    Default Elevated Swimming Pool

    I am looking to install a above ground pool on top of my garage. I know that i have to have deep concrete footings for steel posts to sit on and then have steel beams running across teh posts and then install elevated concrete or concrete plates as teh base for the pool. Can this be done and how do you calculate the material needed. I want to get some idea before going and paying engineer to calculate thsi if it is not possible. The pool size will be L6m x W4m x D1.8m.

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many





     
  3. #2
    Scribbly Gum's Avatar
    Scribbly Gum is online now When the student is ready, the Teacher will appear
    Join Date
    Jan 2006
    Location
    Telegraph Point
    Posts
    3,046

    Default

    Quote Originally Posted by epayouh View Post
    I<o></o>I am looking to install a above ground pool on top of my garage. I know that i have to have deep concrete footings for steel posts to sit on and then have steel beams running across teh posts and then install elevated concrete or concrete plates as teh base for the pool. Can this be done and how do you calculate the material needed. I want to get some idea before going and paying engineer to calculate thsi if it is not possible. The pool size will be L6m x W4m x D1.8m.
    Well, that is going to be quite heavy.
    The water alone will weigh 43.2 tonnes.
    In use, that means 43.2 tonnes in motion. Amplify this by the distance above the ground and you have some serious engineering problems to solve.
    I would be consulting the engineers right from the very beginning of this project.
    Cheers
    SG
    .... some old things are lovely
    Warm still with the life of forgotten men who made them ........................D.H. Lawrence
    https://thevillagewoodworker.blogspot.com/

  4. #3
    Join Date
    Dec 2005
    Location
    Canberra
    Posts
    3,260

    Default

    It would probably be easier to demolish the existing garage structure rather than try to incorporate it.

    It's quite possible to do - it's a relatively simple engineering problem to work out how many and what size of steel/concrete beams you'll need to support 40+ tonnes of water.

    However, in this case possible may not equal affordable - I'd guestimate that you won't see a price under $150,000 to build it, and I have a feeling that is on the low side! Basically, if you can't afford to throw money at an engineering firm to do a rough scope of the project, you can't afford to build it.

Similar Threads

  1. Swimming Pool Pool Blanket roller
    By Malcolm Eaton in forum WOODWORK - GENERAL
    Replies: 8
    Last Post: 29th December 2008, 10:41 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •