Thanks Thanks:  0
Likes Likes:  0
Needs Pictures Needs Pictures:  0
Picture(s) thanks Picture(s) thanks:  0
Page 2 of 4 FirstFirst 1234 LastLast
Results 16 to 30 of 47
  1. #16
    Join Date
    Jun 2006
    Location
    East Warburton, Vic
    Age
    54
    Posts
    14,176

    Default

    Mines got 2 one way and the other 2 the other way, because that's the way I did it and how I wanted it. Nothing to do with looks or support
    Cheers

    DJ


    ADMIN

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Age
    2010
    Posts
    Many





     
  3. #17
    Join Date
    Feb 2003
    Location
    Garvoc VIC AUSTRALIA
    Posts
    11,464

    Default

    d'ya really think another erector will take over the job?

    wishful thinking
    Regards, Bob Thomas

    www.wombatsawmill.com

  4. #18
    Join Date
    Aug 2005
    Location
    Victoria
    Posts
    664

    Default

    Why not leave them as they are and have some flashing folded up to cover the open side once you have put your conduits in.

    Tools

  5. #19
    Join Date
    Apr 2005
    Location
    Sydney
    Age
    63
    Posts
    1,619

    Default

    Quote Originally Posted by Jacksin View Post
    I think your beef is certainly legitimate and is with the company who haven't passed your wishes on to the erector and they are liable for any cost increase (provided you have your requests in writing). Lets face it, its your money and if the erector wants to act like a prima-donna and get the sulks, tell him to bugger off and ask for another erector who is not so childish.
    Well then he has to have documented proof of which way the columns were supposed to go. I doubt that it would be on the drawings. From what I gather, all he's got is a verbal argument after three of the frames had already been stood up. It's easy to say it's being childish wanting to be payed for any extra work that's involved in satisfying a fussy client. Personally I think it's childish being so fussy in the first place.
    I'm sure he wouldn't be so fussy if he had to pay to have the frames turned around, but he's got no problems in having the builder waste an extra day if he doesn't have to pay for it.


  6. #20
    Join Date
    Mar 2004
    Location
    Carine WA
    Age
    74
    Posts
    679

    Default

    Hi

    It's YOUR MONEY, YOUR SHED, you have it built they way YOU WANT - it's THAT simple.

    If however there are difficulties in building it the way you want then YOU may have to pay extra. eg If the erector was not told beforehand how the shed should have been erected, then you may need to pay for dismantle and reassembly.

    If for some reason the supports don't allow the construction the other way around then you may have to pay or just accept it.

    If there is no reason WHY it can't be done the way YOU want, then the person doing the job HAS NO CHOICE to DO IT the way YOU want.

    Whether or not he "always builds them THAT way" is NOT the point he is building it FOR YOU, NOT HIMSELF so "YOU RULE". If he doesn't like it he doesn't get paid SIMPLE!
    Kind Regards

    Peter

  7. #21
    Join Date
    Feb 2003
    Location
    Garvoc VIC AUSTRALIA
    Posts
    11,464

    Default

    The subby had already started building the shed the normal way.
    then the problem arose. Subbies get paid for the job, not by the hour

    So you want SPECIAL - YOU PAY FOR IT !!!!!!

    Stubborn means it'll take a looonnnggg time for it to be built!!!!
    Regards, Bob Thomas

    www.wombatsawmill.com

  8. #22
    Join Date
    Nov 2003
    Location
    Australia and France
    Posts
    8,175

    Default

    Quote Originally Posted by FlyingDuck View Post
    So how was I to know that he would start building it the other way? I mean, am I supposed to sit down with him before hand and tell him which way I want every piece of material to go?
    Yes.

    P

  9. #23
    Join Date
    Jan 2007
    Location
    Goulburn NSW
    Age
    89
    Posts
    913

    Default

    but after 10 years as a cabinet maker you tend to be a bit pedantic about the little touches that make all the difference.

    You should have asked the installers for a look at their plans before they started. If I was them I wouldn't be coming back.
    les

  10. #24
    Join Date
    May 2007
    Location
    Emerald Qld
    Age
    53
    Posts
    53

    Default

    I think the bloke who is builder needs a refocus. If you've asked for it to be the same as your other one, and their brochures show them that way then you're within your rights to ask him to erect what you paid for.
    I don't see why you should have to put up with your shed not being constructed as represented by the company. Your builder should be looking to satisfy his customers.
    His "small thing" of facing them towards the back is poor workmanship.
    I have no doubt that 95% of people on this forum would choose to have them installed the way your asking for them to be installed.
    Funnily enough i bet 95% of people would question the reasoning of the c channel being installed the other way.
    Last edited by Pricey; 26th July 2007 at 09:35 AM. Reason: i was refering to the builder
    Stop destroying our planet!...........It's where i keep all my Stuff.

    Acting my shoe size since 1979

  11. #25
    Join Date
    May 2007
    Location
    Emerald Qld
    Age
    53
    Posts
    53

    Default

    Quote Originally Posted by echnidna View Post
    d'ya really think another erector will take over the job?

    wishful thinking
    Why not? They would probably agree that they are not installed properly or as should be reasonably expected.
    Stop destroying our planet!...........It's where i keep all my Stuff.

    Acting my shoe size since 1979

  12. #26
    Join Date
    Aug 2003
    Location
    Pambula
    Age
    58
    Posts
    12,779

    Default

    Unfortunately many Aussie tradesman act like big girls and get upset over nothing.
    That is an absolute classic! Oh the irony!!

    I think mine face towards the door. I walk past them every day but I always seem to be thinking about something more trivial than which way the columns face...
    "I don't practice what I preach because I'm not the kind of person I'm preaching to."

  13. #27
    Join Date
    May 2003
    Location
    Kuranda, paradise, North Qld
    Age
    62
    Posts
    5,639

    Default

    If you're that worried about it and are convinced that you're right, well, put your money where your mouth is. Contact the supplier and tell them you believe they are in breach of contract because they are not constructing the shed as agreed. Contact the QBSA, tell them and then toddle off to court, after all there's a few blokes here who are backing you up.

    If it's not documented in the plans or attached notes or you haven't got a written confirmation of the detail you wanted you have absolutely no chance of getting it redone for free. But if course, if it's that important to you you'll end up paying to get it redone regardless because there's just no way you're going to live with it is there?

    Don't take my word for it, or anyone else here, go and talk to the QBSA or see the builder in court.

    Mick
    "If you need a machine today and don't buy it,

    tomorrow you will have paid for it and not have it."

    - Henry Ford 1938

  14. #28
    Join Date
    Aug 2003
    Location
    Pambula
    Age
    58
    Posts
    12,779

    Default

    I've just read through this thing again. I just can't believe that there are people who actually would care which way they're installed, at least not to the point that they would want to pull it down and start again. The really scary thing is that there's every chance a court might actually agree with him.

    So will you walk backwards when you are leaving the shed? I think it's probably the dumbest thing I have ever heard.
    "I don't practice what I preach because I'm not the kind of person I'm preaching to."

  15. #29
    Join Date
    May 2003
    Location
    Kuranda, paradise, North Qld
    Age
    62
    Posts
    5,639

    Default

    Quote Originally Posted by silentC View Post
    .............The really scary thing is that there's every chance a court might actually agree with him...............
    I seriously doubt it. I've managed to stay away from the whole messy litigious thing but unless it's in ther contract documentation then it doesn't really stand a chance. It would go before a building tribunal if I'm not mistaken and they do actually understand how the whole building contract process is meant to run.

    Mick
    "If you need a machine today and don't buy it,

    tomorrow you will have paid for it and not have it."

    - Henry Ford 1938

  16. #30
    Join Date
    Mar 2005
    Location
    Too close to Sydney
    Posts
    1,385

    Default Perhaps a more subtle approach is suitable

    Quote Originally Posted by FlyingDuck View Post
    but after 10 years as a cabinet maker you tend to be a bit pedantic about the little touches that make all the difference.
    Well seeing that my earlier responses where deleted from this thread due to me questioning the honesty of a particular individual based on my personal experience with them, perhaps I should just use his own words and let you decide whether it was warranted.

    On 26 June 2006 FlyingDuck said this:

    I don't have enough experience with woodworking machinery just to be able to walk into a shop and have a brief play with the handles etc to know if it is any good, and besides, I have to buy this gear over the internet while still living in Hong Kong, so don't have the opportunity.
    This you can find here https://www.woodworkforums.com/showpo...67&postcount=3

    and then there was this

    I have not used 3 PH machinery before
    https://www.woodworkforums.com/showpo...20&postcount=1

    and this

    I can't do it with my Triton, as it is too wide.

    Having not used a bandsaw before, why can't you just use rip fence supplied with the machine, as you would on a tablesaw?
    https://www.woodworkforums.com/showpo...56&postcount=1

    I always knew the Triton was the choice of experienced pedantic cabinetmakers.

Page 2 of 4 FirstFirst 1234 LastLast

Similar Threads

  1. My shed accredited shed
    By Waldo in forum WOODWORK - GENERAL
    Replies: 52
    Last Post: 24th November 2006, 03:32 PM
  2. Shed, Garage or Workshop?
    By bitingmidge in forum WOODWORK - GENERAL
    Replies: 36
    Last Post: 2nd July 2004, 01:09 AM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •