Thanks Thanks:  0
Likes Likes:  0
Needs Pictures Needs Pictures:  0
Picture(s) thanks Picture(s) thanks:  0
Page 2 of 2 FirstFirst 12
Results 16 to 19 of 19
  1. #16
    Join Date
    Feb 2006
    Location
    Melbourne
    Age
    65
    Posts
    979

    Default

    Quote Originally Posted by gregt View Post
    Here's another bit of advice I was given today from the Paint Place. "You should not undercoat new Gyprock for 6 weeks!" I didn't want to argue with the lady because she was quite a hotty

    Any thoughts on that one?

    Greg
    Hi Greg,

    I will be painting (sealing) gyprock sometime in the next 3 weeks so I was interested to know if that comment was true. However, I went onto the CSR home page and got a PDF file (on the link below) about the material but I didn't see anything about leaving it for 6 weeks. I will send an email to their technical department (within the next fortnight) to clarify the remark.

    http://www.gyprock.com.au/technical/...958A4CE598.pdf

    In the meantime can anyone else give an opinion on which sealer is best?, or have all the painters given their opinion?

    Cheers
    MH

  2. # ADS
    Google Adsense Advertisement
    Join Date
    Always
    Location
    Advertising world
    Age
    2010
    Posts
    Many





     
  3. #17
    Join Date
    Aug 2004
    Location
    Perth WA
    Posts
    2,036

    Default

    The literature says "make sure the joint treatment is thoroughly dry before applying a sealer".

    Lets face it, the muck has to be thoroughly dry before it can be sanded.

  4. #18
    Join Date
    Feb 2006
    Location
    Melbourne
    Age
    65
    Posts
    979

    Default

    Quote Originally Posted by rod1949 View Post
    The literature says "make sure the joint treatment is thoroughly dry before applying a sealer".

    Lets face it, the muck has to be thoroughly dry before it can be sanded.
    That is why we presently have our 2 oil heaters in our laundry and toilet so when the plasterer returns tomorrow morning it will hopefully be totally dry.

  5. #19
    Join Date
    Aug 2004
    Location
    Perth WA
    Posts
    2,036

    Default

    Quote Originally Posted by Metal Head View Post
    That is why we presently have our 2 oil heaters in our laundry and toilet so when the plasterer returns tomorrow morning it will hopefully be totally dry.

    Well thats blown our carbon credits. Yep I know what you mean, where I've laid the muck on a bit heavy its taken at least 2 days to dry.

Page 2 of 2 FirstFirst 12

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •