Hi
I had a thread for free chip board and mdf panel from a mate who move his factory and I scored enough panelling to line the shed.
So I have started by doing a section at a time.
Attached are some photos of near before,already started removing overhead shelf.
Then I lashed out and got some insulation as this is the west facing wall. I have measured it at 55+ degrees on the inside that is some radiator to stand in front of.
Last one is the panelling is up that was the esay bit as the was no cutting to size just a few holes for PPs All the removal and replacement takes the time. I am debating about the overhead shelf whether to put it back the old one had lighting under it but I have some 4ft fluoros that I might hang from the ceiling joists and leave the shelf out (less places for the junk to collect,, it is sneaky stuff that junk :roll:)
While doing the walls I am treing to thinking of the best way to do the roof. I want to leave the ceiling joists exposed as this is good storage for long bits. So the insulation has to go up to the peak of the roof this will make is a difficult job. More thinking on this.
As I do more I will post more photos
Russell