Thanks Thanks:  0
Likes Likes:  0
Needs Pictures Needs Pictures:  0
Picture(s) thanks Picture(s) thanks:  0
Page 2 of 2 FirstFirst 12
Results 16 to 17 of 17
  1. #16
    Join Date
    Aug 2004
    Location
    Brisbane
    Posts
    5,011

    Default

    Quote Originally Posted by JamesD
    Thanks Mic, will do.

    I have cut the villaboard back 10mm or so, that was fun...

    There is now a sort of little cavity say 7mm under and behind the villaboard. I set the horizontal noggins at about 120mm above the base of the spa line, don't ask me why. One problem that this may cause though is that I will be unable to adhere the Sikaflex to anything behind, if you know what I mean. I will have to carefully fill the space so that the sikaflex sits in the curve of the lip up to the base of the villaboard, but with nothing behind it.

    Do you think that is a problem waiting to happen? I thought about taking about 330mm of the villaboard (up to the next noggin up the wall) and then putting some noggins in right down at the lip, then replacing the board and w/ping the cut line. Do you think that is a good move or think it is ok just to leave it. I guess if the Sikaflex adheres well to the spa lip and the villaboard it would be ok?, not sure though as I don't know what the holding and flexi capabilities of Sikaflex are though.

    Any thoughts you could offer would be great, then with a bit of luck I think it will be plane sailing from there.

    Yep. Plaaane sailing, I'm sure.

    Cheers James
    Hmmm, nothing behind it? doesn't the spa lip have a vertical section that the villaboard laps over? Either just cut the nozzle quite wide to give a big bead of sikaflex and/or you can buy foam packing rods from places like bunnies to fill cavities like that, then sikaflex. Its not for aesthetics so fill er up. You will have a second bite of the cherry when you tile, leave a gap between the bottom tile and the spa and silicone it, don't grout it.

    cheers
    Michael

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Posts
    Many





     
  3. #17
    Join Date
    Apr 2005
    Location
    Brisbane
    Posts
    31

    Default

    Will take your advice and pack the hole up. There is a vertical lip on the spa, just wasn't sure if that alone and the villaboard, which is about 10mm out from it would have been enough. I guess the packing will be good insurance. The wall cavity is still exposed under the spa so I can shove stuff up there to pack it out. Like you said, no asthetics required back there, which is probably a good thing!!

    Many thanks for your help
    If you are going to shoot a bradding nail through your thumb, make sure you miss the bone.

Page 2 of 2 FirstFirst 12

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •