Thanks Thanks:  0
Likes Likes:  0
Needs Pictures Needs Pictures:  0
Picture(s) thanks Picture(s) thanks:  0
Page 2 of 2 FirstFirst 12
Results 16 to 26 of 26
  1. #16
    Join Date
    Dec 2006
    Location
    Outer East - Melbourne
    Posts
    316

    Default

    Here are the pics of the bathroom finally finished

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many





     
  3. #17
    Join Date
    Dec 2006
    Location
    Outer East - Melbourne
    Posts
    316

    Default

    Pics from various angles

    The toilet seat was the hardest to find. It is original 50's. They still make them new, $166

  4. #18
    Join Date
    Dec 2006
    Location
    Outer East - Melbourne
    Posts
    316

    Default

    We spent a fair bit of time deliberating over position of facilities.

    The window had only one outside wall to be on

    The shower had only one corner to be in

    The bath really could only be below the window.

    The toilet I was not having next to the bath. I cannot relax in a bath with a pan next to me.

    We are a strict seat and lid down house, so the toilet is not too bad eh?

    When we build the back extension there will be a second toilet that will be 'outside' use, not ensuite style.

  5. #19
    Join Date
    Dec 2006
    Location
    Outer East - Melbourne
    Posts
    316

    Default

    Closeup of the lights

  6. #20
    Join Date
    Feb 2005
    Location
    Melbourne, Australia
    Age
    46
    Posts
    2,346

    Default

    pretty cool Peter. Those side mirrors and lights on the medicine cabinet actually look quite good too, your wife must be well pleased. Are you going to put a bead around the cabinet to seal it against the wall?

    Congratulations on actually getting it done.
    I know not with what weapons World War III will be fought, but World War IV will be fought with sticks and stones.
    Albert Einstein

  7. #21
    Join Date
    Dec 2006
    Location
    Outer East - Melbourne
    Posts
    316

    Default

    I did the laundry at the same time, and the pantry extension.

    They are not quite finished, just a small bit of painting.

    The kitchen is still to come.

    Pic 1 is as you walked towards the laundry, with dunny on right
    Pic 2 is in the laundry
    Pic 3 is other side of LH wall of laundry, being the RH wall of kitchen in this pic

  8. #22
    Join Date
    Dec 2006
    Location
    Outer East - Melbourne
    Posts
    316

    Default

    This is the laundry and pantry almost finished now

    Pic 1 shows the trough and the linoleum tiles, same as bathroom
    Pic 2 shows the laundry cupboards. A real bonus as there were none before
    Pic 3 shows the tiling behind the trough
    Pic 4 shows the wall that was the LH wall of the original laundry, and was also the RH wall of the kitchen. The wall section you can see in the RH of this shot is basically the back of the new laundry cupboards. There is a new cavity slider on the LH side of this opening, and the fridge is recessed into the RH side. The pantry is inside this small room which is about 2 x 2 metres. With the fridge recessed in, the upright freezer inside, and the hot water service inside, it is reduced to 2/3 of the total room size.

    The opening in the wall had a 240mm F17KDHW lintel fitted above.

  9. #23
    Join Date
    Dec 2006
    Location
    Outer East - Melbourne
    Posts
    316

    Default

    Now in the whole process, I totally replumbed, rewired, fitted windows, wall studs fitted as required, replastered, put down tile underlay, retiled, fitted all fittings, hobs, bath, doors, 1 new wall, assembled everything, painted everything etc all myself.

    The only external contractors were the electrician who did the screws for connections, the linoleum tile layers, the cabinet maker for cupboards and the shower screen fitter.

    Total cost to do all this including using all brand name Australian made fittings (except a 2/H cistern and pedestal basin), Australian made products (except linoleum), materials and contractors. I have added it up as $18K conservatively, so maybe $19K including forgotten small bits

  10. #24
    Join Date
    Dec 2006
    Location
    Outer East - Melbourne
    Posts
    316

    Default



    I have to laugh. You have picked the only small item that still has to go on. I have the bead, just have to paint and fit it.

    The wife has pretty much designed it all. She wanted the side lights to help with preening.

    We got the medicine cabinet made old style with the door in the middle with two side infills. I like this style too, as a cabinet with two doors having a join in the middle is real irritating, plus you can hide things around the sides. Did you know 40% of people at a party will look in the hosts medicine cabinet.

    The shower screen is certainly not retro, but it is unobtrusive, and fits in well.

    Quote Originally Posted by martrix View Post
    pretty cool Peter. Those side mirrors and lights on the medicine cabinet actually look quite good too, your wife must be well pleased. Are you going to put a bead around the cabinet to seal it against the wall?

    Congratulations on actually getting it done.

  11. #25
    Join Date
    Dec 2006
    Location
    Outer East - Melbourne
    Posts
    316

    Default

    Another small modern thing we did was to fit pop up plugs in the basin and bath.

  12. #26
    Join Date
    Dec 2006
    Location
    Outer East - Melbourne
    Posts
    316

    Default

    Did you notice the toilet roll holder. Suction cap jobbie. So easy to fit, and solved the problem of not having a wall to hang the spool off.

    Howards storage world have a heap of suction cap fittings for bathrooms. Great if you are in a rental and want extra towel rails or soap holders.

Page 2 of 2 FirstFirst 12

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •