I have 57m mounds with 2 runs of 13mm poly drip line on top. I made wire clips to hold them parallel but they still snake with expansion and contraction. I do not want to bury them. I calculated there could be 600 change in length.
I was thinking of a spring on the free end probably about 50Kg pull at 600mm. Any ideas where to get springs or a better idea?