Quick Canoe 155 - PJ and Cliff's one week build for Tinaroo Raid
Plans by Michael Storer (AKA Boatmik)
Build by Cliff Rogers (AKA Cliff Rogers) with LOTS of help from Peter Ingram-Jones (AKA Still Smilin' but I call him PJ) (Check out more of Pete's work here www.canoesandlampshades.com )
Our plan is to build the Quick Canoe in the week before the 2010 Tinaroo Raid & take it to the raid.... PJ has taken over the plans & has drawn up a schedule.... :rolleyes: :D
To be able to use it on the weekend, we have to have the last coat of paint on by Wednesday night.:oo:
We started just before lunch Saturday 5/6/10. :2tsup:
The shed was NOT ready but it does now have power. (after 5 years of waiting)
We have altered the plans & build sequence slightly.
We want to have a bright finish inside & a painted exterior.
I have some Altex epoxy timber preservative that I want to try so there will be 3 coats of that on the inside with a UV resistant finish over it.
PJ bought the paint & varnish & it is in the shed so I'll get the details later.
So far, besides the wood preserver, the other things we did different were to cut 2 sheets at once & we glued & screwed the stem doubler in before we put the epoxy fillets in.
Did I mention the ply? :think:
It is ALL 4mm marine ply. :oo:
I am working with a weight freak. :doh:
I weight 100Kgs, I will have to loose about 50Kgs before next Friday. :rolleyes:
After we put the keel on, we will 'evaluate' the strength of the floor & maybe install some checker plate. :D
OK, enough waffle, here are the pics.