Funny you should mention that. Tommorow I'm going onto the roof of my factory to clean the skylights, so I get some more natural light for the scraping classes.
I still have that little scissor lift on hire, for this job. It hit four days, thats the cut off for a weekly hire. So I have it until Tuesday. It has its own trailer. I'm going to drag it back to Tommytown in the morning. (It's 1.6m at places like Ford). P.S Isn't a scissor lift just a tool to get you up to the level you want to walk on? Like an elevator.
My faith in the sea transport, freight forwarders etc hasn't improved. Its still in Nunawadding. They couldn't supply a flat rack last week. When they finally came good Tuesday after lunch, they put me on notice to have it ready for pick up Friday for the cut off. I was specifically told the boat floats Saturday. They mentioned the "Cut off", being Friday. I that time I have to get it loaded, approved, bagged and boxed, plus I have tp skate it outside.
They purpusly lie, so they can gather up all the containers on the dock 24 -48 hours away from load.
7.30 pm Thursday night I got the call. (We were head down ,axxx up getting finished for Friday noon). Would it be O.K to pick the flat rack up on next Tuesday. Simple matter of fact. Both boats move Wednesday early. I got a qoute for this 3 1/2 months ago.
Its finaly occured to them, that they dont want this over width, over height rack tangeled up with general freight sitting down on the docks.
I have a pick up time from 7.00 am through 11 p.m next Tuesday, so its the last thing on the boat.
-
6th September 2014 09:14 PM # ADSGoogle Adsense Advertisement
- Join Date
- Always
- Location
- Advertising world
- Posts
- Many
-
7th September 2014, 11:57 AM #47SENIOR MEMBER
- Join Date
- Oct 2007
- Location
- Sydney
- Posts
- 2,340
I think it's a power trip for them Phil, I deal with people like that all the time and it's very frustrating. The latest is I have to demonstrate to some 12 buck 50 an hour "security" person that I am carrying my foam ear plugs before they will remotely unlock the door and allow me on to the Tarmac. Hang on, you're a security person not OHS, WFT is whether I have ear plugs any of your concern, if I want to dance around the aircraft naked that's nothing to do with security. But no, that's what they've been instructed by some FW in an office. Why? Because they can and it makes them feel important in their otherwise pathetic life if the get the chance to tell other people how to do their job.
.... And we wonder why Australia is circling the porcelain bowl!
-
7th September 2014, 06:21 PM #48SENIOR MEMBER
- Join Date
- Jun 2011
- Location
- Australia east coast
- Age
- 71
- Posts
- 1,469
If you think it's bad from your side of the docks, it's worse from the other side. Wasn't too bad before 9/11 but after that, all downhill. Then the growth of the OH&S business so everyone had to wear hi vis clothing etc etc. It used to cost us $80K/day what with chater fees etc to have a ship alongside so any delays due to preventable stupidity used to hit me really badly. All this crap makes me very grateful I am no longer involved. Now some of it is a source of income to me, so I'm happy. I just keep in mind the old saying that if you are not part of the solution, there is good money to be made in prolonging the problem..... PDW
-
7th September 2014, 07:27 PM #49SENIOR MEMBER
- Join Date
- Jul 2011
- Location
- Melbourne Australia
- Posts
- 1,128
Though you bloke's might like to see the Sea Bag. This is first thing up on Thursday morning.
They (The packing company) gave me the base sheet a couple of weeks ago. That has to go under the machine. I layed that out Tuesday night, because the crane was coming first thing Wednesday. I put a sheet of 12mm ply down, because the timber on the deck of a flat rack is pretty rough. Then the sheet, then another sheet of 12mm ply, with dressed corners and carpet protectors stapled on.
P1000986.JPG
Then I make surgical incisions in it to get my chains and cross beams through. I think there were 16 cut outs in the bottom sheet.
P1000978.JPG
Then you seal them, best you can. I used that reinforced tape on the inside to stop any of the cuts tearing out, and grey duct tape on the out side.
P1000975.JPG
This timber beam, one of several, the end face of that is the inside of the side of the crate. Because its over width, the side panels 4.5m long, hang off in mid air. They are 166mm wider than the deck. I had to work a bit of magic to hold the side of the box.
P1000981.JPG
This seems criminal to do to a brand new set of chains, we squirt silicon up into the patch, the tape on the inside sorts of holds it, it fills any void in there. You stop when it oozes out of the patch. Its the only way to seal chain. Then you finish the patch on the out side.
P1000983.JPG
Then the bag gets dropped over the top, that's why the scissor lift is on hire. With all the hoo-har about the machine going via Singapore earlier in the week, I went and got another box of desiccant bags and threw them into the machine, just before the bag went on. We are on our second 20l drum of rust veto.
P1000993.JPG
The packing company that supplies the bag and the crate come out and seal the bag. That just a heated clamp. 190degC for 3 seconds, and the sheet melts to each other.
P1000996.JPG
Vacuuming out the bag is very high-tech, it requires a little electric leaf blower. It takes a good 10 minutes or so. Its about 34 cubic meters of air space. Then we back fill it with nitrogen, until the bag puffs up, and leave it for 15 minutes. Then vacuum it out again until the bag sucks in.
P1000997.JPG
This is what it looks like when its finished. That access hole just gets heat sealed.
P1010013.JPG
We are starting to put the crate panels up in that picture. I put M12 eye nuts in the panels, backed up with 12mm plate. I've left them in every panel, so how ever gets to unpack it has a walk up start.
Regards Phil.
-
8th September 2014, 12:55 AM #50SENIOR MEMBER
- Join Date
- Oct 2008
- Location
- N.W.Tasmania
- Posts
- 703
And the load doesn't have to move to be knackered either.
I can certainly understand your frustration with your Captain Feathersword, some of his ideas would seem to lack engineering logic, (I'm thinking of the 18tonnes of lashing to a 5Tonne rated lashing point in particular) and it would be a pretty fair guess to say that he possibly isn't too much of a people person, but as PDW says, the oceans can be very unkind.
Some years ago now, in fact 9 1/2 years ago to be precise, I had a job with Seimens on the BassLink project, the undersea cable linking Victoria's and Tasmania's electric grids together. This entailed having 6 high voltage transformers at each end of the cable as part of the equipment in the switchyard. These transformers weighed in at 250 tonnes each and were built in Germany by Seimens. On the way out the ship conveying the six destined for Tasmania, hit some rough weather as it crossed the Great Australian Bight, and was nearly rolled in heavy seas. while some cargo did come loose, the six big trannies must have been well lashed down, because the lashings held and they had not moved when the ship reached its berth. They were unloaded and delivered to site, and were about to be placed in their final position when someone took a hatch off and looked inside. Then the $hit was redirected by the fan. 4 of the six were written off because the windings of the transformer had bent their mountings and had moved a meter or so sideways, and was at that point only 100mm from touching the inside of the transformer shell. As it was a 250 KV transformer, that was a tad too close, and the whole transformer was written off, even a transformer cooling oil tank which had come in a separate crate, and didn't have a mark on it was scrapped, and it would have been over 1000 litres in capacity I would think from memory. Perhaps a good day for the scrappies, but not a good one for Lloyds of London I imagine.
Incidentally the trailers which came from the N.T. IIRC were quite impressive too. A huge prime mover with very high power, and another known as the pig, because it had a reinforced snout like nose (hence the pig name) to push if necessary. Needless to say there were planetary reduction sets and locking diffs galore too, so this combination could just about shift the pyramids if you could find a strong enough rope, and the trailer was equally impressive. It could be widened or narrowed in width hydraulically, and it had from memory 32 individually steerable wheel-sets, 16 up each side, and each wheel-set at the time cost $125,000 and had 4 wheels making 128 wheels altogether. Not the sort of rig you come across too often in Tassie thank goodness.
Rob.
-
8th September 2014, 08:02 PM #51SENIOR MEMBER
- Join Date
- Jul 2011
- Location
- Melbourne Australia
- Posts
- 1,128
Elvis has left the building.
https://www.youtube.com/watch?v=RZoY...ature=youtu.be
I hooked him up to the little orange caboose and sailed him out the door.
Slight problem this morning with throwing the straps on, the ratchet handles would have ended up on the side of the crate, making it wider. I lost the short end hooks, and direct shackled them to the lugs.
P1010034.JPG
Bit of Enerpac and skate action.
P1010039.JPG P1010040.JPG
Here he is tonight, out the door and skated back across the car park, which is up hill.
P1010049.JPG
Freight is looking better, it has a 2.30 p.m slot on the dock, so they are anticipating a noon'ish pick up. Swing loader pick up, then we will find a place in the street to swing it over onto a step deck low trailer. Back there tomorrow for that, then its done.
Regards Phil.
-
28th September 2014, 09:34 PM #52SENIOR MEMBER
- Join Date
- Jul 2011
- Location
- Melbourne Australia
- Posts
- 1,128
I finally got around to doing the invoice for this tonight. I've been putting it off for weeks as there has been a half inch thick manila folder sitting on the passenger seat of my van.
I'd rather do a tax return than audit up that lot. I can tell you I spent $4.451.05 on odds and sod's. Lashing was the biggest part of it,approaching $2k. The other , 4 dozen dockets, rags,degreaser, coach bolts, eye nuts, all thread, nuts, washers, rustveto, ISPM-15 timber.
I didn't even pay for the crate in that lot, I had the Germans handle that direct, another $2.75k
427.5 hours all up. Only about half of those are mine. I had labour on it. And only about 100 hours over budget. I'll find out this week how much of that I have to wear for doing a decent job.
Regards.
Phil.
-
14th October 2014, 07:38 PM #53New Member
- Join Date
- Nov 2011
- Location
- Lara
- Posts
- 6
You have done well Phil. I'm sorry to see it go home. Enjoyed working on it.
I still make sure that I cut the cable ties nice and flush. Makes them look nice and neat.
Alan
-
15th October 2014, 12:39 PM #54SENIOR MEMBER
- Join Date
- Jul 2011
- Location
- Melbourne Australia
- Posts
- 1,128
Hey Alan.
Alan was the application engineer on those machines since they were new. He & I have spent many a long hour working on them.
The machine is just about there, and I'm still haggling a reasonable price with the Germans.
I have the full costing's and estimates in front of me now. To work out were we made ground, saved on things, to amortise against the additional labour.
In this Pic you can see that the crate hung 170mm over each side of the container.
P1010045.JPG
The 40ft container got shipped to Hamburg for $3,459.00
A 20ft flat rack, was charged at $1,650.00 PLUS Out of Gauge Premium - $7,500.00
Regards Phil.
-
15th October 2014, 04:33 PM #55Pink 10EE owner
- Join Date
- Aug 2008
- Location
- near Rockhampton
- Posts
- 4,304
-
15th October 2014, 05:53 PM #56SENIOR MEMBER
- Join Date
- Jul 2011
- Location
- Melbourne Australia
- Posts
- 1,128
I thought it was even more than that, especially in a 40. But I'm getting my information from the spec plate on the container. Some of them say you can stack them 10 high, that must be an incredible load on the bottom one.
Port Charges here were another $1,545 across both containers.
Do you know what a "BAF" is. That was $737. $965 for the low loader to drag the 20ft flat rack from Nunawading to Port of Melbourne is 26.7 km's according to Google maps.But it did have a side loader involved as well.
Regards Phil.
-
17th October 2014, 03:12 PM #57SENIOR MEMBER
- Join Date
- Oct 2007
- Location
- Sydney
- Posts
- 2,340
Sea freight is incredibly cheap at the moment as I understand there is excess capacity and companies are fighting it out for the available work. Sadly that doesn't translate to container handling in the ports, where there are virtual monopolies and they bend you over to extract whatever they can find ... And then some.
-
29th October 2014, 09:34 PM #58SENIOR MEMBER
- Join Date
- Jul 2011
- Location
- Melbourne Australia
- Posts
- 1,128
This friggen machine has been taking a world tour. It got stuck in Singapore, Currently its in Antwerp. Hamburg is scheduled "mid November" 17th sounds good.
I'm yet to be paid for it. Mostly because I'm 113.5 hours over estimated budget. I'm playing the Russian rouloute game. If it gets there in one perfect piece. Which it will. I'll ping them for full fare.
Mid November is getting the Euro punters excited. Nows the time they are asking about getting that box and container unloaded. I have one serious job next Wedensday, after Melbourne cup. I'll be offering to be on a plane that following weekend.
Regard's Phil.
-
29th October 2014, 10:19 PM #59future machinist
- Join Date
- Mar 2008
- Location
- nowra
- Posts
- 1,361
Thanks for posting this it's been quite interesting
BETTER TO HAVE TOOLS YOU DON'T NEED THAN TO NEED TOOLS YOU DON'T HAVE
Andre
-
29th October 2014, 10:22 PM #60New Member
- Join Date
- Nov 2011
- Location
- Lara
- Posts
- 6
Hey Phil. Don't forget me.
Alan