Early dewalt compound sliding mitre saw.
At some stage both alloy fences were bent, so I imported from good ole USA new ones that wouldnt fit. so over past few days have been working out how to build a new fence that will finish up 2M long.
I removed the rest of the alloy fence and the curve bit supposedly to catch dust PFFFT
but how does this go for an idea.
between the 2 slots of the new timber fence is the gap for saw blade, behind that I get a piece of 150mm dia preferably 200mm dia ppvc pile high enough that it wont interfere with sliding or saw blade, stretch it slightly but on either end fit into it 100mm piece cut and beveled to meet the larger pipe shape, Both pieces would connect via a 100mm Y and then into dust blast gates.
I hop my artistic work clarifies that