When to cement in stirrups/posts?
I was planning on using lines, etc to get all my levels and falls right, then cementing the stirrups inplace before laying the bearers. As its my first attempt at a deck I'm wondering whether I'm best of proping the bearers in place with the stirrups attached, then cement the bearers in place. Is there a prefered method/way/order of doing things?
-
18th September 2007 04:50 PM # ADSGoogle Adsense Advertisement
- Join Date
- Always
- Location
- Advertising world
- Posts
- Many
-
18th September 2007, 05:19 PM #2Senior Member
- Join Date
- Sep 2007
- Location
- Melbourne, Australia
- Posts
- 335
Hey Williamstown.
Personally, I would get all the falls/levels right, prop the stirrups in, lay a bearer over them and check with a water level on a straight edge to make sure its level. If its all level and you're happy then cement it in.
-
18th September 2007, 06:23 PM #3Senior Member
- Join Date
- Dec 2005
- Location
- geelong
- Posts
- 123
Yeah i usually mount bearers and even a few joists and check levels before concreteing.
-
20th September 2007, 12:05 PM #4Senior Member
- Join Date
- Oct 2006
- Location
- ACT
- Posts
- 129
I put all bearers and joists on my first deck then attached the posts in the hole and then filled with concrete. it seemed the easiest way to me so I will be doing it again on my current projects.
I dont think it would work if your deck was well off the ground.
Similar Threads
-
Moving cement bags
By Iain in forum HINTS & TIPSReplies: 5Last Post: 20th December 2002, 05:47 PM