    Default When to cement in stirrups/posts?

    I was planning on using lines, etc to get all my levels and falls right, then cementing the stirrups inplace before laying the bearers. As its my first attempt at a deck I'm wondering whether I'm best of proping the bearers in place with the stirrups attached, then cement the bearers in place. Is there a prefered method/way/order of doing things?

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many





     
  3. #2
    Join Date
    Sep 2007
    Location
    Melbourne, Australia
    Posts
    335

    Default

    Hey Williamstown.
    Personally, I would get all the falls/levels right, prop the stirrups in, lay a bearer over them and check with a water level on a straight edge to make sure its level. If its all level and you're happy then cement it in.

  4. #3
    Join Date
    Dec 2005
    Location
    geelong
    Posts
    123

    Default

    Yeah i usually mount bearers and even a few joists and check levels before concreteing.

  5. #4
    Join Date
    Oct 2006
    Location
    ACT
    Posts
    129

    Default

    I put all bearers and joists on my first deck then attached the posts in the hole and then filled with concrete. it seemed the easiest way to me so I will be doing it again on my current projects.
    I dont think it would work if your deck was well off the ground.

Similar Threads

  1. Moving cement bags
    By Iain in forum HINTS & TIPS
    Replies: 5
    Last Post: 20th December 2002, 05:47 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •