Thanks Thanks:  0
Likes Likes:  0
Needs Pictures Needs Pictures:  0
Picture(s) thanks Picture(s) thanks:  0
Results 1 to 5 of 5
  1. #1
    Join Date
    Nov 2006
    Location
    canberra, ACT
    Posts
    46

    Default extending brickwork

    I have an outdoor courtyard area with double brick walls to about 5ft high. There is an open timber pergola above this, some on brick piers and some on timber posts in stirrups bolted to the brick walls, but it only covers half the area and is quite low and falling apart.

    I would like to build some small brick piers (230x230) on the outside corners of the brick wall to support new timberwork and raise the height to gutter height. The new piers would be about 3ft high, my question is how do I tie the new piers to the existing wall, or don't I need to? I am thinking that a piece of bar bolted/chemset into the top of the existing wall and then build the new piers around this might be ok??

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many





     
  3. #2
    Join Date
    Aug 2003
    Location
    .
    Posts
    10,482

    Default

    Quote Originally Posted by scottyb View Post
    I am thinking that a piece of bar bolted/chemset into the top of the existing wall and then build the new piers around this might be ok??
    You need to tie in the new piers or they will just peel off in time, the method you mention will work gooder but you may have to put in 3 ties per pier.

    Al

  4. #3
    Join Date
    Aug 2007
    Location
    devonport
    Posts
    26

    Default

    What needs to be considered is not so much tieing the new piers to the existing wall as this is what mortar is for , but tieing down your new pergola to the top of the pier , I would suggest chemsetting in an 8 mm threaded rod at a depth of approx 100mm in existing wall and bringing up your new pier around the threaded rod and leaving this extended the depth of your pergola beam above the pier so you can drill a hole through the beam and bolt it down , the downward pressure will also stabilise your new pier as well as having the threaded rod reinforcing the pier , regards

  5. #4
    Join Date
    Aug 2003
    Location
    .
    Posts
    10,482

    Default

    Welcome brickman, that makes 4 or was it 5 of us brickies on here at present.

    Al

  6. #5
    Join Date
    Nov 2006
    Location
    canberra, ACT
    Posts
    46

    Default

    Thanks Oz and Brickman. I was just thinking today that a piece of galv. threaded rod would be good to bolt the beams down. I was also going to wind a few pieces of 3 gauge galv wire around the rod and bend the ends so they hang in the brick 'holes' (proper name escapes me, not frogs anymore) between every couple of courses.

Similar Threads

  1. brickwork advice needed
    By scubabob in forum BRICKWORK
    Replies: 5
    Last Post: 4th July 2007, 06:15 PM
  2. Suggestions for restoring fireplace brickwork
    By GTWAGN in forum BRICKWORK
    Replies: 22
    Last Post: 30th June 2007, 12:49 AM
  3. Saltly powder on brickwork
    By oricenap in forum BRICKWORK
    Replies: 8
    Last Post: 17th October 2006, 11:11 AM
  4. Extending a pergola
    By Tiger in forum LANDSCAPING, GARDENING, OUTDOORS
    Replies: 4
    Last Post: 12th September 2005, 10:41 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •