1 Attachment(s)
Ducting layout for new shed
Attached is what I am thinking of in regards to ducting for dust extraction in my new shed. The diagram is not fantastic (old technology :) ) but as I only have a limited number of tools, I am thinking:
- As soon as the duct comes into the main shed from the wood shed, put in a Y junction and cap one end. This is for later expansion to the other side of the shed.
- On the other end of this Y, put a blast gate which will always be open until any expansion goes on
- The main run will then be completely down one side of the shed, with the most used tools closest to the DC
- for each tool I would probably have a Y junction, a blast gate and a 45% bend to get the ducting down to the tool
By doing it this way I should be able to duct one machine at a time. As this is all new to me, I'd like to get one (or maybe two) done up front and then continue at my leisure.
Does what I am thinking make sense?
thanks
Mick
hoping (fingers crossed) for further feedback
Quote:
Originally Posted by
mick59wests
- for each tool I would probably have a Y junction, a blast gate and a 45% bend to get the ducting down to the tool
Does what I am thinking make sense?
thanks
Mick
I am hoping for some additional feedback, especially on using the y junctions and blast gates.
cheers
Mick
Mark - just read your thread
Mark,
I just read your thread and see with sub-floor 150mm piping yours is a fair bit different to mine
Mick