1 Attachment(s)
Floating Floor to Tile transition
Hi,
I am currently renovating our master bedroom. I have pulled up the carpet and am about to lay floating floor.
The instructions are that you have to leave about a 10 mm gap from any walls etc.
In the picture you can see where i have the concrete meeting the tiles in the ensuite. There is a metal bar in between.
I am trying to work out what I need to use to cover this gap. I can see some things at bunnings, that I think I am supposed to use, but don't understand how they work and what holds them down
eg https://www.bunnings.com.au/roberts-...-trim_p6827903
This one looks like the middle channel should be clipping on to something?
or should i be using something like this
https://www.bunnings.com.au/roberts-...-trim_p6827961
Please help, before I do something very wrong...
RB