap. They have all the right gear, and the bozos who don't seem to mind if houses fall on them!

    You won't have insurance if you do it yourself under any circumstances, and unless you are really big and strong, carrying all those big heavy styes will wear you out!!

    If you live in Bris and want an engineer who knows a bit about this stuff, send me a PM and I'll give you some details.

    As for lifting it higher than the limit... yes you'll get the feeling of high ceilings when you are inside the house, but you'll completely bugger the character of it from the outside. Have a careful look at a Queenslander next time you drive past, and you'll note that the proportions invariably give barely standing height under the floor.

    Whatever the reason for this historically, it is one of the things that actually gives the well known character.

    Cheers,

    P (Who in one life designed hundreds of renovations for owners of Qldrs, and spent a lot of time finding innovative ways of retaining the proportions, none of which allowed high ceilings on the lower level!)

  11. #10
    Join Date
    Mar 2005
    Location
    QLD
    Posts
    4

    Default

    Hi Theremin,

    Yes, that's a great list. Yes, who did you use for the lifting and how much was it if you don't mind me asking. I gues you have the cost of 1. The Steel, 2. The lift itself, 3. The reconnections and 4.The slab.

    How far are you through your project?

    Thanks
    Ken

  12. #11
    Join Date
    May 2003
    Location
    Kuranda, paradise, North Qld
    Age
    62
    Posts
    5,639

    Default

    Ken
    I wouldn't consider doing a lift myself, and I'm in the building game. I doubt very much you would be saving anything on the lift process by the time you factor in the cost of hiring/procuring all the lifting gear and timber for styes. The blokes that I've seen used a bobcat to lift all the styes into place. You will also be paying full price for all your steel and concrete and if you need a pump to place the concrete you may find that you won't get one unless you have someone in the trade organising it, as they're usually flat out and not interested in working for owner builders. You will need to get insurance cover for the entire job as well because your household insurance won't cover you. Then how good is your welding? Can you produce welds to meet the standards? Do you know what to look for in a weld?

    If you want to do some of it yourself I would suggest doing all the prepwork, organising plumber to cut all the copper and replace with a few big loops of soft drawn copper so that you'll have the water back on straight after the lift, getting a sparky in to do the same for the wiring and telephone. Then get the pros in to do the lift and new beams/posts whatever. then if you really want you can do the new stuff underneath. Unless you have a mini excavator and lots of practice pay someone (with insurance) to do it. If you can place and finish concrete so that it's level, smooth and free of voids then pour the slab yourself.

    Building isn't rocket science, but there's a hell of a lot more involved than the home reno shows would have you think and lifting a house, excavating underneath and building another story under with disconection and reconnection of services and provision of new services is more complex than building a new house. Would you feel confident building a house from scratch? If not, then lifting your house would be a nightmare. Sorry to be so negative, but I really don't think this is a job that a novice should consider.

    Mick
    "If you need a machine today and don't buy it,

    tomorrow you will have paid for it and not have it."

    - Henry Ford 1938

  13. #12
    Join Date
    Jun 2003
    Location
    ...
    Posts
    7,955

    Default

    Quote Originally Posted by journeyman Mick
    Sorry to be so negative, but I really don't think this is a job that a novice should consider.
    As usual you're right Mick. Even in the TV reno show they used professionals to do the house lift and they still had enormous problems and cost overruns.


    Peter.

  14. #13
    Join Date
    Oct 2004
    Location
    Brisbane
    Posts
    117

    Default

    Had the architect over last night for a look around.

    He had some really great advice, basically the fall of my to the street is such that I could remove all the earth I wanted underneath and make it the right height. It would be about 450mm + slab which would be a lot of dirt to remove
    to but entirely possible

    He is providing me with the specifications of the steel etc.

    I am kicking off on the weekend with the digging, love the mini digger I have got at the moment. I will take some photos and start a new thread on the work

    Thanks for you input and sorry to hijack the thread

    Tom

  15. #14
    Join Date
    Apr 2004
    Location
    maybe next door
    Posts
    73

    Default

    Hello Kenchiku/Tcns/Theremin et al
    With due respect to the cautionary posts Im planning on doing this as well.
    Theremin - from your photo it seems that the house was supported on 2 temporary UBs - any idea why the house lifters didnt place the actual final steelwork and use that to lift the structure??? I saw a house being raised recently that was quite big and was supported (under supported) on four stacks of hardwood and 2 UBs and the UBs were bending under the strain - cant imagine how much repair/make good work would have been necessary as a result.
    I was planning on sliding the steel under, raising and fixing it to the underside of the current bearers and jacking that to the required height with 10 tonne hydraulic jacks (about 60 bucks each) in small increments - although Im only going to be raising mine about 1 metre if its OK with the friendly fascists down at town planning. I dont have a problem with preserving proportions because the level of my block is about 2 metres above the road and the house is practically on its guts anyway. When its at the correct height I plan get earth movers to excavate the appropriate places for columns (sort of hard to explain) then bolt fix the columns then excavate the rest for a garage. I got a quote to excavate 60m2 of dirt for about 4 grand and it will take about 2 days - how easy is that?? Kenchiku - Id be interested to hear about your plan for the actual process of raising your place. Id also suggest that you use the trading post for sourcing timber rather than recycling yards - the ones that Ive seen are either a bit crap or are extortionists - one guy was selling 5 3/4 Hoop flooring for $11.00 bucks a metre when you can get it machined from new dried Hoop for about $3.50. I recently bought two 8.5 metre lengths of 100 year old ironbark for $3.50 per metre (straighter than a skinhead on Hitlers birthday) from a trading post source. (bridge wrecker) And didnt it look dodgy strapped to the trusty F100!! Drove passed a motorcycle cop but thankfully he chose to ignore it - too much paperwork I suppose.
    Here's to ya.
    Last edited by capedcrusader; 5th March 2005 at 02:41 AM. Reason: whoops - pi$$ed again

  16. #15
    Join Date
    Aug 2004
    Location
    Brisbane
    Posts
    89

    Default

    Quote Originally Posted by capedcrusader
    Theremin - from your photo it seems that the house was supported on 2 temporary UBs - any idea why the house lifters didnt place the actual final steelwork and use that to lift the structure???
    Not sure. They lift houses for a living so I assume they knew what they were doing..